2025 INSC 1338 REPORTABLE

IN THE SUPREME COURT OF INDIA
INHERENT/ORIGINAL JURISDICTION

IN RE : ISSUE RELATING TO DEFINITION OF ARAVALI
HILLS AND RANGES

I.A. NO.105701 OF 2024
(CEC REPORT NO. 03 OF 2024)

IN

WRIT PETITION (C) NO.202 OF 1995

IN RE: T.N. GODAVARMAN THIRUMULPAD
…PETITIONER

VERSUS

UNION OF INDIA AND OTHERS …RESPONDENTS

JUDGMENT

B.R. GAVAI, CJI

IMPORTANCE OF ARAVALIS

1. In the present matter, we are concerned with the

definition of Aravali Hills and Ranges and the need for the

proper conservation of the same in the States of Delhi,

Signature Not Verified Haryana, Gujarat and Rajasthan.
Digitally signed by
NARENDRA PRASAD
Date: 2025.11.20

2. The Aravali Range spanning across the aforesaid four
18:32:32 IST
Reason:

States is one of the oldest geological features on planet Earth.

1

It is one of the oldest fold mountains in India. It is rich in

wildlife, flora and fauna, and significantly influences the

climate and biodiversity across North India.

3. The scientific assessments of the Aravali Range

establish the fact that the Aravali ecosystem acts as a “green

barrier” and forms an effective “shield” against desertification

by preventing the eastward spread of the Thar Desert towards

the Indo-Gangetic plains, Haryana and western Uttar Pradesh.

PREVENTION OF DESERTIFICATION AND LAND DEGRADATION

4. The United Nations Convention on Combat

Desertification1 was ratified by India on 17th December 1996.

5. Article 4 of the said Convention requires the States,

which are parties to it, to inter-alia adopt an integrated

approach to address the physical, biological and socio-

economic aspects of desertification, promote the conservation

of land and water resources as they relate to desertification,

and to determine institutional mechanisms for the same.

6. As per Article 5 of the said Convention, India as a

signatory to the UNCCD, is required to strengthen the existing

laws, enact new laws as may be needed, and undertake long-

1
Hereinafter, “UNCCD”.

2

term policy measures and action programmes to combat

desertification.

7. A perusal of Articles 10(2)(c) and 10(4) of the said

Convention would reveal that national action programmes in

this regard are required to be framed and particular attention

must be given to preventive measures for lands that are not

yet degraded, or which are only slightly degraded.

8. In order to give effect to its commitments under the

UNCCD, the Ministry of Environment, Forest and Climate

Change2 issued a National Action Plan to Combat

Desertification and Land Degradation through Forestry

Interventions in 2023. The said Plan highlights the need for a

synergistic and convergent implementation of eco-restoration

initiatives in the country.

9. In recognition of the ecological importance of the

Aravali Ranges, the MoEF&CC has also launched the “Aravali

Green Wall Project”, an initiative aimed at restoring degraded

land, preventing desertification, enhancing green cover and

improving the ecological health of the Aravali landscape.

2
Hereinafter, “MoEF&CC”.

3

10. These cumulative obligations in international law

require that a uniform and streamlined approach be taken

towards the preservation and restoration of the Aravali

ecosystem including regulation of exploitation of the Aravali

Hills in a scientific and sustainable manner, guided by the

precautionary principle.

PROCEEDINGS BEFORE THIS COURT

11. This Court is seized of the issues with regard to the

Aravali Hills and Ranges in two sets of proceedings. The first

is in M.C. Mehta v. Union of India and Others3 and the

second one is in T.N. Godavarman Thirumalpad v. Union

of India and Others4.

12. When T.N. Godavarman Thirumalpad was listed

before this Court on 10th January 2024, an issue arose for

consideration as to whether some of the mining activities were

falling in the Aravali Hills or beyond it.

13. The learned Senior Counsel appearing for the State of

Rajasthan on that day had raised an issue as to whether the

classification between the Aravali Hills and Aravali Ranges,

3
WP(C) No.4677 of 1985
4
WP(C) No.202 of 1995

4

insofar as the mining activities are concerned, needs to be

finally decided by this Court.

14. On similar lines, the learned Amicus Curiae had also

raised an issue as to whether continuation of the mining

activities in Aravali Hills and Ranges was in the larger public

interest or not. The learned Amicus had therefore suggested

that it will be appropriate if all the issues with regard to the

Aravali Hills and Ranges be examined by the Central

Empowered Committee5 and directions be issued by this Court

in that regard.

15. We had, therefore, vide our order dated 10th January

2024 requested the CEC to examine as to whether the

classification of Aravali Hills and Ranges insofar as permitting

mining is concerned, needs to be continued or not. We had

also requested the CEC to take on board the experts in geology

before finalising its report.

16. Vide the said order, this Court also noticed that the

issues with regard to the mining in Aravali Hills and Ranges

in the State of Haryana were placed before another Bench of

this Court hearing M.C. Mehta (supra) and the issues with

5
“Hereinafter, “CEC”.

5

regard to mining in Aravali Hills and Ranges in the State of

Rajasthan was being considered by this Court in the present

proceedings. We had, therefore, directed that both the matters

be placed before the then Hon’ble Chief Justice of India for

placing the same before one and the same Bench so as to avoid

any conflicting order(s).

17. In pursuance to the order passed by this Court on

10th January 2024, the CEC submitted its report on 7th March

2024 (CEC Report No.3 of 2024).

18. It will be relevant to refer to the recommendations

made by the CEC in its report i.e., CEC Report No. 3 of 2024,

which read thus:

“I. RECOMMENDATIONS
i) Mapping of the entire Aravalli Hill Range should be
undertaken and completed within a period of six
months by the Forest Survey of India, as per the
norms followed for the State of Rajasthan. The
National CAMPA may be directed to release funds
required for the mapping purpose. All the mapped
areas should be geo-tagged.
ii) Macro-level EIA study of all mining affected
districts of Rajasthan falling in Aravalli Hill Ranges
should be done by ICFRE and/or any other
competent national level central government
institution as was done in case of Karnataka in
compliance of the orders of this Hon’ble Court in
WP(C) 562/2009 dated 05.08.2011. The level of
mineral extraction should also be analysed along
with EIA study, on the basis of local requirement of

6

minerals, available infrastructure and environmental
concerns. This study can be completed in six months
period. The funds can be made available by MoEFCC
from the National CAMPA. Till this exercise is
completed no new mining leases or renewals of old
mining leases should be allowed in the Aravalli Hill
Ranges.
iii) Mining should be strictly prohibited in following
areas falling under such mapped Aravalli Hill Range:
a) Protected Areas including Tiger
Reserves declared under Wild Life
Protection Act 1972.
b) where ESZs of protected areas
mentioned in (i) above have been notified –
within ESZ and up to 1 km from the
boundary of these ESZ; and within 10 kms
of boundary of protected areas mentioned
in (i) where ESZ has not been notified.
c) all identified Tiger Corridors.
d) within 2 km radius/boundary of
perennial water bodies and wetlands
identified and notified as Ramsar Sites the
wetlands notified as per provisions laid
under Rule 3(b) of the wetlands
(Conservation and Management) Rules,
2017.
e) all areas where plantations have been
raised with funds from any government or
agency.
f) all those minerals where mining disturbs
larger volume of minerals and soils but
yields low revenue such as masonry stone.
g) areas which are falling within the NCR.
h) regions where there are proven or
potential water aquifers or aquifer
recharge areas or wherefrom groundwater
is sourced for irrigation and/or drinking
purposes.

7

i) Areas which have been identified as
DARK Zone by the Groundwater Board
such as Faridabad and Gurgaon.
j) within 10 km aerial distance on either
side of the inter- state boundary between
Rajasthan and Haryana States along
Aravali Hill range.
iv) All mining in forest areas falling in Aravali Hill
Ranges should be suspended and may be allowed
after completion of mapping of area and EIA study,
only in exceptional circumstances, and after due
permission from this Hon’ble Court.
v) The mining in other areas may be permitted only
after all the statutory clearances / approvals
including environmental clearance have been
obtained and renewals should also be done only after
grant of fresh environmental clearance.
vi) The States shall first identify all the abandoned
mining sites of area which exceeds one hectare, both
legal and illegal, within a period of six months.
Thereafter, the States shall prepare a site-specific
reclamation and rehabilitation plans for all these
sites and submit them along with the maps to the
CEC. Once these plans are approved, the States will
execute them in a time bound manner.
vii) Mines which have reached the groundwater level
should be closed to prevent destruction of
underground aquifers, wastage of water and
depleting of groundwater.
viii) The mining leases found to have been operated /
being operated without the requisite statutory
approvals/ permissions and/or found to have
exceeded permissible production limits and/or not
following the mining plan prescriptions should be
immediately closed and shall be liable to be
terminated. Also, no mining lease where any
condition of EC or any other statutory condition has
been violated, renewal should not be allowed in any
circumstances.

8

ix) Online Integrated Lease Management System
(ILMS) for computerized and network-based
management of mineral production and dispatch,
collection of royalty, issue of permit and generation
and submission of online reports involving mining
leases and crusher operations, on the lines being
followed by the State Government of Karnataka
should be implemented immediately.
x) The licenses to stone crushers may be given on the
basis of quantity of raw mineral available in the area
to prevent illegal mining and permit sustainable
mining as has been permitted by this Hon’ble Court
for the wood based industries (saw mills and plywood
factories).
xi) No crusher shall be located within 10 km. aerial
distance from the boundary of Aravalli Hill Range.
Clusters may be located in a cluster similar to an
industrial estate where all inward coming raw
material and outgoing finished/ processed product is
controlled and regulated on real time basis.
xii) Use of explosives in mining should be
discouraged and may be allowed where Indian
Bureau of Mines (IBM) certifies that its use is
essentially required.
xiii) Regular biennial evaluation of the cumulative
impacts of existing and proposed mining activities in
the entire Aravalli region should be ensured to
prevent exceeding the ecosystem’s carrying capacity
xiv)Independent and transparent environmental
monitoring mechanisms should be established
preferably under the chairmanship of Chief Secretary
of the state to ensure compliance of all regulations
and also action taken where there are non-
compliances.
xv) In districts involving heavy mining a District Task
Force of Revenue, Forest, Police and Mining
Department should be constituted to control illegal
mining.”

9

19. In the meantime, in pursuance to the order passed by

this Court dated 10th January 2024, the then Hon’ble Chief

Justice of India constituted a Special Bench comprising of

B.R. Gavai and Abhay S. Oka, JJ. (as they then were).

20. Upon perusal of the report of the CEC dated 7th March

2024, this Court by an order dated 9th May 2024 passed in

M.C. Mehta (supra) taken along with the present proceedings,

found that the issue with regard to mining activities in the

Aravali Hills and Ranges needs to be addressed jointly by the

MoEF&CC as well as all the four States i.e., National Capital

Territory of Delhi and States of Rajasthan, Haryana and

Gujarat.

21. Pertinently, this Court vide the aforesaid order also

noticed that one of the major issues with regard to the illegal

mining was on account of different definitions of “Aravali

Hills/Ranges”, as adopted by the different States.

We, therefore, directed that a committee be constituted for

providing a uniform definition of the Aravali Hills and Ranges.6

6 Hereinafter, “Committee”.

10

22. It will be relevant to refer to the entire order passed by

this Court on 9th May 2024, which reads thus:

1. Since certain matters from State of Rajasthan with
regard to mining in Aravalli Ranges and Hills were
pending before the Bench presided over by one of us
(B.R. Gavai, J.) and other matters from State of
Haryana were pending before the Bench presided
over by one of us (Abhay S. Oka, J.), the matter was
referred to the Hon’ble the Chief Justice of India with
an observation that it will be appropriate that all the
matters are heard together so that the issues are
addressed commonly.
2. Accordingly, a Special Bench consisting of the two
of us has been constituted under the orders of the
Hon’ble the Chief Justice of India.
3. There are certain issues with regard to illegal
mining as well as mining under the permissions
granted by the States in Aravalli Hills/Ranges.
One of the major issues is with regard to the
different definitions of “Aravalli Hills/Ranges”, as
adopted by different States. The learned Amicus
Curiae states that insofar as the State of Haryana
is concerned, there is not even a definition of
Aravalli hills and ranges.
4. The Central Empowered Committee (CEC) has
submitted its Report No.3/2024, wherein certain
aspects have been pointed out. The Report also
points out various illegal mining activities carried
out throughout the State of Rajastan, district
wise details have been given with regard to the
areas under illegal mining.
5. In the report of the CEC, a report prepared by
the FSI is annexed. As per the Report of the FSI
the definition of Aravalli hills has been given as
the hill as well as the uniform 100 meter wide
buffer surrounding the downside of the hills.
6. We find that the issue with regard to the mining
activities in the Aravalli Hills and Ranges needs

11

to be addressed jointly by the Ministry of
Environment, Forest and Climate Change
(MoEFCC) as well as all the four State
Governments i.e. the Government of National
Capital Territory of Delhi (GNCTD) and the States
of Rajasthan, Haryana and Gujarat.
7. We, therefore, direct that a Committee be
constituted comprising of the following
officers/officials to have a uniform definition of
the Aravalli hills and ranges:-
i. Secretary, Ministry of Environment, Forest
and Climate Change, Government of India.
ii. Secretaries of the Department of Forests,
Government of National Capital Territory of
Delhi and the States of Haryana, Rajasthan and
Gujarat.
iii. A representative of the Forest Survey of
India.
iv. A representative of the Central Empowered
Committee.
v. A representative of the Geological Survey of
India.
vi. Joint Secretary, Ministry of Environment,
Forest and Climate Change, Government of
India, shall be the convenor of the Committee.
8. The said Committee shall submit its report within
a period of two months from today.
9. In the meantime, we also issue the following
directions, as suggested by Shri P. Parameshwar,
learned Amicus Curiae, to which Shri Tushar Mehta,
learned Solicitor General of India appearing for the
State of Haryana and Shri K.M. Natraj, learned
Additional Solicitor General of India appearing for the
State of Rajasthan, do not have any objection:-
i. Direct the Union of India through the
MoEFCC, State of Rajasthan, State of
Haryana and GNCTD to file affidavits with
details comments on the CEC Report

