2026 INSC 104

Satinder Singh Bhasin v. Gautam Mullick (Col.)

Neutral Citation
2026 INSC 104
Date
02.02.2026
Year
2026
Source in the index
sci.gov.in neutral-citation

Full text

Reportable
2026 INSC 104
IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION

Civil Appeal No. 13628 of 2025

SATINDER SINGH BHASIN … Appellant
versus

COL. GAUTAM MULLICK & ORS … Respondents

with
Civil Appeal No. 13779 of 2025

&
Civil Appeal No. 13812 of 2025

JUDGMENT

SANJAY KUMAR, J

1. By order dated 04.12.2023 passed in Company Petition IB (IBC)

No. 646/PB/2021, the National Company Law Tribunal, Court – V, New

Delhi Bench1, initiated corporate insolvency resolution process under

Section 7 of the Insolvency and Bankruptcy Code, 2016 2, against M/s.

Grand Venezia Commercial Towers Private Limited 3 and M/s. Bhasin

Infotech and Infrastructure Private Limited 4. Assailing the said order,

Company Appeal (AT)(INS) Nos.1593 and 1594 of 2023 came to be filed
Signature Not Verified

Digitally signed by
KRITIKA TIWARI
Date: 2026.05.12
12:52:01 IST
Reason: 1
For short, ‘the NCLT’
2
For short, ‘the Code’
3
For short, ‘Grand Venezia Ltd.’
4
For short, ‘Bhasin Ltd.’

1

before the National Company Law Appellate Tribunal, Principal Bench,

New Delhi5. Ashok Kumar, the appellant in Company Appeal (AT)(INS)

No.1593 of 2023, is an erstwhile Director of Grand Venezia Ltd., while

Satinder Singh Bhasin, the appellant in Company Appeal (AT)(INS)

No.1594 of 2023, is an erstwhile Director of Bhasin Ltd. On 07.12.2023,

the NCLAT took note of the appellants’ claim that the constructions were

complete and the units were ready to occupy and directed that no further

steps should be taken pursuant to the order admitting the company

petition. The appellants were also directed not to create third party

interests in respect of the respondents’ units. However, by common

judgment dated 29.10.2025, the NCLAT dismissed both the appeals.

Civil Appeal Nos. 13779 and 13812 of 2025 were filed by the appellants

therein against the said judgment.
2. Notably, during the pendency of the proceedings before the

NCLAT, Satinder Singh Bhasin filed I.A. No. 5936 of 2025 in his appeal

seeking permission to deposit ₹15,62,00,000/- to prove his bonafides.

This I.A. was filed after judgment was reserved in the appeals. By order

dated 07.10.2025, the NCLAT rejected his application. Aggrieved,

Satinder Singh Bhasin filed Civil Appeal No. 13628 of 2025.
3. Though Civil Appeal No. 13628 of 2025 filed by Satinder Singh

Bhasin was earlier in point of time, the substantial appeals are the later

5
For short, ‘the NCLAT’

2

ones, i.e., Civil Appeal Nos. 13779 and 13812 of 2025, and we propose

to deal with them in the first instance.
4. Company Petition IB (IBC) No. 646/PB/2021 was filed by 141

individuals against Grand Venezia Ltd. and Bhasin Ltd., the corporate

debtors, seeking initiation of corporate insolvency resolution process

against them under Section 7 of the Code. They claimed to be financial

creditors, being allottees in the commercial complex, named ‘Grand

Venezia Commercial Tower’, which formed part of a composite and

integrated real estate project launched by Bhasin Ltd. in the year 2005.

This project comprised three sections, namely, a luxury five-star hotel,

including integrated office spaces; a mall having food courts, gaming

zones, gondola rides, etc.; and a cineplex for screening of movies. The

petitioners in the company petition were allottees of office spaces. The

land on which this project was to be erected was leased to Bhasin Ltd.

by the Uttar Pradesh State Industrial Development Authority 6 (formerly,

Uttar Pradesh State Industrial Development Corporation). The

possession of the units was to be delivered to the allottees by May,

2013.
5. The complaint of the petitioners before the NCLT was that the units

allotted to them were not made ready and were unfit for occupation.

