SUPREME COURT OF INDIA
Messrs Udaipur Phosphates Fertilizers Limited
Vs
Union of India and Another
(S.B.Sinha and Markandeya Katju,JJ.)
31.01.2007
JUDGMENT
Markandey Katju, J.
1. This appeal has been filed against the impugned judgment of the Delhi High Court dated 6.9.1999 in L.P.A. No. 375 of 1999 by which the judgment of the learned Single Judge of the High Court dated 26.5.1999 dismissing the writ petition was upheld.
2. Heard learned counsel for the parties and perused the record.
3. The appellant is a company registered under the Companies Act, 1956 and
is engaged in the manufacture of fertilizers and chemicals. One of the products
it produces is Single Super Phosphate (SSP).
4. Till 1976, the manufacture and sale of SSP was not controlled by the
Government. However, from 1976 to 1982, the manufacture of SSP was subjected to
a system of uniform subsidy whereby each manufacturer was given a uniform rate
of subsidy.
5. In the year 1982, the Government of India brought SSP under a formal price
control known as the Retention Price and Subsidy Scheme (hereinafter referred
to as RPS) for regulating the price and sale of SSP. The scheme had been
introduced on the basis of a detailed study and recommendation of an
Inter-Ministerial Working Group appointed by the Government. Under the RPS, the
manufacturers were obliged to sell their fertilizers at a subsidized price
fixed by the Government, which was below the cost of production. The respondent
No. 2 calculated the cost of production of each unit on the basis of certain
factors such as capacity, location, age of the plant, etc. and added a certain
amount of notional profit, and the result was called the retention price. The
difference between the retention price and the selling price as fixed by the
Government was calculated and paid to the manufacturers as subsidy. Thus, while
price of the fertilizers for the consumers, namely, the farmers was subsidized
by the Government, the manufacturers were given an amount which was calculated
by the FICC on the basis of normative cost of production of the unit which was
to be calculated on the assumption that the unit performed efficiently at 90%
capacity utilization.
6. On 15.1.1986, the Department of Industrial Development, Ministry of Industries issued Press Note No. 1 whereby the capacity indicated in the industrial license could be re-considered with reference to the highest production achieved during any of the previous 5 years plus 1/3rd thereof, provided that was within the licensed capacity plus 25%. Thereafter, the Department of Industrial Development, Ministry of Industry issued Press Note No. 9 (1988 series) on 6.4.1988 w.e.f. 1.4.1988 which provided a scheme for re-endorsement of higher capacity of the fertilizer units. Under the said scheme, the unit could apply for re-endorsement of an enhanced capacity on the basis of the best production actually achieved in any financial year between 1.4.1988 and 31.3.1990.
7. In accordance with the abovementioned Press Note of 1988, the appellant vide
application dated 8.8.1988 applied to the Ministry of Industries for
re-endorsement of the capacity of the appellant unit on the basis of the actual
production between 1.4.1988 and 31.3.1990.
8. Thereafter, the respondents asked for several verifications which were
provided by the appellant. However, it is alleged that despite repeated
follow-ups, after the various verifications, respondent No. 1 issued letter of
approval only on 31.3.1993, i.e. three years after the appellant had applied
for re-endorsement, stating that they were recognizing the appellant's enhanced
capacity of 74, 089 MT from the earlier capacity of 66, 000 MT with
retrospective effect from 1.4.1990. It was further informed that respondent No.
1 was tentatively recovering an amount of Rs. 26.55 lakhs by downward revision
of the ex-works price of the appellant from 1.4.1990. The appellant's grievance
is that the Government has retrospectively re-endorsed the capacity of the
appellant and reduced the price payable to the appellant with retrospective
effect, which effectively denied the appellant from taking advantage of the re-
endorsed capacity. The appellant filed the abovementioned Special Leave
Petition challenging the order dated 6.9.1999 passed by the High Court of Delhi
whereby the learned Division Bench dismissed LPA No. 375/1999 on the ground
that when the appellant had applied for re- endorsement of the capacity, in
view of the fact that the appellant had already achieved the maximum
production, thereby fulfilling the condition of Press Not No. 9 (1988 series),
then the re-endorsement was bound to automatically take place. Further, merely
because it took some time for inspection by the respondents, it did not mean
that the re- endorsement was not automatic.