12

No.3/2024 and also the issues identified
hereinabove.
ii. The States of Haryana and Rajasthan
should specifically indicate what steps for
compliance of 15 (fifteen)
Judgments/Orders of this Court’s have
been taken by the respective States.
iii. The States of Haryana and Rajasthan
should specifically state what action has
been taken on the CAG/CEC Reports on
illegal mining and whether prosecution
under the relevant State Laws and
Recovery Process has been undertaken.
iv. The State of Rajasthan to specifically
state the actions taken pursuant to the
FSI Report dated 22.02.2018 where illegal
mining polygons have been identified.
v. The State of Rajasthan be directed to
reply to the FSI Report submitted to this
Court pursuant to Order dated
19.02.2010. The FSI Report dated
25.08.2010 and the CEC Report thereon
dated 25.10.2010 were shared with the
State of Rajasthan way back in 2010.
vi. The States of Rajasthan and Haryana
shall also state the extent and mapping of
all boundaries of mining areas (mentioned
in the mining leases) within the area of the
State.
10. Shri K. Parameshwar, learned Amicus Curiae,
has further submitted that until further orders are
passed by this Court, no fresh mining leases or
renewal of existing mining leases should be permitted
in Aravalli Ranges and Hills in the States of Haryana
and Rajasthan.
11. The said suggestion is opposed by Shri Tushar
Mehta, learned Solicitor General of India and Shri
K.M. Natraj, learned Additional Solicitor General of
India and Shri A.N.S. Nadkarni, learned senior

13

counsel appearing for the Federation of Associations
of Mining in Rajasthan. It is submitted that millions
of labourers are dependent upon the mining activities
carried out in these States. It is submitted that if the
order, as sought by the learned Amicus Curiae is
passed, it would have a cascading effect on the
livelihood of millions of labourers.
12. According to our experience and as has been
pointed out by this Court, in the judgment of this
Court dated 10.11.2021 passed in C.A. No.3661-
3662/2020, a total ban on mining is not conducive
even to the interest of the environment, inasmuch as
it gives scope for illegal mining.
13. In that view of the matter, to balance the
competing interest, we find that the following
direction would subserve the purpose:-
“Until further orders, though all the States
in which Aravalli Ranges and Hills are
situated would be at liberty to consider
and process the applications for grant of
mining leases and also for renewal thereof
including obtaining statutory clearances
from the various authorities, no final
permission shall be granted for mining in
the Aravalli Hills/Ranges, as defined in the
FSI Report dated 25.08.2010, without
permission from this Court.”
14. Needless to state that this order in no way shall
be construed as prohibiting the legal mining
activities which are being carried out in accordance
with the valid permits/licences.
15. Needless further to state that our orders are
restricted only to the mining in the Aravalli
hills/ranges.”
[Emphasis supplied]

14

23. It appears that thereafter the matter was adjourned

from time to time so as to enable the Committee constituted

as per the order dated 9th May 2024 to submit its report.

24. When the matter was, thereafter, listed on 12th August

2025, by way of last chance, this Court had granted two more

months’ time so as to enable the Committee to submit its

report.

25. Accordingly, the Committee submitted its report via

the MoEF&CC on 3rd October 2025.

26. We have extensively heard Mr. K. Parameshwar,

learned Amicus Curiae, Ms. Aishwarya Bhati, learned

Additional Solicitor General appearing for the MoEF&CC,

Mr. Balbir Singh, learned Senior Counsel appearing for the

State of Haryana and Mr. K.M. Natraj, learned ASG appearing

for the State of Rajasthan.

27. The learned Amicus submitted that the Forest Survey

of India,7 vide its Status Report dated 19th August 2010

in pursuance to the order of this Court dated 19th February

2010 in the present proceedings, has defined the Aravalis as

under:

7
Hereinafter, “FSI”.

15

“(i) slope >3°, (ii) foothill buffer = 100m, (iii) inter hill
distance or valley width= 500m and (iv) the area
enclosed by above defined hills from all sides.”

28. The learned Amicus submitted that the FSI is an expert

body in the field and there should have been no reason for the

Committee to not accept the definition as proposed by the FSI

and substitute it with another definition.

29. The learned Amicus placed before this Court the report

of the Committee and how the Aravali Hills and Ranges have

been sought to be defined for the purposes of mining.

The same is as under:

“7. Recommendations and Way Forward
7.1 Definition of Aravali Hills and Ranges in the
context of mining
7.1.1 The committee recommends following
operational definition of Aravali Hills and Ranges in
the context of mining:
Aravali Hills: Any landform located in the Aravali
districts, having an elevation of 100 metres or more
from the local relief, shall be termed as Aravali Hills.
For this purpose, the local relief shall be determined
with reference to the lowest contour line encircling
the landform, as per Para-5.1.1 above. The entire
landform lying within the area enclosed by such
lowest contour, whether actual or extended
notionally, together with the Hill, its supporting
slopes and associated landforms irrespective of their
gradient, shall be deemed to constitute part of the
Aravali Hills.

Aravali Range: Two or more Aravali Hills, as defined
at Para- 5.1.2 above, located within the proximity of

16

500m from each other, measured from the outermost
point on the boundary of the lowest contour line on
either side forms Aravali Range. The area between the
two Aravali hills is determined by first creating
buffers with a width equal to the minimum distance
between the lowest contour lines of both hills. An
intersection line is then generated between the two
buffer polygons by joining the intersection of both
buffer polygons. Finally, two lines, are drawn
perpendicularly from both endpoints of the
intersection line and extended till it intersects the
lowest contour line of both hills. The entire area of
landforms falling between the lowest contour lines of
these Hills as explained, along with associated
features such as Hills, Hillocks, supporting slopes,
etc., shall also be included as part of Aravali Range.”

30. The learned Amicus submitted that if the definition as

recommended by the Committee is accepted, all the hills below

the height of 100 metres would be opened up for mining and

as a result the Aravali Hills and Ranges would lose their

continuity and integrity. He, therefore, submitted that if the

definition as suggested by the Committee is accepted, it would

totally endanger the environment and ecology of the

mountains.

31. As against this, Ms. Bhati, learned ASG submitted that

if the definition of Aravali Hills and Ranges as suggested by

the FSI is accepted, it would exclude large areas from the

Aravali Hills and Ranges. She, however, submitted that the

17

definition as suggested by the Committee is adopted, a larger

area would be included as part of the Aravali Hills and Ranges.

32. Ms. Bhati further submitted that the Committee itself

has recommended that except in case of critical, strategic and

atomic minerals, the mining activities would be prohibited in

the core/inviolate areas. She further submitted that the

Committee has made various recommendations in order to

prevent rampant mining and permit only sustainable mining.

33. No doubt that the Committee, with the assistance of

the technical committee, has done a commendable work.

However, recently we had an occasion to consider a matter

with regard to Saranda Wildlife Sanctuary as part of the

present proceedings. In the said matter, we had noticed that

the MoEF&CC had got a study done by an expert body namely

Indian Council of Forestry Research and Education8.

On the basis of the said study, the Management Plan for

Sustainable Mining9 in Saranda and Chaibasa, Singhbhum

District, Jharkhand was carried out. In the said matter, we

had noticed that ICFRE’s geo-referenced ecological

assessment enabled the identification of areas suitable for

8
Hereinafter, “ICFRE”.
9
Hereinafter, “MPSM”.

18

mining, areas requiring strict ecological protection and zones

where biodiversity values necessitated conservation priority.

34. Vide the judgment and order dated 13th November

2025 in the present proceedings to which two of us (Gavai, CJI

and K. Vinod Chandran, J.) were a party, this Court has

directed the Wildlife Sanctuary to be established insofar as the

compartments which were identified as conservation areas/no

mining zones. However, this Court explicitly excluded the

compartments wherein the MPSM found that sustainable

mining could be permitted.

35. It is not in dispute that the Aravali Hills and Ranges

also exhibit similar ecological fragility, and it is also an area

comprising of significant biodiversity. Not only that it acts as

a green barrier thereby preventing desertification in the Indo-

Gangetic plains, Haryana and western Uttar Pradesh.

36. No doubt that as stated by the learned ASG, the

MoEF&CC had decided to develop a green corridor/green wall.

However, the note submitted by the learned ASG would itself

reveal that the Aravali mountain range faces “escalating

degradation pressures”. The note further states that

deforestation, unsustainable grazing, illegal and excessive

19

mining, and urban encroachment have contributed to

widespread ecosystem damage. It further states that forest

cover has declined significantly in the last two decades, desert

sands are moving eastwards, and aquifers have been depleted

or damaged by mining activities. It further states that these

cumulative impacts undermine not only biodiversity but also

water security and climate resilience. It has further been

stated that all these affect the livelihoods of communities

dependent on the landscape’s resources.

37. Taking all these aspects into consideration, we are of

the considered view that while we propose to accept the report

of the Committee constituted by the MoEF&CC pursuant to

the orders passed by this Court, it would also be in the best

interest of the ecology and environment that a similar study

as was conducted for Saranda and Chaibasa, Singhbhum

District, Jharkhand by ICFRE is also conducted for Aravali

Hills and Ranges. No doubt that the Committee has taken care

by recommending prohibition of mining in core/inviolate areas

except in cases of critical, strategic and atomic minerals.

However, we find that it would be appropriate that such a

20

study be carried out taking into consideration the geological

importance of the Aravali mountain ranges.

38. It will be relevant to refer to paragraphs 7.3 and 7.4 of

the report of the Committee, which read thus:

“7.3 Regulation of Mining in Aravali Hills and
Ranges
7.3.1 The Committee recommends that to ensure
sustainable mining in the Aravalli Hills and ranges,
no new mining lease, except in case of critical,
strategic and atomic minerals (Atomic minerals
notified in part B and Critical and Strategic minerals
notified in Part D of the First Schedule of the MMDR
Act) and minerals listed in the Seventh Schedule of
the MMDR Act 1957 may be granted in Aravalli Hills
and Ranges as marked in the SOI Toposheets as per
the procedure described above
7.3.2 Regulation of operation of existing mines in
Aruvalli Hills and Ranges: The Committee
recommends that in case of ongoing mining leases
falling within in the area of Aravalli Hills and Ranges
as defined above, as well as for the renewal of such
mining leases, a team of experts comprising officers
of State Forest Department, Mining and Geology
Department, Local Administration and State
Pollution Control Board (SPCB) and such domain
experts as may be required, shall visit the concerned
mine to take stock of the compliance of EC/CTO
conditions and environmental safeguards followed by
the Mines for conservation of Aravalli Hills/Ranges
and prescribe necessary environmental safeguards
as deemed appropriate. The additional
environmental safeguard, as proposed by the
Committee, may be made a part of CTO conditions
and compliance thereof may be monitored by the
concerned SPCB.

21

7.4 Prohibition of Mining in Core/Inviolate Areas
7.4.1 Core/Inviolate areas may be designated in the
Aravalli Hills and Ranges for prohibiting mining in
them. For this purpose, following areas may be
designated as core/inviolate areas for the purpose of
mining:
i. Protected Areas, including tiger reserves
and all identified tiger corridors.
ii. Area covered under Draft or Final Eco
Sensitive Zone (ESZ)/Eco Sensitive Area
(ESA) notified under Section 3(2)(v) of the
Environment (Protection) Act, 1986, and
Section 5(1) of the Environment
(Protection) Rules, 1986
iii. For ESZs around Protected Areas, for
which proposals have been submitted by
the State Governments but are yet to be
notified as Draft/Final Notification by the
MoEFCC and for those, in which the
proposals are yet to be submitted by the
State Governments, the default ESZ shall
be regulated strictly as per the orders of
Hon’ble Supreme Court issued from time
to time in the matter of Writ Petition(s)
(Civil) No(s). 202/1995 Τ.Ν. Godavarman
Thirumulpad versus Union of India &
Ors.;
iv. No mining to be allowed within 1.0 km
of the boundary of Protected Area, even if
the boundary of ESZ is less than 1.0 km
from the boundary of the Protected Area.
v. Areas where plantations have been
raised with funds from CAMPA,
Government sources or under
international cooperation
vi. 500 m from the boundary of Ramsar
sites and Wetlands under Wetland
(Conservation & Management) Rules,
2017.”

22

39. We also appreciate the recommendations made by the

Committee for preventing illegal mining and permitting only

sustainable mining in the Aravali Hills and Ranges.

40. However, taking all aspects of the matter into

consideration, especially the fact that the Aravali Hills and

Ranges harbour rich biodiversity, with twenty-two wildlife

sanctuaries, four tiger reserves, the Keoladeo National Park,

along with wetlands like Sultanpur, Sambhar, Siliserh, and

Asola Bhati, and aquifers that recharge river systems

including the ones at Chambal, Sabarmati, Luni, Mahi, and

Banas, it is more than appropriate that before permitting

further sustainable mining activities, the same are preceded

by preparation of an MPSM.

41. In this regard, Ms. Bhati, learned ASG, expressed an

apprehension that insofar as Saranda was concerned, it dealt

with a much smaller area. She further submitted that carrying

out an MPSM for such a huge area covered by the Aravali Hills

and Ranges, would take a much longer time and would be a

herculean task.

42. We are of the considered view that it may not be in the

interest of ecology and environment if further mining activities

23

are permitted to be carried out without a body of experts, such

as ICFRE, examining the issue of protection of the

conservation areas. The MPSM will provide adequate data on

the basis of geo-referenced ecological assessment and identify

the areas which have wildlife and other high eco-sensitive

areas, which are required to be conserved. The MPSM will also

provide data as to how sustainable mining is to be conducted.

43. The MPSM, for Saranda, had put up a specific question

as to whether diversion of one of the best natural virgin forest

areas in the country for a lease of 12 to 13 years for mining

activities, is really worthy and justified? It is not in dispute

that the Aravali Hills and Ranges are one of the oldest

geological features of planet Earth. The MPSM for Saranda has

emphasized the need for identification of critical wildlife

habitats, corridors linking critical wildlife habitats, rich forests

and such other important forest areas in Saranda Forest

which need to be protected and conserved for posterity and are

considered as ecologically important and may be considered

as inviolate for iron ore mining. Such areas have been notified

as Conservation Reserve/Corridors or Ecologically Sensitive

24

Areas in accordance with the provisions of the Wild Life

(Protection) Act, 1972 and the Environment (Protection) 1986.

44. We are, therefore, of the considered opinion that if such

an MPSM is carried out for the Aravali Hills and Ranges, it can

also identify the areas where sustainable mining activities

could be permitted.

45. We therefore find that it will be appropriate to prepare

a Management Plan, in the nature of MPSM for Sarandha, for

the Aravali Hills and Ranges.

46. The MoEF&CC, if necessary, can also consider

preparing MPSM for each of the districts in the Aravali Hills

and Ranges. However, while doing that, it should be ensured

that the continuity and integrity of the Aravali Hills and

Ranges is maintained.

47. Further, insofar as a ban on mining is concerned,

we do not propose to impose any such ban on the present legal

mining activities that are already being undertaken in the

Aravali Hills and Ranges.

48. This Court had on an earlier occasion noticed the ill

consequences of imposing a complete ban on mining activities

in the case of State of Bihar and Others v. Pawan Kumar

25

and Others,10 to which one of us (Gavai, J., as he then was)

was a party. A complete ban on mining could, as was seen in

the said case, lead to illegal mining activities being carried out,

creation of land/mining mafias and criminalisation.