They asserted that there was no completion certificate provided by the

UPSIDA in relation to their portion of the project and that the part-

6
For short, ‘the UPSIDA’

3

completion certificate which had been issued was only in respect of the

showrooms, food courts, gaming zones and the cinema hall, which were

of no relevance to them. According to them, the corporate debtors had

not even applied for the final completion certificate, as per the RTI reply

dated 24.03.2018 received by them from the UPSIDA. They asserted

that, as per the Rules of the UPSIDA, in the absence of a completion

certificate and without the clearance of the UPSIDA, no

conveyance/sublease deed could be executed or registered, and actual

possession could not be delivered. They pointed out that the property in

question was leasehold land and it was necessary that the UPSIDA,

being the lessor, and the developer, being the lessee, confirmed the

status of the allottees as sublessees, by way of tripartite sublease

deeds. They relied upon their allotment letters which posited that

possession could not be given without such tripartite sublease deeds.

They further asserted that the developers had stopped payment of

assured returns from January, 2014, though the same were to be given

till final completion was accomplished and tripartite sublease deeds were

executed. They, accordingly, sought initiation of insolvency proceedings

against the corporate debtors.
6. Significantly, Bhasin Ltd. failed to file a reply before the NCLT.

Grand Venezia Ltd., however, filed a reply claiming that it was a broker

having purchase/sale rights of the entire building of which Bhasin Ltd.

4

was the developer. According to it, the petitioners before the NCLT were

persons who had refused to clear their dues and take possession. It

alleged that the corporate debtors had received complete payment of the

principal amounts due from 56 allottees/petitioners but they had failed to

pay stamp duty, while 30 allottees/petitioners had not paid even the

principal amounts. It stated that the hotel in the project was being

undertaken by a separate party while construction of the Grand Venice

Mall and Grand Venezia Commercial Tower was completed by Bhasin

Ltd. in 2015. The completion certificate in that regard was stated to have

been issued by the UPSIDA on 16.04.2015 certifying that the units were

completed and, accordingly, it had issued possession letters to the

allottees. Grand Venezia Ltd. claimed that possession had already been

taken by some allottees, in the light of the UPSIDA’s clarification letter

dated 03.03.2017 that the part-completion certificate could be treated as

a part-occupancy certificate. It further claimed that letters had been sent

to the allottees, intimating the compliances achieved and requesting

them to initiate the process of registration of the sublease deeds.
7. After considering the material placed before it and upon hearing

the learned counsel for the parties, the NCLT noted that insofar as

admission of the petition under Section 7 of the Code was concerned, it

was necessary to ascertain whether there was a debt owed to the

financial creditors; whether there was a default with respect to such debt;

5

and, as the financial creditors were allottees of a real estate project, to

ascertain whether they fulfilled the threshold requirement stipulated by

Section 7 of the Code so as to maintain their application.
8. The second proviso to Section 7(1) of the Code prescribes the

threshold requirement in this regard and states to the effect that when

the financial creditors who apply for initiation of corporate insolvency

resolution process are allottees in a real estate project, such an

application should be jointly filed by not less than one hundred such

allottees in the same real estate project or not less than 10% of the total

number of allottees in the same real estate project, whichever is lesser.
9. The company petition was filed on 07.07.2021 by 145 individuals

but as some of them were joint allottees of a single unit, they had to be

counted as one and not as two applicants. An advance copy thereof was

served upon the corporate debtors on 07.06.2021 itself. Thereafter,

when the company petition was returned for curing of defects, 12

allottees who figured as petitioners in the company petition were

removed from the array of parties and 8 fresh allottees’ names were

added. The petition was then registered and numbered on 22.10.2021

and at that time, 141 allottees figured therein as petitioners. The petition

was listed before the NCLT on 27.10.2021 and notice was issued to the

corporate debtors on 21.02.2022. The company petition was admitted on

04.12.2023. Considering the joint allottees amongst the named

petitioners, the NCLT recorded that, in actual terms, allottees of 103

6

units had filed the petition. The NCLT noted that settlements were

arrived at, subsequently, between some of those allottees and the

corporate debtors and such allottees withdrew their names from the

petition. It was contended by Grand Venezia Ltd. that 56 such allottees

paid the principal amounts in full but were yet to pay the stamp duty

while 30 such allottees had not paid even the principal amounts, but the

NCLT noted that no supporting documents had been produced in proof

of these statements. Reliance was placed by the NCLT upon the

judgment of this Court in Manish Kumar vs. Union of India 7, wherein it

was held that the required minimum of 100 allottees was to be

ascertained as on the date of presentation of the application and not at

the time of its hearing or admission. In view thereof, the NCLT opined

that as allottees of 103 units had filed the application, it fulfilled the

threshold of a minimum of 100 allottees, in terms of Section 7 of the

Code.
10. As to the sine qua non for initiation of insolvency process under

Section 7 of the Code, i.e., whether there was a financial debt with a

corresponding default, the NCLT found on facts that the payment

receipts issued by the corporate debtors evidenced that the allottees had

made payments in connection with the units allotted to them and,

therefore, the existence of the financial debt stood substantiated. As to

the plea of Grand Venezia Ltd. that the project had been completed and
7
(2021) 5 SCC 1