9. Press Note No. 9 has been quoted in detail in the impugned judgment and
hence we are not quoting it again here.
10. In pursuance of this Press Note the appellant made an application for
re-endorsing the capacity on the basis of actual manufacture during 1st April
1988 and 31st March 1990. The 1st respondent accorded approval of
re-endorsement by letter dated 31st March 1993. The said letter also indicated
that in view of the higher capacity the fixed charges had been re-calculated
from 1st April 1990. The letter stated that on the basis of re-calculation
there would be a recovery of approximately Rs. 26.55 lakhs. A writ petition was
filed challenging the re-calculation of the fixed charges and the recovery of
approximate Rs. 26.55 lakhs.
The learned Single Judge of the High Court dismissed the writ petition on the
ground that once an application was made under Press No. 9, the re-endorsement
was merely a formality in view of the fact that the appellant had already
achieved the maximum production. The learned Judge held that as the appellant
had already produced more, re- fixation of the fixed cost was bound to take
place. The learned Judge held that the fixed cost was bound to come down. The
learned Judge also held that the subsidy has been correctly worked out on the
basis of actual manufacture as undertaken by the appellant.
11. The learned Single Judge in his judgment has observed that the facts as
stated in the application of the appellant dated 8.8.1990 for re- endorsement
of its capacity would substantiate the stand of the respondents that the
appellant-unit had already achieved maximum production and only needed ex-post
facto approval in compliance to the Press Note dated April 6, 1988. It was also
observed that it was clear that the appellant produced more and it could not be
said that no opportunity to actually manufacturing in excess of the endorsed
capacity was provided. The sanction of the respondents vide communication dated
March 31, 1993 is in the nature of ex-post facto approval and cannot be held to
be discriminatory as the fixed cost obviously will come down while
manufacturing more and subsidy had been correctly working out on that basis.
12. In appeal, the Division Bench observed that if the appellant fulfilled the
condition of Press No. 9 then the re-endorsement was bound to take place
automatically. Merely because the respondent would have to make an inspection
that there was no additional investment in the plant, machinery and equipment
exceeding 10% of the book value, and such inspection takes some time, does not
mean that the re-endorsement was not automatic.
13. We agree with the view taken by the learned Single Judge and the Division
Bench that once the appellant's case falls within the criteria laid down in
Press Note 9 then the re-endorsement takes place automatically. Once such
re-endorsement takes place on the basis of actual manufacture the fixed cost is
bound to be revised and hence the subsidy is bound to be reduced.
14. The Press Note No. 9 at paragraph 2f clearly indicates that this scheme is
in addition and not a substitution for the facilities already available under
any existing scheme. Hence, the grievance of the appellant that from the date
of application for re-endorsement i.e. 8.8.1990 till 31.3.1993, when the
re-endorsement was granted, the benefit of subsidy was not given is wholly
untenable on account of the fact that the appellant overdrew the subsidies on
account of the enhanced capacity which was on its own showing an admitted fact.
The appellant was duly informed that their capacity has been enhanced with
retrospective effect from 1.4.1990 onwards to 74, 089 MT (which was the
production achieved by them during 1989-90). It is evident that the appellant
produced more, and the appellant cannot say that no opportunity to actually
manufacture in excess of the endorsed capacity was provided to them. The
communication dated 31.3.1993 has to be deemed to be an ex-post facto approval
of the maximum production already achieved by the appellant. The benefits in
terms of the said scheme have already been availed of and drawn by the
appellant company, and in fact some amount has been found to be overdrawn.
15. In view of the above, we find no merit in this appeal. The appeal is
accordingly dismissed. No costs.