49. We, however, clarify that mining activities already

being undertaken in the Aravali Hills and Ranges would be

carried out strictly in accordance with paragraph 8 of the

recommendations of the Committee’s Report.

50. In the result, we pass the following order:

(i) We accept the recommendations made by the Committee

with regard to the definition of Aravali Hills and Ranges

given by MoEF&CC;

(ii) We further accept the recommendations with regard to

the prohibition of mining in core/inviolate areas with

exception as carved out in paragraph 7.3.1 of the

Committee’s Report;

(iii) We also accept the recommendations for sustainable

mining in Aravali Hills and Ranges and the steps to be

taken for preventing illegal mining in Aravali Hills and

Ranges;

10 (2022) 2 SCC 348

26

(iv) We, however, direct the MoEF&CC to prepare a MPSM

through ICFRE for the entire Aravalis, i.e., understood as

the continuous geological ridge extending from Gujarat

to Delhi on the lines of the MPSM for Saranda and the

MPSM must:

a. Identify permissible areas for mining, ecologically

sensitive, conservation-critical and restoration-

priority areas within the Aravali landscape where

mining shall be strictly prohibited or permitted only

under exceptional and scientifically justified

circumstances;

b. Incorporate a thorough analysis of cumulative

environmental impacts and the ecological carrying

capacity of the region; and

c. Include detailed post-mining restoration and

rehabilitation measures.

(v) We further direct that till the MPSM is finalised by the

MoEF&CC through ICFRE, no new mining leases should

be granted;

(vi) We further direct that upon the MPSM being finalised by

MoEF&CC in consultation with the ICFRE, mining would

27

be permitted as per the MPSM only in those areas

wherein sustainable mining could be permitted; and

(vii) In the meantime, the mining activities in the mines which

are already in operation would be continued in strict

compliance with the recommendations made by the

Committee in paragraph 8 of its Report.

51. Since one of us (B.R. Gavai, CJI) is sitting in the

proceedings in W.P.(C) No.202/1995 for the last time, we feel

that it is our duty to place on record our deep appreciation for

Mr. K. Parameshwar, learned Amicus Curiae, who, for the last

three years has laboriously assisted this Court in passing

various judgments and orders for the protection and

conservation of environment, wildlife and ecology. We must

also place on record our deep appreciation for

Mr. M.V. Mukunda, Ms. Kanti, Ms. Raji Gururaj and

Mr. Shreenivas Patil, learned counsel, whose contribution in

assisting Mr. K. Parameshwar, learned Amicus Curiae is very

valuable. We must also place on record our appreciation for

Ms. Aishwarya Bhati, learned Additional Solicitor General of

India, who has been representing the MoEF&CC in this matter

for a pro-active role and assisting this Court to find out the

28

solutions for protection and conservation of environment,

wildlife and ecology. We also place on record our appreciation

for Mr. Balbir Singh, learned Senior Counsel appearing for the

State of Haryana and Mr. K.M. Nataraj, learned Additional

Solicitor General of India appearing for the State of Rajasthan

in the present matter.

…………………………..CJI
(B.R. GAVAI)

……………………………..J
(K. VINOD CHANDRAN)

……………………………..J
(N.V. ANJARIA)
NEW DELHI;
NOVEMBER 20, 2025.

29

==================== NEXT DOCUMENT (same Neutral Citation) ====================

2025 INSC 1325 REPORTABLE

IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION

IN RE : CORBETT
I.A. NO. 20650 of 2023
(CEC REPORT No. 3 of 2023)
WITH
I.A. NO. 75033 OF 2023
AND
I.A. No. 199355 of 2024
(CEC Report No. 16 of 2024)
IN
WRIT PETITION (C) NO. 202 OF 1995

T. N. GODAVARMAN THIRUMULPAD … PETITIONER

VERSUS

UNION OF INDIA & OTHERS … RESPONDENTS

IN THE MATTER OF:
GAURAV KUMAR BANSAL … APPLICANT

Signature Not Verified

Digitally signed by
POOJA SHARMA
Date: 2025.11.17
17:42:19 IST
Reason:

Page 1 of 80
Writ Petition (C) No. 202 of 1995

INDEX

I. BACKGROUND……………………………………………………3
(A) The importance of tigers and their conservation in
India……………………………………………………………………….5
(B) Tiger safaris and their regulatory scheme …………………… 9
(C) Corbett Tiger Reserve …………………………………………….. 13
(D) Directions issued by this court in its judgment and order
dated 6th March 2024 …………………………………………………….. 14
II. RELEVANT STATUTORY PROVISIONS …………………..22
III. THE EXPERT COMMITTEE REPORT ……………………..25
(A) Recommendations with respect to Corbett Tiger
Reserve …………………………………………………………………27
(B) General Recommendations ……………………………………… 29
IV. DISCUSSION AND ANALYSIS ………………………………48
V. CONCLUSION …………………………………………………..52

ABBREVIATIONS
CEC Central Empowered Committee
CSS-IDWH Central Scheme for Integrated Development of
Wildlife Habitats
CZA Central Zoo Authority
ESZ Eco-Sensitive Zone
MoEF&CC Ministry of Environment, Forest and Climate
Change
NTCA National Tiger Conservation Authority
TCL Tiger conservation landscapes
TCP Tiger Conservation Plan
WLP Act Wildlife (Protection) Act, 1972

Page 2 of 80
Writ Petition (C) No. 202 of 1995

JUDGMENT
B.R. GAVAI, CJI

I. BACKGROUND

1. This Court, in its judgment and order dated 6th March

20241 passed in the present proceedings [to which one of us,

Gavai, J. (as he then was) was a member], considered the

statutory and regulatory framework for the establishment of

Tiger Safaris in Tiger Reserves, and issued various detailed

directions pertaining to the establishment of a Tiger Safari at

Pakhrau as well as with regard to illegal construction and felling

of trees in the Corbett Tiger Reserve. In the said judgment and

order, the existing Tiger Safaris and those under construction

(including the one at Pakhrau) were not outrightly prohibited but

were made subject to stricter standards. Therefore, in order to

develop these standards in a scientific and rational manner, this

Court directed constitution of an Expert Committee that would

carry out an in-depth inquiry, and make recommendations

based on various aspects as laid down in the said judgment and

order dated 6th March 2024, specifically including – restoration,

1 (2025) 2 SCC 641, hereinafter referred to as “T.N. Godavarman”

Page 3 of 80
Writ Petition (C) No. 202 of 1995

governance, and operational protocols for Tiger Safaris, as well

as guidelines for mitigation of ecological damage. The Expert

Committee was also specifically tasked with identifying the

officials who were personally liable for the damage caused to the

Corbett Tiger Reserve.

2. Pursuant to the aforesaid directions, the Expert Committee

was constituted by the MoEF&CC vide an Office Memorandum

dated 15th March 2024. The Expert Committee has submitted its

report and the copies of the said report were supplied to the

parties.

3. We have heard Mr. K. Parameshwar, learned Amicus

Curiae, Ms. Aishwarya Bhati, learned Additional Solicitor

General and Mr. Gaurav Kumar Bansal, applicant in person with

regard to their contentions concerning the said report. After

considering their contentions, by way of the present Judgment,

we propose to issue directions in continuation of those issued by

this Court vide judgment and order dated 6th March 2024 passed

in the present proceedings.

4. However, before we proceed further, it would be appropriate

to recapitulate the relevant background vis-à-vis the tiger

Page 4 of 80
Writ Petition (C) No. 202 of 1995

population in India, the Government’s conservational efforts, the

significance of Corbett National Park, and the directions issued

by this Court on 6th March 2024.

(a) The importance of tigers and their conservation
in India
5. The tiger, as the apex predator of its ecosystem in India,

plays a central role in maintaining the overall ecological balance,

and regulating natural processes in the forest.2 Its survival

ensures the health of forest ecosystems, biodiversity, water

security, and overall climate stability.3 Presently, however, tiger

populations survive within less than 7% of their historical range,

restricted to fragmented habitats spread across 12 recognized

Tiger Conservation Landscapes (hereinafter referred to as “TCLs”)

in Asia.4 Of these, 6 priority TCLs for long-term conservation are

located in the Indian subcontinent. India assumes a special

responsibility, as it is home to more than 80% of the world’s

free-ranging tiger population, representing over 60% of the

2 J. Terborgh, “Diversity and the Topical Rain Forest” (1991, Freeman New

York, xii + 242 pp.).
3 M. Sunquist, K.U. Karanth and F. Sunquist, “Ecology, behavior and

resilience of the tiger and its conservation needs” (1999, Pages 5-18).
4 J. Goodrich, A. Lynam, D. Miquelle, H. Wibisono, K. Kawanishi, A.

Pattanavibool, S. Htun, T. Tempa, J. Karki, Y. Jhala and U. Karanth,
“Panthera tigris. The IUCN Red List of Threatened Species” (2015).

Page 5 of 80
Writ Petition (C) No. 202 of 1995

species’ genetic diversity.5 The country’s contribution in terms of

conservation efforts, is therefore, pivotal to the objectives of the

Global Tiger Recovery Plan, which was adopted by the world

leaders at St. Petersburg in 2010.6

6. In India, tigers inhabit a wide variety of habitats ranging

from the high mountains, mangrove swamps, tall grasslands, to

dry and moist deciduous forests, as well as evergreen and shola

forest systems. By virtue of this, the tiger also acts as an

umbrella species for a majority of eco-regions in the Indian

subcontinent.7 Tigers, however, also require large undisturbed

forested landscapes with ample prey to raise young cubs and

maintain long-term genetic and demographic viability.8 With

India’s burgeoning population, and the corresponding

ever-expanding demand for land, conserving this species

requires innovative approaches to land-use planning that can

5 E. Dinerstein, C. Loucks, E. Wikramanayake, J. Ginsberg, E. Sanderson,

J. Seidensticker, J. Forrest, G. Bryja, A. Heydlauff, S. Klenzendorf, P.
Leimgruber, J. Mills, T.G. O’Brien, M. Shrestha, R. Simons and M. Songer,
“The fate of wild tigers” (2007).
6 S. Mondol, K.U. Karanth and U. Ramakrishnan, “Why the Indian
subcontinent holds the key to global tiger recovery” (2009).
7 J. Seidensticker, C. McDougal, N. Dunstone and M.L. Gorman, “Tiger

predatory behaviour, ecology and conservation” (1993, Pages 105-125).
8 K.U. Karanth and M.E. Sunquist, “Prey selection by tiger, leopard and

dhole in tropical forests”, 64(4) Journal of Animal Ecology 439, 445 (1995).

Page 6 of 80
Writ Petition (C) No. 202 of 1995

maintain connectivity between tiger source populations in a

‘metapopulation’ framework.9

7. In 1973, the Government of India launched its pioneering

initiative – “Project Tiger”, to optimise efforts towards conserving

the country’s national animal. The Project aimed to leverage the

functional role of the tiger in its habitat, and its unique

charisma, to garner resources and public support for conserving

‘representative ecosystems’. From 9 tiger reserves (spanning

18,278 km) in its initial years, the expanse of Project Tiger has

increased to 51 reserves (covering 72,749 km, at present), in over

18 states. Cumulatively, this accounts for roughly 2.23% of the

geographical area of our country.10 Pertinently, these tiger

reserves are constituted on a ‘core/buffer’ strategy. The core area

has the legal status of a national park or a sanctuary, whereas

the buffer or peripheral areas are a mix of forest and non-forest

land, managed as a hybrid multiple-use area. The Project Tiger

aims to foster an exclusive tiger agenda in the core areas, with

9 Y.V. Jhala, Q. Quereshi and A.K. Nayak, “Status of Tigers, copredators

and prey in India, 2018. National Tiger Conservation Authority,
Government of India, New Delhi and Wildlife Institute of India, Dehradun
(eds. 2020, p. 6 – ISBN No. 81-85496-50-1).
10 National Tiger Conservation Authority of India,
https://ntca.gov.in/about-us/#project-tiger.

Page 7 of 80
Writ Petition (C) No. 202 of 1995

an inclusive people-oriented agenda in the buffer zones of the

reserve. The Project also paves way specifically for conservation

of tiger population in designated tiger reserves. Despite this aim,

many Tiger Reserves and Protected Areas in India are analogous

to small islands in a vast sea of ecologically unsustainable land

of varying degrees.11 Many tiger populations are confined within

small ‘Protected Areas’, with some having habitat corridors that

permit tiger movement between them.12 However, most corridor

habitats in India are not Protected Areas, and hence, are

degrading due to unsustainable human use and developmental

projects in those region.

8. The National Tiger Conservation Authority (hereinafter

referred to as “NTCA”), constituted under Section 38-L of the

Wild Life (Protection) Act, 1972 (hereinafter referred to as “WLP

Act”), also functions in a similar domain, focussing on tiger

conservation work in India. The scope of NTCA’s work ranges

from on-ground protection initiatives, science-based monitoring

of tigers and their habitat using latest technological tools,

11 Y.V. Jhala, Q. Quereshi and A.K. Nayak, “Status of Tigers, copredators

and prey in India, 2018. National Tiger Conservation Authority,
Government of India, New Delhi and Wildlife Institute of India, Dehradun
(eds. 2020, p. 6 – ISBN No. 81-85496-50-1).
12 Ibid.

Page 8 of 80
Writ Petition (C) No. 202 of 1995

independent assessment of tiger reserves with Management

Effectiveness Evaluation framework, financial and technical

support to tiger reserves, creating inviolate spaces for wildlife

while ensuring community development, to fostering

international co-operation.13 The objectives of the NTCA include:

(i) providing statutory authority to Project Tiger so that

compliance of its directives become legal; (ii) fostering

accountability of both the Centre and the States, in management

of Tiger Reserves, by providing a basis for MoU with States within

India’s federal structure; (iii) providing an oversight mechanism

by Parliament; and (iv) addressing livelihood interests of local

people in areas surrounding Tiger Reserves.14

(b) Tiger Safaris and their regulatory scheme
9. The concept of a ‘Tiger Safari’ in the wild, was introduced

for the first time by the Central Government in its Tourism

Guidelines, 2012. This provided for the creation of Tiger Safaris

in the buffer area of tiger reserves, which experience large

tourism footfall. The Guidelines also prescribed the

13 National Tiger Conservation Authority of India,
https://ntca.gov.in/about-us/#our-work.
14 National Tiger Conservation Authority of India,
https://ntca.gov.in/about-us/#ntca.

Page 9 of 80
Writ Petition (C) No. 202 of 1995

establishment of interpretation and awareness centres in these

buffer areas, to foster awareness on conservation efforts and the

ecological balance they seek to protect, to in turn, garner public

support. The local Panchayati Raj institutions were tasked with

running these newly established centres. The establishment of

such ‘safaris’ in the buffer zone demonstrably generates

employment for the local people and promotes co-existence

between wildlife and humans.