7

that it was the allottees who had failed to take possession of their units,

the NCLT observed that the documents placed before it did not manifest

completion of construction. Further, the NCLT also took note of the reply

dated 24.03.2018 of the UPSIDA under the Right to Information Act,

2005, that the developer had not applied for a final completion certificate

and that only a part-completion certificate had been issued. The NCLT,

accordingly, concluded that the corporate debtors had failed to hand

over possession of the units to the allottees and, in consequence, the

default in respect of the financial debt stood proved.
11. Dealing with the contention advanced on behalf of the corporate

debtors that the application was not maintainable as it sought to initiate

insolvency process against two separate corporate entities by way of

one application, the NCLT noted that the Code was silent on initiation

and conducting of insolvency process of related parties in a consolidated

manner. The NCLT opined that interlinkage of related corporate debtors

would be beneficial for value maximization and to continue such

companies as going concerns after completing their insolvency

processes. Reference was made in this regard to the NCLAT’s decision

in Edelweiss Asset Reconstruction Company Limited vs. Sachet

Infrastructure Private Limited8. The NCLT, accordingly, admitted the

petition filed against both the corporate debtors. This order of admission

8
2019 SCC OnLine NCLAT 592

8

was subjected to appeal by the erstwhile Directors of the corporate

debtors before the NCLAT but, as stated earlier, without success.
12. In the impugned judgment dated 29.10.2025, the NCLAT first dealt

with the contention that two separate legal entities could not be

subjected to insolvency resolution process through a single company

petition. It was argued that, if taken separately, the allottees of the two

corporate debtors would not meet the threshold requirement of 100

allottees stipulated in Section 7 of the Code. It was also argued that

there was no default on the part of the corporate debtors, as they had

executed 21 bipartite lease deeds with some of the petitioning allottees

even before the filing of the company petition and had also settled with

some other allottees by refunding their amounts to them. According to

the appellants, the only issue that remained was the execution of

tripartite sublease deeds by the corporate debtors, the UPSIDA and the

allottees. It was stated that a writ petition was filed before the Allahabad

High Court by the management of the corporate debtors to sort out this

issue. Reliance was placed on the part-completion certificate dated

16.04.2015 issued by the Executive Engineer of the UPSIDA and the

clarificatory letter dated 27.06.2015 certifying that the part-completion

certificate was issued for the project, excluding the hotel portion, i.e., it

was issued for the multiplex and the shopping centre. It was pointed out

that it was recorded therein that the building had been constructed with

9

good quality as per the sanctioned plan. According to the appellants,

these documents settled the issue as to whether the subject portion of

the project stood completed or not.
13. The next issue addressed before the NCLAT was whether the

threshold limit of 100 allottees stood satisfied at the time the company

petition was filed. According to the appellants, the allottees of the two

corporate debtors had been clubbed together to bring the number above

the threshold and this was irregular, being contrary to the prescribed

statutory procedure. Another issue that was argued before the NCLAT

was that a single company petition could not have been entertained

against two corporate debtors.
14. The NCLAT noted that no document had been filed in support of

the plea that settlements had been arrived at with some of the petitioning

allottees even prior to the filing of the company petition. In the absence

of such proof, the NCLAT was inclined to accept the finding of the NCLT

that the allottees of 103 units, who had filed the company petition, met

the threshold requirement of a minimum of 100 allottees. While dealing

with the contention that a joint company petition could not be maintained

against two corporate debtors, the NCLAT committed an error by

attributing to the corporate debtors something that was stated by the

allottees in their rejoinder in the company petition. By doing so, the

NCLAT mistakenly inferred that the corporate debtors had themselves

admitted that both the companies were controlled by a single

10

management group. Notwithstanding this mistake, the NCLAT also took

into account allotment letters in favour of allottees which mentioned the

names of both the corporate debtors. Reference was made in one such

letter issued by Bhasin Ltd. to the application submitted by the allottee to

Grand Venezia Ltd. for booking a commercial office space in Grand

Venezia Commercial Tower. On the same lines, the payment receipts

issued to the allottees by Bhasin Ltd. mentioned the payment received

from such allottees for booking spaces in the Grand Venezia

Commercial Tower.
15. Significantly, the allotment letter dated 05.08.2006 issued in favour

of Bhasin Ltd. by the UPSIDA, apropos the lease of the subject land,

specifically mentioned that tripartite lease deeds of the built-up premises

had to be executed by the UPSIDA with the ultimate allottees of the

developer, on the request of the developer in writing. Therein, such

allottees were to be shown as the lessees and the UPSIDA would

transfer the proportionate undelivered interest in the land while the

developer would transfer the interest in the built-up space. It was

categorically mentioned in the said allotment letter that the lease deed of

the built-up space would be executed only after issuance of a completion

certificate for that built-up space. The NCLAT noted that the admitted

position was that no tripartite deed was executed since 2006 even for a

single allottee.

11

16. The NCLAT also noted that the Code did not prohibit the filing of a

petition for initiating insolvency process against two corporate entities

jointly and referred to its earlier judgment in Mist Avenue Pvt Ltd vs.

Nitin Batra and others9. In that case, three companies joined hands to

develop a project. The project was not completed and the companies ran

into rough weather culminating in insolvency proceedings. The NCLAT

held, upon taking a holistic view, that joint insolvency had to be initiated

against all three of them as not doing so would put their allottees to

severe loss and hardship. It was noted that insolvency resolution

process in relation to a real estate project would have different contours

and ramifications and if two or more companies are shown to be closely

connected with the construction and implementation of the project, a

joint petition for initiating insolvency proceedings against such

companies would be maintainable.
17. In this regard, the NCLAT also referred to the Joint Venture

Agreement dated 14.12.2009 between Bhasin Ltd. and Grand Venezia

Ltd. Therein, it was stated that the UPSIDA had allotted land in favour of

Bhasin Ltd. on 05.08.2006; Bhasin Ltd. was constructing a commercial/

shopping complex on the said land; Bhasin Ltd. desired to grant

exclusive marketing rights for the purpose of selling units in the said

commercial complex; Grand Venezia Ltd. approached Bhasin Ltd. and

expressed its willingness and consent to do so; Bhasin Ltd. granted
9
(2025) 261 Comp Cas 516 = 2023 SCC OnLine NCLAT 2915

12

exclusive marketing rights for selling the commercial units constructed

by it; and Grand Venezia Ltd. was authorized to receive and collect

payments on behalf of Bhasin Ltd. only as its agent.
18. This, according to the NCLAT, clearly showed that both the

companies were involved in the project and could not claim to be

independent of each other in relation thereto. The NCLAT also noted

that, though delivery of possession of the units was to be made within

five years from the date of allotment, the same had not taken place till

date as no tripartite sublease deeds had been executed. The NCLAT

opined that the construction had not been completed and found that

assured returns were, admittedly, not paid to allottees since 2014.

Reference in that regard was made to the letter addressed to the

allottees by Grand Venezia Ltd., stating that the possession of the units

would be delivered shortly, as the structure was nearing completion, but

due to a recent slow-down of the real estate market, the revenue

generated was needed and, therefore, difficulty was being faced in

paying the monthly returns to allottees. It was proposed that, in lieu of

the monthly returns for the balance period, i.e., upto the date of handing

over, extra space would be offered after adjusting the balance amount

due from the allottee or the monthly returns would be adjusted against

the outstanding dues for purchase of the unit.
19. The NCLAT also took note of the Status Report dated 11.09.2024

filed by the Interim Resolution Professional appointed by the NCLT on

13

admission of the company petition, which reflected that the construction

of the project was incomplete. The report reflected that the units from the

3rd floor to the 8th floor were bare-shell structures with raw concrete and

debris scattered all around and even basic elements, such as doors,

were missing. It was further recorded therein that no constructions had

taken place from the 9th floor to the 15th floor. Reference was also made

to the NCLAT-appointed-Observer’s Report dated 15.05.2025 and the

UPSIDA’s Report dated 01.05.2025, which affirmed the findings of the

Interim Resolution Professional. Concluding that the construction was

not complete even as on the date of the order, the NCLAT dismissed the

appeals filed by the erstwhile Directors of both the corporate debtors.
20. The core question raised before us on behalf of the appellants is