10. Until 2016, the regulatory regime only recognized safaris as

being an ex-situ mode of conservation. With the 2016 Guidelines,

the focus shifted to in-situ conservation. These guidelines

prescribed the basic criteria and procedure to be followed in the

buffer and fringe areas of tiger reserves for dealing with the

establishment, management and administration of Tiger Safaris.

Clause 8 provides that, tourism activities in the tiger reserves

are regulated by the normative guidelines on tourism issued by

the NTCA as well as by the prescriptions on eco-tourism as

contained in the Tiger Conservation Plan (hereinafter referred to

as “TCP”) of the tiger reserves.

11. Clause 10 of the 2016 Guidelines provides that the location

of the tiger safari shall be identified preferably in the buffer (not

Page 10 of 80
Writ Petition (C) No. 202 of 1995

falling in notified National Parks and/or Wildlife Sanctuary) or

peripheral area of the tiger reserve, based on the

recommendations of a committee comprising of members from

the NTCA, Central Zoo Authority (hereinafter referred to as

“CZA”), Forest Department of the concerned State, an

experienced tiger biologist/scientist/conservationist and a

representative nominated by the Chief Wildlife Warden of the

concerned State. It also provides that tiger dispersal routes shall

be avoided in all circumstances. Mandating that the area of a

Safari Park should be as large as possible, it also prescribes that

the minimum area of a tiger safari should be 40 hectares,

extendable as per requirements. It describes that the topography

for the safari should be undulating and well-draining, without

steep slopes; and that the vegetation maintained in the Park

should be indigenous, the density of flora regulated according to

needs and with the objective of providing a naturalistic effect. It

should also provide shelters and withdrawal areas for animals.

It further prescribes that the entire safari area should be

surrounded by a suitable peripheral chain link fence. The said

chain link fence should be of a minimum height of 5 meters with

a suitable both way overhang at the top or as prescribed by the

Page 11 of 80
Writ Petition (C) No. 202 of 1995

CZA from time to time. It also provides that a buffer zone (strip)

of about 5 meters width be provided around the fenced area and

requires the creation of a watch tower of about 5 meters in

height. It also provides for the sensitization of visitors at

designated ‘Visitor Centres’.

12. The NTCA issued fresh guidelines in November 2019. These

2019 Guidelines are similar to the 2016 Guidelines – with the

exception of Clause 9 of the former, which provides that the

selection of the animal shall be done in conformity with Section

38-I of the WLP Act after due approval of the CZA. Clause 9 was

disapproved by this Court in T.N. Godavarman (supra). It was

held that the 2019 Guidelines, which permitted the sourcing of

animals from zoos was totally contrary to the purpose of tiger

conservation, and to that extent the offending provisions in the

2019 Guidelines were quashed. It was further clarified that since

the establishment of Tiger Safaris would virtually be for ‘in-situ’

conservation and protection of the species, it is the NTCA that

shall have the final authority.

Page 12 of 80
Writ Petition (C) No. 202 of 1995

(c) Corbett Tiger Reserve
13. The Corbett National Park is one of India’s oldest parks

(declared under the United Provinces National Park Act, 1935)

and a significant site for tiger conservation given that it houses

the source population of tigers in the Shivalik-Gangetic

landscape. After the launch of Project Tiger (and consequent

amendments to the WLP Act), it was notified as a Tiger Reserve

encompassing 1,288.31 sq. km in 2010, by the State of

Uttarakhand. Out of this total area, 821.99 sq. km. constitutes

the core critical tiger habitat, which includes 520.82 sq. km. of

the Corbett National Park and 301.17 sq. km. of the Sonanadi

Sanctuary. The remaining area of 466.32 sq. km. forms the

buffer zone, with 306.90 sq. km. in Kalagarh and 159.4 sq. km.

in the Ramnagar forest divisions. The forest within this Reserve

serves as a vital corridor connecting the reserve with the Rajaji

National Park. It maintains a high density of tigers due to its

abundant prey base and functions as a key contributor to tiger

conservation, facilitating dispersal into neighbouring protected

areas such as Lansdowne, Terai West, Amangarh, and

Ramnagar forest divisions. It is recognized that Corbett hosts the

largest tiger population within any single protected area globally.

Page 13 of 80
Writ Petition (C) No. 202 of 1995

Therefore, its position in the Terai Landscape ensures long-term

continuity of tigers, provided there are serious efforts by the

respective Governments to safeguard the connectivity between

different units. It is also an extremely rich habitat for an array of

bird species, with almost 50% of the bird species of the

subcontinent being found in the reserve, of which several are

included in the lists of threatened and endangered species.15

(d) Directions issued by this Court in judgment and
order dated 6th March 2024 in the present
proceedings
14. These proceedings may be understood as a continuation of

this Court’s findings and consideration, in T.N.Godavarman

(supra) which arose from an application filed by one Shri Gaurav

Kumar Bansal. After considering various reports and CEC

Reports (including the CEC Report No. 30/2022), this Court

passed the following directions on 6th March 2024:

“178.1. The Safaris which are already
existing and the one under construction at
Pakhrau will not be disturbed. However,
insofar as the Safari at ‘Pakhrau’ is
concerned, we direct the State of
Uttarakhand to relocate or establish a

15 V.B. Mathur, A.K. Nayak and N.A. Ansari, “Fourth Cycle of Management

Effectiveness Evaluation (MEE) of Tiger Reserves in India, 2018”. National
Tiger Conservation Authority and Wildlife Institute of India, Minsitry of
Environment, Forest and Climate Change, Government of India, p. 100.

Page 14 of 80
Writ Petition (C) No. 202 of 1995

rescue centre in the vicinity of the ‘Tiger
Safari’. The directions which would be
issued by this Court with regard to
establishment and maintenance of the
‘Tiger Safaris’ upon receipt of the
recommendations of the Committee which
we are directing to be appointed would
also be applicable to the existing Safaris
including the Safari to be established at
Pakhrau.
178.2. The MoEF&CC shall appoint a
Committee consisting of the following:
(i) a representative of the NTCA;
(ii) a representative of the Wildlife Institute
of India (WII);
(iii) a representative of the CEC; and
(iv) an officer of the MoEF&CC not below
the rank of Joint Secretary as its Member
Secretary.
We however clarify that the Committee
would be entitled to co-opt any other
authority including a representative of
CZA and also take the services of the
experts in the field, if found necessary.
178.3. The said Committee will:
178.3.1. recommend the measures for
restoration of the damages, in the local in
situ environment to its original state
before the damage was caused;
178.3.2. assess the environmental
damage caused in the Corbett Tiger
Reserve (CTR) and quantify the costs for
restoration;
178.3.3. identify the persons/officials
responsible for such a damage. Needless
to state that the State shall recover the
cost so quantified from the
persons/delinquent officers found

Page 15 of 80
Writ Petition (C) No. 202 of 1995

responsible for the same. The cost so
recovered shall be exclusively used for the
purpose of restoration of the damage
caused to the environment.
178.3.4. specify how the funds so collected
be utilized for active restoration of
ecological damage.
178.4. The aforesaid Committee, inter
alia, shall consider and recommend:
178.4.1. The question as to whether Tiger
Safaris shall be permitted in the buffer
area or fringe area.
178.4.2. If such Safaris can be permitted,
then what should be the guidelines for
establishing such Safaris?
178.4.3. While considering the aforesaid
aspect, the Committee shall take into
consideration the following factors:
a) the approach must be of ecocentrism
and not of anthropocentrism;
b) the precautionary principle must be
applied to ensure that the least amount of
environmental damage is caused;
c) the animals sourced shall not be from
outside the Tiger Reserve. Only injured,
conflicted, or orphaned tigers may be
exhibited as per the 2016 Guidelines. To
that extent the contrary provisions in the
2019 Guidelines stand quashed.
d) That such Safaris should be proximate
to the Rescue Centres.
Needles to state that the aforesaid factors
are only some of the factors to be taken
into consideration and the Committee
would always be at liberty to take such
other factors into consideration as it
deems fit.

Page 16 of 80
Writ Petition (C) No. 202 of 1995

178.4.4. The type of activities that should
be permitted and prohibited in the buffer
zone and fringe areas of the Tiger Reserve.
While doing so, if tourism is to be
promoted, it has to be eco-tourism. The
type of construction that should be
permissible in such resorts would be in
tune with the natural environment.
178.4.5. The number and type of resorts
that should be permitted within the close
proximity of the protected areas. What
restriction to be imposed on such resorts
so that they are managed in tune with the
object of protecting and maintaining the
ecosystem rather than causing
obstruction in the same.
178.4.6. As to within how much areas
from the boundary of the protected forest
there should be restriction on noise level
and what should be those permissible
noise levels.
178.4.7. The measures that are required
to be taken for effective management and
protection of Tiger Reserves which shall be
applicable on a Pan India basis.
178.4.8. The steps to be taken for
scrupulously implementing such
recommendations.
178.5. The CBI is directed to effectively
investigate the matter as directed by the
High Court of Uttarakhand at Nainital in
its judgment and order dated 6th
September 2023, passed in Writ Petition
No.178 of 2021.
178.6. The present proceedings shall be
kept pending so that this Court can
monitor the steps taken by the Authorities
as well as the investigation conducted by
the CBI.

Page 17 of 80
Writ Petition (C) No. 202 of 1995

178.7. We will consider issuing
appropriate directions after the
recommendations are received by this
Court from the aforesaid Committee. We
request the Committee to give its
preliminary report within a period of three
months from today.
178.8. The CBI shall submit a report to
this Court within a period of three months
from today. We request the learned ASG to
communicate this order to the Director,
CBI.
178.9. The State of Uttarakhand is
directed to complete the disciplinary
proceedings against the delinquent
officers as expeditiously as possible and in
any case, within a period of six months
from today. The status report in this
regard shall be submitted to this Court
within a period of three months from
today.”

15. Thus, pursuant to the aforesaid judgement and order dated

6th March 2024, three independent proceedings came to be

initiated viz., (a) CBI investigation; (b) disciplinary proceedings

against delinquent officers in Corbett; and (c) the Expert

Committee which was to consider various aspects detailed in

paragraphs 178.3 and 178.4 of the judgment. As mentioned

hereinabove, the present proceedings are a culmination of these

directions – specifically to consider the recommendations

Page 18 of 80
Writ Petition (C) No. 202 of 1995

received from the Expert Committee, and to accordingly pass

further directions.

16. For the sake of completeness, before delving into these

recommendations, it would be relevant to refer to a short

summary of the CBI investigation carried out, so also the

disciplinary proceedings conducted against delinquent officers

in Corbett.

17. As per the judgement and order dated 6th March 2024 in

the present proceedings, the CBI submitted its status report and

the same was taken on record vide order dated 23rd July 2024.

Further, this Court granted 6 months’ time to complete the

investigation and with a view to ensure that the investigation

progresses without any delay directed the CBI to file a

subsequent status report after a period of 3 months.

Consequently, a second status report was taken on record vide

order dated 20th November 2024 and the CBI was again directed

to submit another status report after a period of 3 months. On

19th March 2025, the third status report was taken on record

and CBI was granted 3 months for filing its final report.

Page 19 of 80
Writ Petition (C) No. 202 of 1995

18. After the CBI submitted its final report, this Court passed

the following order on 29th May 2025 thereby disposing of the

applications insofar as directions issued to the CBI were

concerned:

“1. This Court, vide judgment dated
06.03.2024 passed in I.A. No. 20650 of
2023 in the present proceedings 1, had
directed the Central Bureau of
Investigation (CBI) to conduct an
investigation and submit a report to this
Court.
2. The CBI had from time to time
submitted its status report and this Court
was satisfied with the progress of the
investigation.
3. It is now informed that the field
investigation of case is complete and the
chargesheet/final report under Section
173(2) of the Criminal Procedure Code,
1973 for the commission of offences under
Sections 120-B, 218, 409, 467, 471 of
Indian Penal Code, 1860; Section 13(2)
read with 13(1)(a) of the Prevention and
Corruption Act, 1988; Section 26-1(f) & (h)
of the Indian Forest Act, 1927; Section
2(iv) (read with Section 3A & 3B) of the
Forest Conservation Act,1980 and
Sections 27(2)(a), 27(4) & 35(6) read with
Section 51 of the Wildlife (Protection) Act,
1972 has been filed against the following
accused public servants, namely;
(i) Shri Kishan Chand, the then Deputy
Conservator of Forest/Divisional Forest
Officer, Kalagarh Tiger Reserve
Division, Lansdowne.
(ii) Shri Brij Bihari Sharma, the then
Forest Range Officer, Sonanadi &

Page 20 of 80
Writ Petition (C) No. 202 of 1995

Pakhro Range, Kalagarh Tiger Reserve
Division, Lansdowne.
(iii) Shri Rahul, the then Director,
Corbett Tiger Reserve, Ramnagar,
Nainital.
(iv) Shri Akhilesh Tiwari, the then Dy
Conservator of Forest/Divisional Forest
Officer, Kalagarh Tiger Reserve
Division, Lansdowne.
(v) Shri Mathura Singh Mavdi, Deputy
Ranger, Pakhro Range, Kalagarh Tiger
Reserve Division, Lansdowne.
(vi) Shri Surendra Singh, the then
Forester/Van Daroga, Pakhro Range,
Kalagarh Tiger Reserve Division,
Lansdowne.
(vii) Shri Sandeep Arya, the then Forest
Guard, Sonanadi Range, Kalagarh Tiger
Reserve Division, Lansdowne.
(viii) Shri Rajesh Rawat, the then
Wireless Operator (Daily wages), Pakhro
Range, Kalagarh Tiger Reserve Division,
Lansdowne.
4. Since the CBI has brought the matter to
its logical end, these applications shall
stand disposed of insofar as the directions
issued to the CBI are concerned.”

19. Next, regarding disciplinary proceedings conducted against

delinquent officers in Corbett, the State of Uttarakhand filed a

Status report pointing out various actions taken against the

officers of the Forest Department. This Court granted 3 months’

time to file further Status report on the Disciplinary proceedings.

Further, on 19th March 2025, this Court expressed its

discontentment with the pace of the disciplinary proceedings

Page 21 of 80
Writ Petition (C) No. 202 of 1995

regarding the action taken against IFS officers whose dereliction

of duties resulted/contributed to the ecological damage in the

Corbett Tiger Reserve. Hence, by way of the said order, this Court

directed the State of Uttarakhand to conclude the departmental

proceedings with respect to all concerned officers within a period

of 3 months. The final report regarding the departmental

proceedings is yet to be submitted by the State of Uttarakhand.