whether the threshold limit of 100 allottees prescribed by the second

proviso to Section 7(1) of the Code stood fulfilled in the case on hand. It

is contended that, out of the 103 allottees who had applied to the NCLT,

28 allottees had taken possession while 13 allottees were refunded their

monies by the time of passing of the admission order. It is further

claimed that 7 allottees signed settlement deeds but did not take

possession due to registration formalities. Therefore, according to the

appellants, the petitioning allottees with unsettled claims were only 55 in

number. It is on this basis that Satinder Singh Bhasin filed an

interlocutory application before the NCLAT, after judgment was reserved

14

in the appeals, offering to pay ₹15.62 crores to settle the claims of those

55 allottees.
21. However, as noted by the NCLT, no documentary evidence was

produced before it in proof of settlements having been arrived at with

any of the allottees shown as petitioners in the company petition, prior to

the filing thereof. In any event, the day of reckoning stands settled by

this Court in Manish Kumar (supra), wherein it was held that the crucial

date for ascertaining whether the threshold is adequately met is the date

of filing of the petition and not the date of the admission or hearing

thereof.

22. Another argument that has been fervently urged is that the

allottees could not have made substitutions in the company petition after

the filing thereof on 07.07.2021, even if the same was returned for curing

of defects. It is the admitted position that alterations were, in fact, made

in the cause-title with regard to the names of the allottees who appeared

as petitioners therein and the refiled petition did not reflect the same

names as were there in the petition initially filed on 07.07.2021. As an

advance copy of the earlier petition was sent to the corporate debtors on

07.06.2021, the appellants would contend that such changes were made

without the authority of law. They assert that the same amounts to an

abuse of process, warranting rejection of the company petition in limine.

We may note, at this stage, that this argument was not advanced either

15

before the NCLT or even before the NCLAT. However, we propose to

deal with the same as it touches upon and impacts the maintainability of

the company petition. In this context, Rule 28 of the National Company

Law Tribunal Rules, 201610, assumes significance. It reads as under:

“28. Endorsement and scrutiny of petition or appeal or document.-
(1) The person in charge of the filing counter shall immediately on
receipt of petition or appeal or application or document affix the date
stamp of Tribunal thereon and also on the additional copies of the index
and return the acknowledgement to the party and he shall also affix his
initials on the stamp affixed on the first page of the copies and enter the
particulars of all such documents in the register after daily filing and
assign a diary number which shall be entered below the date stamp and
thereafter cause it to be sent for scrutiny.
(2) If, on scrutiny, the appeal or petition or application or document is
found to be defective, such document shall, after notice to the party, be
returned for compliance and if there is a failure to comply within seven
days from the date of return, the same shall be placed before the
Registrar who may pass appropriate orders.
(3) The Registrar may for sufficient cause return the said document for
rectification or amendment to the party filing the same, and for this
purpose may allow to the party concerned such reasonable time as he
may consider necessary or extend the time for compliance.
(4) Where the party fails to take any step for the removal of the defect
within the time fixed for the same, the Registrar may, for reasons to be
recorded in writing, decline to register the pleading or document.”

23. The above Rule reflects that the registration of the pleading or

document, as the case may be, is to take place only after the removal of

the defects therein. Rule 28(2) makes it clear that if, upon scrutiny, the

appeal or petition or application or document is found to be defective,

the same should be returned to the party for compliance. However, Rule

28(3) goes further and states that a party may be allowed to not only

10
For short, ‘NCLT Rules’

16

rectify but also amend such returned appeal or petition or application or

document. Rule 28(4) manifests that it is only after the refiling, upon

curing of the defects, that the Registrar would register the pleading or

document. Rule 29 of the NCLT Rules is titled ‘Registration of

proceedings admitted’ and states that on admission of an appeal or

petition or caveat or application, the same shall be numbered and

registered in the appropriate register maintained in that behalf and the

number shall be entered therein.
24. Ergo, the mere filing of the company petition on 07.07.2021 did not

result in the same being ‘registered’ on the file of the NCLT and it was

only after rectification/amendment of the petition and upon its refiling,

with the defects therein cured, that the same would have been

registered. Notably, in Surendra Trading Company vs. Juggilal

Kamlapat Jute Mills Company Limited and others 11, this Court held

that till the objections in an application filed under Sections 7, 9 or 10 of

the Code are removed, it is not to be treated as an application validly

filed, as it is only after the application is complete in every respect that it

is required to be entertained. Therefore, the alteration in the

memorandum of parties in the company petition after it was filed on

07.07.2021, but returned for curing the defects therein, did not amount to

an abuse of process as is being contended by the appellants. It was only

after ‘registration’ of the company petition takes place under Rule 28(4)
11
(2017) 16 SCC 143

17

of the NCLT Rules that it would have been impermissible for the

petitioning allottees to make any changes therein without the leave of

the NCLT. As the changes in question were made by them prior to that

event, no adverse inference can be drawn against them to non-suit them

on that ground. Reliance placed on Gurdial Singh and others vs. Raj

Kumar Aneja and others12 is of no avail to the appellants as the ratio

laid down therein that a pleading, once filed, forms part of the Court

record and could not be touched/modified/ substituted/amended except

with the leave of the Court, has no application on facts, in the light of the

procedure prescribed under the NCLT Rules.
25. As regards the contention that a joint company petition could not

have been filed for initiation of insolvency process against two separate

companies, we may note that the letter of allotment, in relation to the

leased land, was issued by the UPSIDA on 05.08.2006 in favour of

Bhasin Ltd alone. The project was, therefore, to be undertaken

essentially by Bhasin Ltd. It was only thereafter, i.e., on 14.12.2009, that

Bhasin Ltd. entered into an agreement with Grand Venezia Ltd., granting

it marketing rights in relation to the sale of units in the project. It is a

matter of record that the two companies had common directors,

including Satinder Singh Bhasin, for some length of time. Further,

demand notices and possession letters were issued by Bhasin Ltd. to

the allottees of Grand Venezia Ltd. and the
12
(2002) 2 SCC 445

18

correspondence/communications with the allottees were by both the

companies interchangeably. Payment receipts also manifested the

same. These documents formed part of the company petition.
26. Further, in its reply dated 07.07.2022 filed before the NCLT in the

company petition, we find that Grand Venezia Ltd. had stated that it was

a ‘highly reputed marketer’ and had acquired exclusive marketing rights

for selling the units in the commercial complex constructed by Bhasin

Ltd., vide the Agreement dated 14.12.2009. This claim stands decimated

by the fact that Grand Venezia Ltd. was incorporated and came into

existence only in November, 2009, barely a month earlier. It, therefore,

had no reputation or experience as a marketer, so to speak of, and

appears to have been incorporated only for the purpose of entering into

an agreement with Bhasin Ltd. in relation to the subject project. Before

us, the appellants have stated that Grand Venezia Ltd. purchased 1,114

units in the project from Bhasin Ltd. on 31.03.2016 for ₹218 crores.

There is, thus, no possibility at this stage for either company to say that

they are not jointly liable to the allottees of the project. The NCLT and the

NCLAT were, therefore, justified in concluding that the corporate debtors

were intrinsically linked and that it would be in their interest to have a

joint insolvency process so as to maximise asset realisation.
27. Significantly, in Edelweiss Asset Reconstruction Company Ltd.

(supra), the NCLAT was dealing with five companies which had jointly

undertaken development of a township. The NCLAT opined that a ‘Group

19

Corporate Insolvency Resolution Process’ proceeding was required to

be initiated against all five of them in such circumstances. This order

stood confirmed, when Civil Appeal (Diary) No. 1010 of 2020,

challenging the same, was dismissed by this Court on 10.02.2020.

Earlier, in Mamatha vs. Amb Infrabuild P. Ltd. and others 13, the

NCLAT had observed that if two corporate debtors collaborate and form

an independent corporate entity for developing land and allotting

premises to allottees, the application under Section 7 of the Code would

be maintainable against both of them jointly and not individually against

one or the other. This judgment was confirmed by this Court when the

Civil Appeal filed by one of the corporate debtors was dismissed, vide

the order reported in AMB Infrabuild P. Ltd. vs. Mamatha and

another14. The argument that these were two completely independent

and separate companies, therefore, falls to the ground. In any event, as

they were jointly answerable to the allottees, the filing of a single

company petition against them was justified.
28. We may now turn to the claim of the appellants that the

construction was complete and that the units were ready for occupation

before the date of filing of the company petition. According to the

UPSIDA, which had allotted land to Bhasin Ltd. for erecting this project,

the construction was to be put up within 5 years from the date of

13
(2019) 5 Comp Cas-OL 130 = 2018 SCC Online NCLAT 785
14
2019 SCC Online SC 2410