II. RELEVANT STATUTORY PROVISIONS

20. Before we consider the recommendations made by the

Expert Committee, it will be relevant to refer to certain statutory

provisions of the WLP Act and the interpretation given to them

by this Court in T.N.Godavarman (supra).

21. A perusal of the sections in Chapter IV, IV-A and IV-B of

the WLP Act reveals that diverse measures have been provided

for the preservation of Protected Areas. The definition of

“protected area” as defined under sub-section (24-A) of Section

2 of the WLP Act only includes a National Park, a sanctuary, a

conservation reserve or a community reserve, which are notified

under Sections 18, 35, 36-A and 36-C of the WLP Act.

Page 22 of 80
Writ Petition (C) No. 202 of 1995

22. As per the Section 38-V of the WLP Act, a tiger reserve has

two parts namely Core and Buffer. The relevant portion of the

provision is extracted below:

“[…] Explanation – For the purposes of this
section, the expression “tiger reserve”
includes –
(i) core or critical tiger habitat areas of
National Parks and sanctuaries, where it
has been established, on the basis of
scientific and objective criteria, that such
areas are required to be kept as inviolate
for the purposes of tiger conservation,
without affecting the rights of the
Scheduled Tribes or such other forest
dwellers, and notified as such by the State
Government in consultation with an Expert
Committee constituted for the purpose;
(ii) buffer or peripheral area consisting of
the area peripheral to critical tiger habitat
or core area, identified and established in
accordance with the provision contained in
Explanation (i) above, where a lesser degree
of habitat protection is required to ensure
the integrity of the critical tiger habitat with
adequate dispersal for tiger species, and
which aim at promoting co-existence
between wildlife and human activity with
due recognition of the livelihood,
developmental, social and cultural rights of
the local people, wherein the limits of such
areas are determined on the basis of the
scientific and objective criteria in
consultation with the concerned Gram
Sabha and an Expert Committee
constituted for the purpose.”

Page 23 of 80
Writ Petition (C) No. 202 of 1995

23. In T.N. Godavarman (supra), this Court undertook a

detailed review of the statutory and regulatory scheme applicable

to Tiger Reserves and establishment of Tiger Safaris and

specifically held that:

“49. A perusal of the entire scheme of the
WLP Act read with the Statement of objects
and reasons would clearly reveal that the
entire emphasis is on “conservation,
protection and management of the
wildlife”. The WLP Act also provides for the
matters connected therewith or ancillary or
incidental thereto for the conservation,
protection and management of wildlife. It
also emphasizes on ensuring the ecological
and environmental security of the country.
50. …. the harmonious construction of
the various provisions of the WLP Act
would reveal that the legislature
intended the “Tiger Reserves” to be kept
at a higher pedestal than a sanctuary, a
National Park, a conservation reserve, or
a community reserve.
64. … The provisions contained in
Chapter IVA lay a specific emphasis on
the protection of tigers and other
habitats in the tiger reserve. The
provisions contained therein are in
addition to the provisions contained for
sanctuaries and National Parks”

(emphasis supplied)

24. Since this Court has already reviewed and considered the

vast statutory and regulatory landscape that exists relating to

Page 24 of 80
Writ Petition (C) No. 202 of 1995

Tiger Reserves in T.N.Godavarman (supra), reproduction or

repetition of the same would not be necessary.

III. THE EXPERT COMMITTEE REPORT

25. Pursuant to the directions contained in paragraph 178.2

of the judgement dated 6th March 2024, the MoEF&CC vide its

Office Memorandum dated 15th March 2024 constituted the

Committee with the following members:

(a) Shri Chandra Prakash Goyal, Member CEC as the

Nominee of Central Empowered Committee – Member;

(b) Dr. Vaibhav C Mathur, Deputy Inspector General of

Forests, National Tiger Conservation Authority –

Member;

(c) Professor Qamar Qureshi, then Scientist G, Wildlife

Institute of India, Dehradun – Member; and

(d) Shri R Raghu Prasad, Inspector General of Forests,

Wildlife – Member Secretary.

In addition, after the first meeting, the Committee co-opted the

following two officials:

Page 25 of 80
Writ Petition (C) No. 202 of 1995

(e) Dr. SP Yadav, former Member Secretary, National Tiger

Conservation Authority and Interim Director General,

International Big Cat Alliance; and

(f) Dr Sanjay Shukla, then Member Secretary, CZA.

26. It can be seen from the Report of the Expert Committee that

it held meetings on various dates i.e., on 28th March 2024,

30th April 2024, 20th May 2024, 12th June 2024, and

25th June 2024. It can also be seen that Committee went for a

field visit from 30th May 2024 to 1st June 2024 to inspect the

entire area affected by different activities undertaken by the

officials of Corbett Tiger Reserve in the name of establishment of

the Pakhrau Tiger Safari. After undertaking a detailed study of

numerous reports and documents, holding meetings, and

consulting experts as well as Field Directors of various Tiger

Reserves, the Committee has made (i) specific recommendations

with respect to Corbett Tiger Reserve and (ii) general

recommendations with respect to Tiger Reserves in India, which

are considered as under:

Page 26 of 80
Writ Petition (C) No. 202 of 1995

(a) Recommendations with respect to Corbett Tiger
Reserve

27. The Committee has made specific recommendations with

respect to Corbett Tiger Reserve, as per the terms of reference by

this Court contained in paragraph 178.3 of the judgment and

order dated 6th March 2024. These recommendations are as

follows:

27.1. Measures for restoration of the damages, in the

local in situ environment to its original state before the

damage was caused: Pursuant to the Committee consulting the

experts from the Indian Institute of Forest Management, Bhopal

(“IIFM”), it recommended the demolition of the above-ground

structures, excavation of hard pan material, safe disposal of

debris, filling up of excavated area with soil followed by site

preparation, plantation and maintenance. The Committee in its

report states that there is a requirement to install some pipes

inside few culverts on the service road for maintaining

hydrological flows. It is recommended that Hume pipes may be

fixed up in such areas and the total costs for in-situ ecological

restoration is estimated to be Rs. 4,30,89,110 (around Rs. 4.30

Cr).

Page 27 of 80
Writ Petition (C) No. 202 of 1995

27.2. To Assess the environmental damage caused in the

Corbett Tiger Reserve (CTR) and quantify the costs for

restoration: Based on deliberations with experts from IIFM

Bhopal, the Committee recommended that the assessment in

monetary terms, of the ecological damage for affected areas

should be confined to sites impacted by the various activities

undertaken by the forest officials for establishing a tiger safari

at Pakhrau. According to the report, the total area of ecosystem

damage is likely to be in 118.19 ha. As per the forest diversion

proposal for the safari project, though compensatory

afforestation has been proposed to address this damage, the

Committee has stated that this effort will evidently fall short in

fully capturing the benefits of the original ecosystem, but its

benefits will accrue gradually over time. The report further

states that the potential ecological loss from safari project

activities in affected areas is assessed in monetary terms as Rs.

22,95,06,306 (around Rs. 23 Cr) with conceivable net market

value of felled timber as Rs. 6.80 Cr. Therefore, according to the

Committee the total damage costs are estimated to be about

Rs. 29.8 Cr.

Page 28 of 80
Writ Petition (C) No. 202 of 1995

27.3. On identifying the persons/officials responsible

for such a damage, with the consequent direction that the

State will recover the costs so quantified from the

delinquent officer found responsible and use it exclusively

towards restoration of the damage caused by the

environment: As the CBI is effectively investigating the issue,

the Committee deemed it fit to not assess the same issue, to

avoid overlapping of responses.

27.4. On how the funds so collected be utilized for active

restoration of ecological damage: Upon assessment of the

environment damage and quantification of the costs towards

ecological restoration supported by 2 experts from IIFM Bhopal,

the Committee has stated that the amount so collected for

restorations has to be deposited in a separate account

maintained by the Field Director, Corbett Tiger Reserve and the

State shall file annual compliance report with the CEC along

with data which is to be uploaded on the relevant dashboard of

the CEC.

(b) General Recommendations
28. We will now consider the various general recommendations

made by the Expert Committee, in accordance with the scope set

Page 29 of 80
Writ Petition (C) No. 202 of 1995

out by this Court in paragraph 178.4 of its judgment dated 6th

March 2024.

29. On whether Tiger Safaris shall be permitted in the

buffer area or fringe area

29.1. The Committee in its Report has differentiated the

diversity of wildlife tourism experiences with encountering

animals in their natural habitats and animals in controlled

environments (i.e., zoos where human intervention maintains

the surroundings), each shaped by varying degrees of natural

authenticity and human influence. The Committee after

considering the Gazette notification dated 15th October 2012, the

minutes of ninth meeting of NTCA dated 19th June 2013,

Guidelines to Establish Tiger Safari in Buffer and Fringe Areas

of Tiger Reserves issued by NTCA in November 2019, and

provisions of Section 38-V of the WLP Act, has arrived at certain

conclusions. The Committee has traced the intention of the

Government of India and the NTCA, to establish Tiger Safari in

the buffer or fringe areas. While doing so, tiger dispersal routes

must be avoided in all circumstances, as stated in the

Guidelines. It is categorically stated that a forest area in the

buffer zone, would definitely be a part of such dispersal routes

Page 30 of 80
Writ Petition (C) No. 202 of 1995

of tigers and other wildlife. The Committee also found that the

density of tigers in forests under buffer area, is in fact quite high.

29.2. Based on these findings, the Expert Committee has

made certain recommendations: that as per the proviso to

Section 33(a), Explanation (ii) of Section 38-V(4) the WLP Act,

and the judgment and order dated 6th March 2024, Tiger Safaris

should be strictly prohibited in core or critical tiger habitat areas.

It further recommended that any Tiger Safari may only be set up

on non-forest land or degraded forest land within the buffer,

provided these locations do not form part of a tiger corridor. The

Committee also emphasized that the establishment of a Tiger

Safari shall be permitted solely in conjunction with a fully

operational rescue and rehabilitation centre for tigers,

specifically designed to care for conflict, injured, or abandoned

animals.

30. Guidelines for Tiger Safaris

30.1. Since the Expert Committee has recommended that

Tiger Safaris may continue, in the buffer and fringe areas, it has

also evolved guidelines accordingly.

30.2. In its Report, the Committee states that the

‘Guidelines to Establish Tiger Safari in Buffer and Fringe

Page 31 of 80
Writ Petition (C) No. 202 of 1995

Areas of Tiger Reserves 2019’ issued by the NTCA should form

the basis for any establishment of Tiger Safaris. The directions

of this Court in T.N.Godavarman (supra) with regard to

sourcing of animals should be strictly adhered to. Specifically,

the Committee recommended that only animals rescued from the

Tiger Reserve or the same landscape, particularly conflict

animals, should be housed in the Safaris. The committee has

advised that a rescue centre, integrated with each Tiger Safari,

should provide essential veterinary support and facilitate the

treatment and care of such animals. The management of each

Safari is to remain under the control of the Field Director of the

concerned reserve with supervision from the Chief Wildlife

Warden. Financial earnings from the Safari should be directed

back into the Tiger Conservation Foundations. The Committee

further stressed the importance of design measures to prevent

any contact between wild and captive populations, mandated

approval for enclosure designs by the CZA and called for the

development of carrying capacity norms. Environmentally

friendly vehicle options like solar, hybrid, or electric vehicles are

to be promoted and their numbers regulated, and a strict policy

Page 32 of 80
Writ Petition (C) No. 202 of 1995

of zero discharge of waste water from the Safari must be

enforced.

31. Permissible and prohibited activities in the buffer and

fringe areas of the Tiger Reserve

31.1. The Committee outlined a detailed set of prohibited

and regulated activities for buffer and fringe zones of Tiger

Reserves. Prohibited activities include commercial mining,

establishing sawmills, polluting industries, commercial firewood

use for businesses, major hydroelectric projects, introduction of

exotic species, use or production of hazardous substances, low-

flying tourism aircraft (including drones, which must fly at least

300 meters above obstacles), discharge of waste into natural

habitats and unauthorized felling of trees. On the other hand, it

specified that regulated activities could include the

establishment of hotels and resorts as per approved tourism

plans that accommodate wildlife movement, commercial use and

harvesting of natural water resources by master plan, fencing

premises of hotels and lodges, widening roads, permitting

vehicular movement at night and protective measures for hill

slopes and river banks in keeping with plans.

Page 33 of 80
Writ Petition (C) No. 202 of 1995

31.2. Additionally, the Committee recommended that the

TCP should clearly define zones within the buffer area where new

tourism infrastructure may be developed, considering factors

like road access, village proximity and animal corridors. It has

suggested that all new tourism infrastructure must comply with

Eco-sensitive Zone notifications under the Environment

(Protection) Act, 1986. It further recommended that eco-friendly

tourism facilities could be allowed on non-forest land within

buffer zones and such zones must be clearly delineated as part

of the TCP and the zonal Master Plan for Eco-sensitive Zones

(hereinafter referred to as “ESZ”).

32. Whether resorts can be permitted within the close

proximity of protected areas and restrictions thereof

32.1. The Committee expressed concern that ecotourism in

many tiger reserves continues to resemble mass tourism and

lacks adequate regulation, despite the Supreme Court’s directive

in Ajay Dubey v. National Tiger Conservation Authority16

that tourism activities in core and critical tiger reserve areas

must adhere strictly to NTCA Guidelines.

16 (2019) 11 SCC 538

Page 34 of 80
Writ Petition (C) No. 202 of 1995

32.2. Accordingly, the Committee recommended that new

eco-friendly resorts may be permitted within buffer zones but

must be strictly prohibited in identified tiger corridors. It further

encouraged the promotion of homestays and community-

managed establishments, coupled with incentives to support

such initiatives. To mitigate environmental impact, zero waste

practices were mandated as compulsory. The Committee also

advocated for the entire Tiger Reserve and its corresponding ESZ

to be designated as “Silence Zones” under the Noise Pollution

(Regulation and Control) Rules, 2000 and prohibited the use of

mobile phones within tourism zones of core habitats to minimize

disturbance to wildlife. Strict enforcement of vehicular carrying

capacity limits as prescribed by NTCA was emphasized,

alongside a complete phase-out of night stay facilities for tourists

in core areas and an outright ban on night tourism. Additionally,

for reserves where roads cut through core or critical tiger

habitats, stringent night-time traffic restrictions were

recommended, permitting only emergency and ambulance

vehicles to operate from dusk to dawn.

Page 35 of 80
Writ Petition (C) No. 202 of 1995

33. Permissible noise levels and the distance from the

boundary of the protected forest for which restrictions on

noise level will be applicable

33.1. The Committee reiterated its recommendation that

the entire Tiger Reserve, along with the ESZ of the protected

areas included within it, should be notified as a ‘Silence Zone’

under the Noise Pollution (Regulation and Control) Rules, 2000.