20

allotment, which is long past. The project to be put up on the allotted

land was a single project, comprising a mall up to the 3 rd floor,

commercial spaces from the 3 rd to the 15th floor and a hotel in the

adjacent structure. As per Clause 3(p) of the lease deeds dated

23.08.2006 and 30.09.2009, Bhasin Ltd. was required to construct the

buildings on the leased land within 60 calendar months from the dates

on which the lease deeds were executed or such extended period of

time as was allowed by the UPSIDA in writing. The UPSIDA asserts that

the delay in completion of the project and in execution of tripartite

sublease deeds is attributable to the corporate debtors.
29. The UPSIDA claims that the corporate debtors committed default

in payment of its outstanding dues and had not even furnished to it the

final list of allottees. It further stated that it was never called upon to

execute tripartite lease deeds and, on the other hand, Civil Suit No. 257

of 2018 was filed by Bhasin Ltd. challenging the clauses in the lease

deeds which stipulate that such tripartite lease deeds had to be

executed. The suit is stated to be pending. The list of allottees was

communicated to the UPSIDA for the first time under letter dated

18.04.2024 but it was full of discrepancies and the final undisputed list of

allottees is yet to be shared with it. This was stated to be the sine qua

non for execution of tripartite lease deeds. It was stated that the project

does not have a final completion certificate for the entire construction

21

and the hotel part of the project was not complete. The UPSIDA asserted

that the part-completion certificate was conditional and was not for the

whole project. According to it, affidavit dated 28.01.2022 was filed in the

suit, stating that the part-completion certificates dated 07.05.2011 and

16.04.2015 were ineffective as the conditions stipulated therein were not

complied with. The UPSIDA further stated that its dues of ₹54.38 crores

were payable by Bhasin Ltd. The writ petition filed against it by Bhasin

Ltd. in that regard was dismissed by the Allahabad High Court on

08.09.2025, granting liberty to the UPSIDA to approach the Interim

Resolution Professional (IRP) to lodge its claim.
30. In this regard, we may note that Regulation 2.16.0 of the Uttar

Pradesh State Industrial Development Area Building Regulations, 2004,

falling in Chapter-2, titled ‘Procedural Requirements for Building

Permission’, deals with ‘Occupancy Certificate’ and states that no

building erected, re-erected or altered, shall be occupied in whole or in

part until the issuance of an Occupancy Certificate by the Authorised

Officer in the form given in Appendix-11. It is an admitted fact that an

Occupancy Certificate in the prescribed format in Appendix-11 has not

been issued by the UPSIDA till date for the project.
31. ‘Handing over/Taking over of possession’ letters issued by Bhasin

Ltd. in favour of allottees, recording delivery of possession of particular

units, have been placed on record. However, we find that some of those

letters pertain to the 1st floor of the building, with which the petitioning

22

allottees in the company petition have no concern. Those letters,

therefore, do not further the case of the appellants. A letter was issued in

relation to a unit on the 7th floor in favour of one Sheetal Badhwar but the

undertaking of that allottee records that the sublease deed with the

UPSIDA was yet to be executed. Further, notional possession letters

were also issued to allottees, which are of no significance whatsoever.

These so-called letters of actual delivery of physical possession, in our

considered opinion, have no legal import given the categorical stipulation

by the UPSIDA in its allotment letter and also the lease deeds that

physical possession should not be delivered to allottees without

execution of the tripartite sublease deeds.
32. Though the appellants also place reliance on the part-completion

and part-occupancy letters received from the UPSIDA in 2015 and

earlier, coupled with the notional/physical delivery of possession letters

issued to the allottees, the same have to be construed and understood

in the context of the extant legal regime and the contractual clauses

between the parties. The clauses in the allotment letter dated

05.08.2006 and the clauses in the lease deeds of the UPSIDA made it

clear that possession could not be offered to allottees without tripartite

sublease deeds being executed. This was clarified by the Regional

Manager of the UPSIDA in his letter dated 21.02.2023 addressed to one

of the allottees under the Right to Information Act, 2005. He confirmed

23

therein that no tripartite sublease deed had been executed in favour of

any allottee till that date and in the event the builders had executed

sublease deeds directly in favour of any allottees, the same would be in

clear violation of the terms and conditions of the allotment letter and the

lease deeds.
33. We may note that some of the letters issued in the year 2015 by

Bhasin Ltd. merely offered notional possession to the allottees. Letter

dated 13.10.2015 addressed to Kanwaljeet Singh, one such allottee, is

placed on record in this regard. The part-completion/part-occupancy

letters and the notional/physical possession delivery letters issued to the

allottees, therefore, can be taken to be proof of completion of the

construction in all respects, as is being claimed by the appellants.