In situations where the ESZ of the Tiger Reserve has not yet been

officially notified, the proposed ESZ should be considered for this

designation. Furthermore, if neither a notified nor a proposed

ESZ exists, a default ESZ should be applied to ensure

appropriate restrictions on noise levels around the protected

forest boundaries.

34. Measures for effective management of Tiger Reserves,

on a pan-India basis

34.1. Strict Regulatory Regime: The Committee

recommended that States should be directed to prepare TCPs

within the six months. It has suggested that financial assistance

under the Project Tiger component of the Central Scheme for

Integrated Development of Wildlife Habitats (hereinafter referred

to as “CSS-IDWH”) should be mandatorily linked to an approved

Page 36 of 80
Writ Petition (C) No. 202 of 1995

TCP to ensure effective resource utilization. Forest areas situated

in buffer and corridor regions identified within the TCP should

be managed in alignment with the plan to maintain consistency

between forestry operations and wildlife conservation priorities.

Forestry operations in buffer forest lands ought to be integrated

into the TCP through consultations with the State Forest

Department’s working plans. The Committee highlighted that

Critical Tiger Habitats notified under the WLP Act, should be

accorded equivalence with Critical Wildlife Habitats as defined

by the Forest Rights Act, recognizing both scientific and

ecological significance alongside traditional forest dwellers’

rights. It recommended that tiger carrying capacity be calculated

as per existing norms within the TCP to guide habitat

interventions effectively. Furthermore, while Compensatory

Afforestation Fund Management and Planning Authority

(hereinafter referred to as “CAMPA”) funds may continue to

support voluntary village relocation, it was suggested that

dedicated funding should be earmarked specifically to uphold

inviolate core and critical tiger habitats, extending financial

assistance also to villages in buffer zones and tiger dispersal

routes.

Page 37 of 80
Writ Petition (C) No. 202 of 1995

34.2. Proper Human Resource Management: The

Committee advised that States should prioritize filling vacancies

at all levels within tiger reserves, identifying this as a critical

factor limiting protection and scientific efforts. It proposed

establishing separate cadres for veterinarians and wildlife

biologists to provide the technical expertise needed for the

expanded scientific mandate of tiger conservation. Additionally,

a cadre of sociologists could be formed to engage continuously

with fringe communities, fostering a social fence to support

conservation goals. The Committee underlined the importance of

ongoing capacity building for forest frontline staff, supported by

financial assistance as mandated by relevant legislation. It

emphasized focusing on emerging thematic areas such as

rewilding orphaned or habituated tigers, scientific habitat

management and strict adherence to NTCA Standard Operating

Procedures and guidelines. To attract and retain personnel in

tiger reserves, incremental increases in project and ration

allowances indexed to Dearness Allowance and aligned with

paramilitary force rates are suggested. Ex-gratia payments on

par with paramilitary forces is recommended to be provided in

the event of death in the line of duty. Infrastructure at guard

Page 38 of 80
Writ Petition (C) No. 202 of 1995

camps should include essential amenities such as clean water,

safe housing, sanitary facilities, communication tools and first

aid, with separate provisions for female staff. Family

accommodation consistent with standards for defence and police

personnel in remote postings should be adequately provided,

with enhanced central government support suggested for

establishing residential accommodations and field hostels. Given

the hazardous conditions, insurance coverage for all field

personnel, including contractual and daily wage workers, was

recommended, along with mandatory enrolment in government

health schemes and consideration of free medical care for

injured staff. The Committee also suggested recognition through

state awards and family support equivalent to those granted to

civil police personnel for employees who lose their lives in

service.

34.3. Timely And Adequate Funding Support: The

Committee underscored the necessity of timely and sufficient

funding for effective management of tiger reserves, cautioning

that delays impede conservation efforts and adversely affect the

numerous casual workers employed in these reserves. It

recommended a comprehensive overhaul of fund release

Page 39 of 80
Writ Petition (C) No. 202 of 1995

mechanisms, allowing Tiger Conservation Foundations to receive

financial assistance directly under the Project Tiger component

of the CSS-IDWH. Revenue generated by tiger reserves should be

reinvested into their respective Tiger Conservation Foundations

to address management issues within the reserves and their

zones of influence.

34.4. Provisions of Arms to Forest Officials And Staff:

The Committee proposed that firearms be provided to all forest

officers from Beat Guard to Forester level on a phased basis,

targeting 50% coverage within three years and 75% within five

years. The selection of firearms should reflect local threat

assessments and be comparable to police forces operating in the

same region. Deputy Rangers and Range Officers were

recommended to receive pistols or revolvers similar to those

issued to police officers of corresponding ranks. Licensing

requirements should be waived for the firearms assigned to

forest personnel. Detailed operational guidelines for firearm use

should be established by states, coupled with legal immunity for

personnel under relevant national security legislation. The

Committee further suggested that states should consider raising

specialized Forest Battalions deployed under the operational

Page 40 of 80
Writ Petition (C) No. 202 of 1995

command of Forest Officers, potentially drawn from police units

and provided with advanced jungle warfare training to reinforce

forest department capabilities.

34.5. Strengthening Forest & Wildlife Crime Prevention

And Investigation: It is recommended that the Wildlife Crime

Control Bureau, Field Directors of Tiger Reserves, and Chief

Wildlife Wardens be empowered to access Call Detail Records

(CDRs) and conduct surveillance investigations related to forest

and wildlife offences, acknowledging that only a few states

currently have this provision. The Committee urged the

establishment of dedicated Wildlife Crime Cells and Special

Prosecution Wings within forest departments across all states,

modelled after successful frameworks such as Madhya Pradesh’s

Special Task Force. Enhancing collaboration between police and

forest departments is encouraged along with the creation and

adequate funding of Special Tiger Protection Forces in sensitive

tiger reserves. The development and mandatory enforcement of

Standard Operating Procedures for forensic involvement in

wildlife crimes by state Forensic Science Laboratories was also

proposed.

Page 41 of 80
Writ Petition (C) No. 202 of 1995

34.6. Setting Up Fast Track Courts/Benches For Forest

& Wildlife Crimes: To ensure expeditious justice, the

Committee recommended establishing fast track or dedicated

courts specifically tasked with forest and wildlife crime cases.

34.7. Proper Human-Wildlife Conflict Management: The

Committee suggested that states should implement inclusive

and efficient compensation policies addressing crop damage and

loss of human and livestock life. It recommended for enhanced

coordination among various agencies, with clear delineation of

responsibilities, to reduce response times for human-wildlife

conflict incidents. The designation of human-wildlife conflict as

a ‘natural disaster’, as done by some states, was encouraged for

wider adoption. Additionally, states were directed to provide ex-

gratia payments as per established governmental guidelines. The

Committee proposed the creation of a centrally trained and

equipped rapid response force termed as ‘Green Commandos’

capable of wildlife rescue operations and immediate deployment

nationwide through a centralized command and control centre,

maintained in a constant state of readiness through ongoing

training.

Page 42 of 80
Writ Petition (C) No. 202 of 1995

34.8. Green Infrastructure Development: While

acknowledging the need for infrastructure development, the

Committee emphasized avoidance strategies in wildlife-bearing

forests as the primary mitigation measure. It called for the

uploading of comprehensive information on tiger reserves,

corridors, protected areas, and ESZs onto the Central

Government’s ‘Gati Shakti’ portal. Strict adherence to mitigation

measures prescribed by relevant authorities, including the

Wildlife Institute of India, the NTCA, and the National Board of

Wildlife, was recommended for all development activities,

including linear infrastructure projects. For transmission lines

traversing tiger reserves, insulated cables, bunch cabling or

underground laying should be employed wherever technically

feasible to minimize wildlife disturbance.

34.9. Regulation of Religious Tourism: The Committee

recognized the significant influx of pilgrims at places of worship

within some tiger reserves and recommended strict regulation of

pilgrimage activities. It recommended that the government

should facilitate eco-friendly, multi-seater vehicles or buses to

transport devotees, minimizing environmental impact in a

phased manner. The exploration of alternative transport modes

Page 43 of 80
Writ Petition (C) No. 202 of 1995

such as ropeways, skywalks and tunnels was also encouraged to

accommodate sustainable pilgrimage access.

35. Steps to be taken for scrupulously implementing these

recommendations

35.1. Lastly, in compliance with this Court’s direction (in

paragraph 178.4.8), the Committee has also made various

suggestions for measures to ensure effective implementation of

these recommendations, and the consequent directions that this

Court will pass. These can be broadly categorised as follows:

35.2. Statutory Requirements: In its report, the

Committee recommends that all States be directed to notify the

core and buffer areas of their Tiger Reserves, emphasizing that

such delineation is essential for implementing a landscape

approach to tiger conservation and managing tiger land tenure

dynamics. The Committee notes that while 23 TCPs are currently

in effect and 25 are under revision, several States are yet to

submit their Plans and suggests that all States must prepare or

update their TCPs within three months. To enhance governance,

the Committee suggests the constitution of a Steering Committee

at each Tiger Reserve, comprising the Chief Minister as

Chairperson, the Minister in-charge of Wildlife as Vice-

Page 44 of 80
Writ Petition (C) No. 202 of 1995

Chairperson, officials including field directors, representatives

from tribal affairs, wildlife experts with tribal development

experience, members of the Tribal Advisory Council,

representatives from Panchayati Raj and Social Justice

departments and the Chief Wildlife Warden as Member

Secretary. Recognizing that such committees seldom convene

despite being constituted, the Committee advises that these

bodies be established in all reserves within three months and

mandatorily meet at least twice a year. The Committee further

suggests strict adherence to NTCA guidelines on tourism,

including a complete ban on night tourism and fostering

primarily community-based tourism around reserves.

35.3. Human Resource Development: The Committee

advises strict prohibition on outsourcing forest staff officers and

recommends that the MoEF&CC consult the Central Empowered

Committee to fill vacancies in all Tiger Reserves within three

months. It highlights the need for wildlife-trained officers and

suggests that States consult the NTCA before appointing Field

Directors to ensure no such positions remain vacant. To

incentivize postings in remote areas, the Committee proposes

considering military-style benefits such as retaining government

Page 45 of 80
Writ Petition (C) No. 202 of 1995

accommodation in chosen locations and instituting medals for

exemplary service, which may boost morale and loyalty among

frontline staff who often maintain multiple residences. The

report also identifies the need for upgrading existing anti-

poaching infrastructure to provide adequate amenities and

suggests permanent secondment of technically qualified officers

to institutional bodies for periodic supervision. Continuous

capacity-building programs for all staff and officials are

recommended to maintain operational proficiency.

35.4. The Financial Conundrum: The Committee

recommends enhancing resource inputs for Tiger Conservation

Foundations by encouraging States to increase tourism tariffs

substantially to align with low-volume, high-value eco-tourism,

enabling concessional rates for local communities and school

children. It suggested exploring the feasibility of promoting

responsible tourism in buffer areas and developing alternate,

less environmentally damaging tourism forms like nature walks

and treks. The Committee also proposes the levying of

conservation fees on accommodation facilities based on bed

count or a percentage of accommodation fees, as well as

environmental fees on vehicles entering ESZs. Furthermore, the

Page 46 of 80
Writ Petition (C) No. 202 of 1995

Committee encourages NTCA and States to collaborate on

evaluating ecosystem services provided by reserves, establishing

mechanisms to charge downstream beneficiaries, and equitably

sharing resultant revenues between reserve authorities and local

communities.

35.5. The Development Paradigm: The Committee

stresses that core and critical tiger habitat areas should be kept

inviolate under all circumstances with no projects detrimental to

nature permitted. It highlights the critical need for security

forces operating in tiger reserves near international boundaries

to avoid establishing permanent infrastructure within core areas

which could cause ongoing disturbance due to troop movements

and logistics.

35.6. Other Suggestions: To prevent overcrowding at tiger

sighting locations, the Committee suggests mandating GPS

tracking devices on all tourist vehicles and imposing stringent

penalties on vehicles arriving beyond the first two at sighting

spots. It recommends regular training and capacity-building for

tourist vehicle drivers and guides to ensure responsible

behaviour within reserves. The Committee advises fixing the

boundaries and access routes of religious sites within reserves

Page 47 of 80
Writ Petition (C) No. 202 of 1995

as they existed at the time of reserve notification, prohibiting new

construction including temporary structures. Pilgrim travel

should be restricted to CNG or electric vehicles, with pedestrian

access disallowed. Managing committees for such religious sites

might include the Field Director, District Collector, and

Superintendent of Police as special invitees whose roles should

be limited to protection without involvement in daily temple

operations. Finally, the Committee suggests prohibiting cooking

during mass feasts inside reserves to prevent illegal fuelwood

collection while allowing prasad to be prepared on solar-powered

electric stoves in small quantities within temple premises.

IV. DISCUSSION AND ANALYSIS

36. We have extensively considered the diverse and

comprehensive Report submitted by the Expert Committee with

regards to both Corbett Tiger Reserve and the general

recommendations to be implemented with regards to Tiger

Safaris and Tiger Reserves.

37. Previously in T.N.Godavarman (supra), we were mindful of

the importance of employing the principle of restitution, which

in the context of the environment translates to prioritising

Page 48 of 80
Writ Petition (C) No. 202 of 1995

ecological restoration. Reference was made to Article 8 of the

Convention on Biological Diversity, 1992, to which India is a

signatory and also various decisions17 of the Permanent Court of

International Justice (PCIJ), that laid down the standard in

international law for reparations, which was thereafter extended

to restoration of degraded ecosystems.

38. Adopting a restitutive approach has in fact been statutorily

mandated under Section 15(4) of the National Green Tribunals

Act, 2010 where the Tribunal is directed to provide relief

regarding “restitution of the damaged property or environment”.

This statutory duty of the Courts also flows from Article 21, 48A

and 51A(g) of the Constitution of India. Each of these Articles

highlight the importance of the environment in our

constitutional scheme. As per the Constitution, it is our bounden

duty, “to protect and improve the natural environment including

forests, lakes, rivers and wild life, and to have compassion for

living creatures.”

17 The Factory at Chorzow (Germany v. Poland), 13 September 1928, PCIJ,

Merits, p. 47) and Certain Activities Carried Out by Nicaragua in the Border
Area, Compensation Judgment, (2018) I.C.J. Reports 15.

Page 49 of 80
Writ Petition (C) No. 202 of 1995

39. This Court has also recognised this principle in Indian

Council for Enviro-Legal Action & Ors. v. Union of India &

Ors.18 and S. Jagannath v. Union of India & Ors.19 These

cases were relied upon in Bajri Lease LoI Holders Welfare

Society v. State of Rajasthan20 [to which one of us, Gavai, J.