Further, their claim in that regard is also belied by the Commissioner’s

Report dated 17.05.2018 filed before the High Court of Delhi in an earlier

winding-up proceeding. Therein, the Commissioner had recorded that

none of the units were ready and fit for occupation as on the date of his

inspection. This report formed part of the record before the NCLAT.
34. Though we would have ordinarily restricted the scope of enquiry in

this regard to documents prior to the date of admission of the company

petition and which formed part of the record before the NCLT, we may

note that the appellants secured an interim order from the NCLAT on

07.12.2023 by claiming that the construction was complete and that the

units were ready to occupy. This interim order continued to operate for

24

nearly two years thereafter. It was during the pendency of the

proceedings that the NCLAT undertook the exercise of verifying this

claim of the appellants and appointed an Observer to visit the premises

and submit a report as to the situation actually obtaining. It was pursuant

thereto that the Observer’s Report dated 15.05.2025 came to be filed

before the NCLAT leading to the dismissal of the appeals on 29.10.2025.

We are, therefore, of the opinion that this report also warrants

examination.
35. In his report dated 15.05.2025, the Observer stated that he had

visited the subject premises on 10.05.2025, accompanied by the

representatives of the suspended management of the corporate debtors,

the financial creditors and the UPSIDA. With regard to the units on the

9th, 10th, 11th, 12th and 14th floors, the Observer noted that only 1 out of

the 6 lifts in the office building/commercial tower was working but that lift

also had accessibility only till the 9th floor. On that floor, the Observer

found that no units had been constructed and was told by the

representative of the suspended management that no units had been

constructed on the 9th floor and above till the terrace, i.e., the 15 th floor.

As regards the units on the 3 rd, 4th, 5th, 6th, 7th and 8th floors, the Observer

noted that upon reaching the 8 th floor, he found that the said floor was

partly constructed but lacked basic amenities such as bathrooms,

lighting, air-conditioning, etc. No fire safety equipment was installed on

25

the said floor. Similar was the situation with the 5 th, 6th and 7th floors. On

the 4th floor, the Observer found that the unit walls were made of

gypsum-like material and not brick. Again, basic amenities were missing

and the Observer opined that it would not be possible to hand over

immediate possession to the allotees of the units on this floor. The units

on the 3rd floor were also found to be in the same condition, as some

units did not have partitions between them and a lot of construction

material was stored in one unit. He concluded that, at present, the

commercial tower/office building integrated with the mall was only

partially built and lacked basic amenities. He further stated that the units

situated on all the floors required substantial amount of work to be done

before giving possession to the allotees in a fit and proper state. The

pictures appended to the Observer’s Report in relation to the 3 rd floor

show that there is no possibility of actual physical possession being

delivered of any unit on that floor to the allotees.
36. Viewed thus in totality, the contention of the appellants that the

construction was completed in all respects and possession was

delivered to some of the petitioning allottees is found to be without merit

and factual foundation. Notwithstanding the letters and documents

sought to be relied upon in that regard, the ground reality is otherwise.

Neither has the construction been completed nor could possession of

26

units be delivered to the allottees without fulfilling all necessary

formalities in that regard after completion of the building in all respects.
37. On the above analysis, we hold that the company petition instituted

under Section 7 of the Code against both the corporate debtors by the

allottees of 103 units was maintainable on all counts. The petitioning

allottees duly established their financial debt and also the default in

connection therewith, inasmuch as the units for which they had paid

valuable consideration were not made ready and delivered to them till

date. We, accordingly, find no error having been committed either by the

NCLT in admitting the company petition or by the NCLAT in confirming

the same in appeal. Hence, Civil Appeal Nos. 13779 and 13812 of 2025

are bereft of merit and deserve to be dismissed.
38. Insofar as Civil Appeal No. 13628 of 2025 is concerned, the offer

made by Satinder Singh Bhasin, the appellant therein, to deposit a sum

of ₹15.62 crores was based on the premise that the said amount would

suffice to settle the claims of the 55 alleged allottees who, according to

him, still remained in the fray after settlement of the claims of the other

petitioning allottees in the company petition. In the light of what has been

stated by the NCLT and the NCLAT and what we have recorded

hereinabove, this premise is itself found to be without basis. Therefore,

the order passed by the NCLAT rejecting the offer made by Satinder

Singh Bhasin, vide the order dated 07.10.2025, does not warrant

27

interference either on facts or in law. This appeal is equally devoid of

merit.
All the three appeals are, accordingly, dismissed.
Pending applications shall also stand dismissed.

…………………………, J.
SANJAY KUMAR

…………………………., J.
K. VINOD CHANDRAN

February 2, 2026
New Delhi.

28