(as he then was) was a member] where it was held as follows:

“19. …. Compensation/penalty to be paid
by those indulging in illegal sand mining
cannot be restricted to the value of
illegally-mined minerals. The cost of
restoration of environment as well as the
cost of ecological services should be part
of the compensation. The “polluter pays”
principle as interpreted by this Court
means that the absolute liability for harm
to the environment extends not only to
compensate the victims of pollution but
also the cost of restoring the
environmental degradation. Remediation
of the damaged environment is part of the
process of “sustainable development” and
as such the polluter is liable to pay the
cost to the individual sufferers as well as
the cost of reversing the damaged ecology.”

40. In T.N. Godavarman (supra) itself, it was held that:

“173. It could thus be seen that, worldwide
as well as in our jurisprudence, the law
has developed and evolved emphasizing on
the restoration of the damaged ecological

18 (1996) 3 SCC 212: 1996 INSC 237 (Para 60 and 66).
19 (1997) 2 SCC 87: 1996 INSC 1466 (Para 49).
20 (2022) 16 SCC 581

Page 50 of 80
Writ Petition (C) No. 202 of 1995

system. A reversal of environmental
damage in conformity with the principle
under Article 8(f) of the CBD is what is
required. At times, the compensatory
afforestation permits forestation at some
other site. However, the principle of
restoration of damaged ecosystem would
require the States to promote the recovery
of threatened species. We are of the
considered view that the States would be
required to take steps for the identification
and effective implementation of active
restoration measures that are localized to
the particular ecosystem that was
damaged. The focus has to be on
restoration of the ecosystem as close and
similar as possible to the specific one that
was damaged.”

41. While considering each individual head of

recommendations made by the Expert Committee, it will be

apposite to refer to paragraph 178.4.3 specifically, which laid

out the factors that must be considered in the Committee’s

recommendations, as they are relevant and serve as guiding

principles for this Court to follow as well:

“178.4.3. While considering the aforesaid
aspect, the Committee shall take into
consideration the following factors:
a) the approach must be of ecocentrism
and not of anthropocentrism;
b) the precautionary principle must be
applied to ensure that the least amount of
environmental damage is caused;
c) the animals sourced shall not be from
outside the Tiger Reserve. Only injured,

Page 51 of 80
Writ Petition (C) No. 202 of 1995

conflicted, or orphaned tigers may be
exhibited as per the 2016 Guidelines. To
that extent the contrary provisions in the
2019 Guidelines stand quashed.
d) That such Safaris should be proximate
to the Rescue Centres.
Needles to state that the aforesaid factors
are only some of the factors to be taken
into consideration and the Committee
would always be at liberty to take such
other factors into consideration as it
deems fit.”

42. It is this Court’s duty, therefore, in light of our

constitutional scheme and international obligations, to adopt

restorative measures that ensure environmental degradation is

firstly mitigated and then reversed and restored to its original

form, while also prioritising mitigation of future risk to the

environment.

V. CONCLUSION

43. In light of the recommendations made by the Expert

Committee, the restitutive approach elaborated hereinabove and

the earlier judgment of this Court dated 6th March 2024, we

deem it appropriate to pass the following directions in

continuation of our earlier orders:

Page 52 of 80
Writ Petition (C) No. 202 of 1995

44. In relation to Corbett Tiger Reserve

With regards Corbett Tiger Reserve, we find it appropriate to

accept the Committee’s recommendations.

44.1. The State of Uttarakhand through the Chief Wildlife

Warden, Uttarakhand, in consultation with the CEC, is directed

to:

44.1.1. Submit a plan for the restoration of the Corbett Tiger

Reserve in line with the recommendations made by the Expert

Committee, within a period of 2 months;

44.1.2. Begin all clearing/demolition of unauthorised

construction as identified by the Expert Committee, before the

lapse of 3 months from the date of this judgment; and

44.1.3. File a compliance affidavit within a period of 1 year

from the date of this judgment.

44.1.4. In relation to Corbett Tiger Reserve, the CEC will

monitor and supervise the implementation of the ecological

restoration plan developed by the State of Uttarakhand. While

developing and implementing this plan and carrying out

afforestation, the State of Uttarakhand must ensure that only

Page 53 of 80
Writ Petition (C) No. 202 of 1995

native and indigenous species are identified, with special care to

not introduce any alien species to the ecosystem.

44.2. With regards to quantification of costs for restoration,

the Committee arrived at a figure of Rs. 4,30,89,110/- as costs

for in-situ ecological restoration. The Committee separately

assessed the potential ecological loss from safari project

activities in monetary terms to be Rs. 22,95,06,306/- with

conceivable net market value of felled timber as Rs.

6,80,00,000/-. Therefore, according to the Committee, the total

damage costs are estimated to be about Rs. 29,80,00,000/-.

44.3. We extensively heard this matter on 30th May 2025.

However, when it was noticed that the aforesaid quantification

of the Committee would adversely affect the State of

Uttarakhand, we re-listed the matter on 14th November 2025 and

heard Shri Abhishek Attrey, learned standing counsel for the

State of Uttarakhand.

44.4. Shri Attrey vehemently objected to the quantification

of Rs. 29,80,00,000/-. It is submitted by Shri Attrey that the

number of trees estimated to be felled as per the FSI report is

6093 and number of trees felled as per record of DFO is 3620,

however, the IIFM picked the numbers given by FSI. He,

Page 54 of 80
Writ Petition (C) No. 202 of 1995

therefore, submitted that the aforesaid amount has been

assessed without there being any foundation for the same.

44.5. We are, however, not inclined to go into the issue with

regard to valuation of quantification of costs for restoration as

well as the potential ecological loss caused from the Safari

project. We are also not inclined to go into the issue with regard

to number of trees felled since trial and the prosecution at the

instance of CBI is pending. Rather, we find that it will be in the

interest of justice that the State of Uttarakhand is directed to

restore the ecological damage caused to the Corbett Tiger

Reserve under the supervision, guidance and control of the CEC.

Needless to say that the Field Director shall periodically report

to the CEC with regard to the restoration and the restoration

work would be carried to the satisfaction of the CEC.

44.6. Also, as per the earlier judgment dated 6th March 2024

in T.N. Godavarman (supra), after the completion of

disciplinary proceedings, proportionate amounts towards the

costs may be recovered by the State of Uttarakhand from the

errant officers.

Page 55 of 80
Writ Petition (C) No. 202 of 1995

45. On whether tiger safaris shall be permitted in the buffer

and fringe areas

The Committee’s findings and recommendations on this aspect,

are also accepted:

45.1. In terms of the proviso to Section 33(a) and the

provisions contained in the Explanation (ii) of sub-section 4 of

Section 38-V of the WLP Act and the judgement of this Court in

T.N. Godavarman (supra), it is categorically held that Tiger

Safari shall not be permitted in the core or a critical tiger habitat

area.

45.2. Tiger Safari shall be established on ‘non-forest land’

or ‘degraded forest land’ in buffer area provided that is not part

of a tiger corridor.

45.3. Tiger Safari shall be allowed only in association with

a full-fledged rescue and rehabilitation centre for tigers where

conflict animals, injured animals or abandoned animals are

housed for care and rehabilitation.

45.4. These Tiger Safaris shall be subject to the conditions

and restrictions mentioned in the Report of the Expert

Committee, and as described in the following paragraph.

Page 56 of 80
Writ Petition (C) No. 202 of 1995

46. Guidelines for Tiger Safaris

46.1. We accept the Committee’s recommendations with

regards to Guidelines for Tiger Safaris and direct that they may

be established and run with due consideration of the

‘Guidelines to Establish Tiger Safari in Buffer and Fringe

Areas of Tiger Reserves 2019’ issued by the NTCA with the

following additional requirements:

46.1.1. The directions of this Court in T.N. Godavarman

(supra) with regard to sourcing of animals shall be strictly

adhered to;

46.1.2. Only animals rescued and/or conflict animals from

the Tiger Reserve or from the same landscape should be housed

in the Tiger Safaris;

46.1.3. Rescue Centre to be established in conjunction with

such Tiger Safari shall provide essential veterinary support to

such facility and help in treatment/care of captured animals;

46.1.4. Tiger Safari should be under the management control

of the Field Director of the concerned Tiger Reserve with

supervision of the Chief Wildlife Warden;

46.1.5. Earnings should be ploughed back through the

concerned Tiger Conservation Foundations;

Page 57 of 80
Writ Petition (C) No. 202 of 1995

46.1.6. Design considerations should be such that there is no

scope for interaction between in-situ and ex-situ populations;

46.1.7. Enclosure design must be approved by the CZA;

46.1.8. Carrying capacity norms should be developed;

46.1.9. Solar/Hybrid/Electric vehicles to be promoted and

number of vehicles also must be regulated; and

46.1.10. Strict Zero Discharge of waste water to be permitted

from safaris.

47. Permissible and prohibited activities in the buffer and

fringe areas of the Tiger Reserve

47.1. Notifying ESZ for Tiger Reserves

47.1.1. Insofar as other protected areas are concerned in

Sanctuaries and National Parks, there exists the concept of Eco-

Sensitive Zones (ESZs) as per the 2011 Notification. The letter

dated 23rd April, 2018 (F.No.15-22/2013-NTCA) issued by the

MoEF&CC to the Chief Wildlife Wardens regarding submission

of proposal for notifying ESZ of Tiger Reserves, specifically

contemplates that the extent of the eco-sensitive zone for the

critical habitat of Tiger Reserves, will at the minimum, include

the buffer and fringe areas. The letter is extracted below:

Page 58 of 80
Writ Petition (C) No. 202 of 1995

“Sub: Submission of proposal for
notifying Eco Sensitive Zones of Tiger
Reserve
Sir,
Reference is invited to the subject cited
above. In this context, I am directed to
request you to kindly furnish proposal for
notifying Eco Sensitive Zones around Tiger
Reserves, as per list enclosed herewith, as
per advisory issued by this Authority in the
matter which states:
1. The entire buffer zone should be included
in the Eco Sensitive Zone
2. A radial cushion of minimum 1 km should
be kept from the critical tiger habitat
wherever the buffer is disjunct/absent
3. Where a Protected Area forms part of the
buffer, then a minimum 1 km cushion
should be demarcated around the said
buffer also.”

47.1.2. We find strength in the rationale of this letter, that the

very minimum protection that buffer zones are entitled to, is that

which is afforded to the environment in ESZs. The letter appears

to be in the spirit of the concept of ESZs, taking forward the

culture of conservation, and therefore, we approve the same. It

follows as a natural corollary that insofar as the buffer zone of a

critical tiger habitat or the buffer zone of the Tiger Reserve is

concerned, the same restrictions as envisaged in the Notification

dated 09.02.2011 will apply.

Page 59 of 80
Writ Petition (C) No. 202 of 1995

47.1.3. We were informed during the proceedings, that not all

Tiger Reserves have notified ESZs. We are of the firm belief that

ESZs cannot only be restricted to Sanctuaries or National Parks,

and must include buffer and peripheral areas of Tiger Reserves

as well. Therefore, all State Governments are hereby directed to

notify ESZs around all Tiger Reserves, including buffer and

fringe areas, no later than 1 year from the date of this judgment.

47.1.4. The formulation of ESZs for these Tiger Reserves will

abide by the letter dated 23rd April 2018 issued by the MoEF&CC

which clarifies that the minimum area comprised in the ESZs

will be the buffer or fringe area of the Tiger Reserve. These ESZs

will be accorded the same safeguards provided in the Notification

dated 9th February 2011, issued by the MoEF&CC, at the

minimum. Therefore, activities that are permitted inside these

ESZs for Tiger Reserves, will be the same as activities which are

governed under the said Notification.

47.1.5. It is specifically clarified by way of this direction that

these notified ESZs will be subject to all the same restrictions as

per the Notification dated 09.02.2011, including the restriction

that within a distance of 1 km from a Tiger Habitat or buffer area,

Page 60 of 80
Writ Petition (C) No. 202 of 1995

or the notified ESZ (whichever is larger), there will be a complete

ban on mining activities.

47.2. Permitted and regulated activities:

In addition to the conditions with regard to areas notified as ESZ

which would be applicable to the buffer or fringe areas of Tiger

Reserves, we also accept the recommendations of the Committee

as to what activities shall be permitted, regulated and prohibited

in the aforesaid areas. We direct the State Governments to take

into consideration these recommendations while framing the

required statutory or regulatory framework. The prohibited and

regulated activities are summarized below:

47.2.1. Prohibited activities:

(i) Commercial mining.

(ii) Setting of saw mills.

(iii) Setting of industries causing pollution (water, air, soil,

noise, etc.).

(iv) Commercial use of firewood for hotels and other

business related establishment.

(v) Establishment of major hydroelectric projects.

(vi) Introduction of exotic species.

(vii) Use of production of any hazardous substances.

Page 61 of 80
Writ Petition (C) No. 202 of 1995

(viii) Undertaking activities related to tourism like over-

flying the tiger reserves by low flying aircraft (including

drones and hot air balloons). The minimum height of

any aircraft shall be at a level which is at least 300m

(1000 ft) above the highest obstacle located within 8 km

of the estimated position of the aircraft.

(ix) Discharge of effluents and solid waste in natural water

bodies or terrestrial area.

(x) Felling of trees without permission from appropriate

authority.

47.2.2. Regulated activities:

(i) Establishment of hotels and resorts as per approved

Tourism prescriptions of Buffer component of the TCP,

which takes care of habitats allowing no restriction on

movement of wild animals.

(ii) Commercial use of natural water resources including

ground water harvesting. As per approved master plan,

which takes care of habitats allowing no restriction on

movement of wild animals.

(iii) Fencing of premises of hotels and lodges.

(iv) Widening of roads.

Page 62 of 80
Writ Petition (C) No. 202 of 1995

(v) Movement of vehicular traffic at night.

(vi) Protection of hill slopes and river banks as per the

master plan.

47.2.3. Other recommendations on permissible and

prohibited activities:

(i) Tiger Conservation Plan should clearly delineate zones

within the buffer areas where new tourism

infrastructure may be developed considering road

accessibility, proximity to village habitations, animal

corridors, etc.

(ii) Development of tourism infrastructure in buffer zones

should be regulated in accordance with the ESZ

notifications issued under the Environment

(Protection) Act 1986.

(iii) Eco friendly tourism facility and infrastructure can be

allowed on non-forest land in buffer area of Tiger

Reserve.

(iv) Tourism infrastructure zone should be marked and

delineated in the buffer area and such tourism zone

should be part of Tiger Conservation Plan and Zonal

Master plan of Eco sensitive zone.

Page 63 of 80
Writ Petition (C) No. 202 of 1995

48. Whether resorts can be permitted within the close

proximity of protected areas and restrictions thereof

With regard to permissibility of the resorts within the close

proximity of the protected areas and if permitted, the restrictions

to be imposed, we accept the recommendations of the

Committee. We, therefore, issue the following directions in that

regard:

48.1. Ecotourism cannot resemble mass tourism and must

be adequately regulated and adhere strictly to NTCA Guidelines;

48.2. New eco-friendly resorts may be allowed in buffer but

shall not be allowed in an identified corridor;

48.3. Homestays and community-managed establishments

should be encouraged and incentives should also be given to

them;

48.4. Zero waste practices should be made mandatory;

48.5. Use of mobile phones within tourism zones of the core

habitat of tiger reserves should not be permitted;

48.6. Vehicular carrying capacity as prescribed in the NTCA

guidelines needs to be calculated and strictly enforced;

48.7. Complete ban on night tourism must be implemented;

Page 64 of 80
Writ Petition (C) No. 202 of 1995

48.8. In those tiger reserves where roads traverse the

core/critical tiger habitat, strict night regulation (no traffic from

dusk to dawn except ambulances/emergency) needs to be

exercised.

49. Permissible noise levels and the distance from the

boundary of the protected forest for which restrictions on

noise level will be applicable

With regard to the permissible noise level and the distance from

the boundary of the protected forests wherein restrictions on

noise would be applicable, the recommendations of the

Committee are accepted by us. We, therefore, issue the following

directions:

49.1. The entire area of the Tiger Reserve (including ESZs of

the Protected Areas) shall be notified as “Silence Zone” under the

Noise Pollution (Regulation and Control) Rules, 2000, within 3

months from the date of this judgment. Further, the authorities

of Tiger Reserve would be empowered to enforce the regulation

of maintaining silence zone and acting under relevant statutes.

49.2. The Central Government, or as the case may be, the

State Government shall also consider declaring that all Protected

Areas of the State and their ESZs notified as Forests under the

Page 65 of 80
Writ Petition (C) No. 202 of 1995

Indian Forest Act, 1927 and respective State Forest Acts, as

Silence Zones with similar norms as above.

50. Measures for effective management of Tiger Reserves,

on a pan-India basis, and steps to be taken for scrupulously

implementing these directions:

The Committee recommended certain measures to be applied on

a pan-India basis for the effective management and protection of

Tiger Reserves, and further, various steps to ensure

implementation of these measures. After considering their

detailed recommendations, we see merit in combining the

recommendations made by the Committee with regard to the

above two headings and accept them as follows, with

modifications where found necessary.

50.1. Statutory Requirements:

50.1.1. Delineation of core and buffer areas: Notifying

buffer areas is imperative for tiger land tenure dynamics to

operate in a landscape and to effectively implement the

landscape approach to conservation. Hence, all the States are

hereby directed to notify the buffer and core areas of the Tiger

Reserves within 6 months from the date of this judgment.

Page 66 of 80
Writ Petition (C) No. 202 of 1995

50.1.2. Preparation of Tiger Conservation Plan: In light of

the findings of the Expert Committee that TCPs are not uniformly

in place, all States are hereby directed to prepare a Tiger

Conservation Plan within a period of 3 months from the date of

this judgment.

50.1.3. Steering Committees: Since the Committee found

that Steering Committees in many States have not framed TCPs

and are not meeting regularly, it is, therefore, directed that

Steering Committee if not yet constituted for each Tiger Reserve,

shall be done so within 2 months from the date of this judgment.

50.1.4. We further direct the NTCA to monitor the issue as to

whether the TCPs have been put in place or not and whether the

Steering Committees have been meeting on a regular basis or

not. It is directed that the Steering Committees shall hold at least

two meetings in a year.

50.1.5. Adherence to the NTCA guidelines on tourism: We

direct that all States must adhere to the NTCA guidelines on

tourism, thus adopting the overarching aim for regulation to

move towards a system of community-based tourism around

Tiger Reserves. Its prescription against night tourism in entirety,

is also hereby approved.

Page 67 of 80
Writ Petition (C) No. 202 of 1995

50.2. Strict Regulatory Regime:

50.2.1. All the States are directed to prepare Tiger

Conservation Plan (TCP) within a period of 6 months from the

date of this judgment;

50.2.2. Financial assistance under the Project Tiger

component of the CSS-IDWH should be mandatorily linked to an

approved Tiger conservation plan;

50.2.3. Forest areas in buffer and corridor regions identified

in the TCP should be managed as per the TCP to ensure harmony

of forestry operations vis-à-vis wildlife concerns;

50.2.4. Forestry operations in forest lands forming part of the

buffer areas should be incorporated in TCP in consultation with

working plan of the State Forest Department;

50.2.5. Critical Tiger Habitat notified under Section 38-V(4)(i)

of the WLP Act should be treated at equivalence with Critical

Wildlife Habitats as per Section 2(b) of the Scheduled Tribes and

other Traditional Forest Dwellers (Recognition of Forest Rights)

Act 2006, as both are decided on scientific principles and

ecological importance with due recognition of rights of tribals

and forest dwellers;

Page 68 of 80
Writ Petition (C) No. 202 of 1995

50.2.6. TCP should also have the tiger carrying capacity

calculated as per extant norms, based on which habitat

interventions should be decided;

50.2.7. While continuing the use of CAMPA funds for

voluntary village relocation, dedicated funds should be

earmarked for this activity to ensure an inviolate core/critical

tiger habitat. Voluntary village relocation should also be

financially assisted in areas of other strategic ecological value

such as villages in buffer or in dispersal routes of tigers.

50.3. Proper Human Resource Development and

Management:

50.3.1. The MoEF&CC and CEC are directed to jointly set up

a Special Cell to review and assess staffing patterns and cadre

requirements in all Tiger Reserves. This exercise shall be

completed in a time-bound manner, no later than within 1 year

from the date of this judgment.

50.3.2. After this exercise is completed, State Governments

will take steps to fill in all the vacancies in various cadres in

accordance with this exercise conducted by this Special Cell, in

a time-bound manner. Special care must be taken to avoid

outsourcing of core patrolling roles and scientific posts, and

Page 69 of 80
Writ Petition (C) No. 202 of 1995

other such jobs which are integral to management of Tiger

Reserves.

50.3.3. The report of the Committee has also considered

various other aspects with regard to human resource

development. In that regard, we pass the following directions:

(a) There shall be strict prohibition on outsourcing of forest

staff officers in performance of core functions.

(b) The MoEF&CC is directed to consult the CEC to fill in

vacancies in all Tiger Reserves in a timebound manner.

(c) All the State Governments are directed to ensure that no

position of any field director is kept vacant.

(d) State Governments are directed to consider the option

for extending the facility of retaining government

accommodation in a place of choice when a staff of the

forest department is posted in remote wildlife areas. It

will not be out of place to mention that such facilities are

made available to the military and paramilitary forces

and also for the employees of the Central Government

working in the remote wildlife areas.

(e) We further find that it is also necessary to incentivize

forest forces in order to boost their morale. In military,

Page 70 of 80
Writ Petition (C) No. 202 of 1995

paramilitary and in police service, various medals are

given for distinguished and exemplary services. Medals

which can be displayed on the uniform need to be

constructively thought of, as currently, there is no such

provision. As the uniform is widely regarded as a piece

of cloth which unifies a field formation, this would not

only give a sense of pride but also enhance the loyalty

towards the organization.

(f) Even the existing anti-poaching infrastructure needs to

be upgraded beyond the existing standards so as to

provide adequate amenities/ facilities to frontline staff

which are deployed here.

(g) Permanent Secondment to institutional bodies for

officers with desirable qualifications (WL trained/field

experience/prior experience at GoI level): With tasks

requiring a high degree of technical supervision on a

periodic basis, it is imperative to retain officers with the

required skill set gained through training, field

experience and most importantly experience at the

NTCA.

(h) Continuous capacity building of Staff and officials.

Page 71 of 80
Writ Petition (C) No. 202 of 1995

(i) States should ensure that vacancies in all levels in Tiger

reserves are filled up on a priority basis, which currently

is the biggest limiting factor in ensuring protection and

other scientific interventions in tiger reserves.

(j) A separate cadre for veterinarians and wildlife biologists

needs to be created for Tiger reserves to assist field

formations to carry out tasks which are highly technical

in nature, keeping in view the enlarged scientific

mandate.

(k) A cadre for Sociologists to engage with the fringe

communities on an ongoing basis to create a social fence

is imperative.

(l) Capacity building of forest frontline should be an

ongoing process with regular financial assistance as

mandated under Section 38-O(1)(j) of the WLP Act.

(m) Focus should be on emerging thematic areas such as

rewilding of orphaned/habituated tigers, scientific

habitat management, Standard Operating Procedures of

the NTCA besides other guidelines and advisories.

(n) To incentivize posting in the tiger reserves the rates of

the project and ration allowance as prescribed in the

Page 72 of 80
Writ Petition (C) No. 202 of 1995

NTCA guidelines need to be enhanced

incrementally whenever Dearness Allowance is

enhanced and be made at par with the para-military

forces.

(o) In the unfortunate event of death in the line of duty, ex-

gratia payment on par with paramilitary forces should

be provided.

(p) Field staff in Tiger Reserves and other forest areas have

to maintain two establishments simply because their

place of posting is deep in the forests and away from any

support such as schooling etc. Family accommodation

for the frontline staff who are posted at remote areas

should be adequately provided across all tiger range

states as per the rules laid down for all serving Defence

and police staff in remote locations. The Central

Government should consider enhanced support to

States for setting up residential accommodation such as

field hostels for families of staff posted in non-family

stations.

(q) The infrastructure of the camps where the guards stay

should have basic facilities like access to clean water,

Page 73 of 80
Writ Petition (C) No. 202 of 1995

safer accommodation, clean washrooms,

communication services and first-aid kits. In camps with

female staff, it is important to provide a separate toilet

and change room.

(r) It is necessary that free medical care for all such persons

sustaining injuries when they work in the field needs to

be considered by the State Governments. Such a step

would act as a great morale booster for the field level

grass root staff.

(s) In the wildlife and forest divisions, field level staffs,

including regular employees and daily wage persons

work under high-risk situations. Many lose their lives

fighting such adversity. As such, it would be appropriate

if an Insurance Cover is made available for any such

forest staff or daily wager who loses his/her life or is

completely disabled in performance of their duty. It must

be ensured that all field personnel including contractual

staff and daily wages are enrolled in the Ayushman

Bharat Scheme.

(t) In military, paramilitary and police services, special

awards are given to those who lay down their lives in the

Page 74 of 80
Writ Petition (C) No. 202 of 1995

line of duty, posthumously and support is provided to

the families of such persons who have sacrificed their

lives for a cause. We find that it will be appropriate if the

Union and State Governments consider extending the

same benefits for the forest posts as well.

50.4. Timely and adequate funding support: The

Committee has expressed concerns with regard to timely and

adequate funding. We, therefore, find that it will be appropriate

to direct that the MoEF&CC, the NTCA and the CEC will jointly

come out with a policy framework on funding for tiger reserves.

Such a policy should contain a Standard Operating Procedure

for raising budgetary grants and assessment and approval of the

same. We direct the MoEF&CC, the NTCA and CEC to formulate

the said policy framework on funding, within a period of 6

months from the date of this judgment.

50.5. Proper Human Wildlife Conflict Management:

Insofar as the recommendations made by the Committee in this

regard, we find that it will be appropriate if the NTCA frames

Model Guidelines, incorporating these suggestions within 6

months from the date of this judgment, which will then in turn

be implemented by the State Governments within 6 months from

Page 75 of 80
Writ Petition (C) No. 202 of 1995

the date the Model Guidelines are issued. It is clarified that the

NTCA may consult the State Governments and the CEC, if

required, while framing these Model Guidelines. The Expert

Committee’s recommendations, which the NTCA may take note

of, are summarized below:

50.5.1. All states should have smooth and inclusive

compensation policies for crop damage, loss of life of both human

and cattle.

50.5.2. In order reduce the timelines to mitigate the issues

resulting out of Human wildlife conflict, close coordination

between different agencies and departments with mandated

responsibilities is ensured.

50.5.3. Notifying ‘Human wildlife conflict’ as a “natural

disaster” (as has already been done by some states like Uttar

Pradesh) should be actively considered by other states. All the

States are directed to give ex-gratia amount of Rs. 10 lakh as

fixed by the MoEF&CC under CSS-IWDH.

50.6. Green Infrastructure Development: We find the

Committee’s recommendations in this regard to be helpful and

accept the same. We, therefore, direct that:

Page 76 of 80
Writ Petition (C) No. 202 of 1995

50.6.1. While infrastructure development is the need of the

hour, “avoidance” in wildlife bearing forests should always be

considered as the first mitigation. All information about Tiger

Reserves, Tiger Corridors, Protected Areas, and ESZ should be

uploaded on the “Gati Shakti” portal of the Central Government.

50.6.2. Mitigation measures as prescribed by the Wildlife

Institute of India, NTCA, Standing Committee of the National

Board of Wildlife for any developmental activity and linear

infrastructure must be strictly followed in the interest of wildlife

conservation and development both.

50.6.3. The transmission lines wherever are required to be

laid through tiger reserves, should be insulated or bunch cabling

to be done or be laid underground as per the technical feasibility.

50.7. Regulation of Religious Tourism: We have come

across various instances wherein the sites for pilgrimage are

situated within the Tiger Reserves. We have also come across the

grievance that on account of huge influx of devotees, there is

large disturbance to the wildlife. It is noticed that hundreds of

people ply within the core areas on account of such pilgrimage.

In order to regulate such disturbances, we find that a balanced

approach needs to be adopted balancing the concerns of the wild

Page 77 of 80
Writ Petition (C) No. 202 of 1995

as well as religious sentiments of the devotees. We are informed

that Sariska Tiger Reserve and some other reserves have issued

certain guidelines so as to regulate the movement of devotees in

the core areas. We find that similar steps are required to be taken

into other Tigers Reserves wherever the sites of pilgrimage are

situated.

51. We, therefore, direct the MoEF&CC as well as the various

State Governments to take necessary steps by notifying rules

and/or by issuing memorandums or circulars for implementing

the directions and recommendations issued hereinabove within

a period of 6 months from the date of this Judgement.

52. We are, however, aware about the fact that in various Tiger

Reserves there could be peculiar situations. We, therefore,

though direct that the aforesaid directions and

recommendations would be made applicable to all the Tiger

Reserves, the State would be at liberty to make minor

modifications in the recommendations made by us hereinabove

in consultation with the Wildlife Institute of India and NTCA.

53. We place on record our appreciation for the assistance

rendered by Ms. Aishwarya Bhati, learned ASG. However, we

will be failing in our duty if we do not make a special mention

Page 78 of 80
Writ Petition (C) No. 202 of 1995

of the valuable assistance rendered by Mr. K. Parameshwar,

learned Amicus Curiae ably assisted by Mr. M.V. Mukunda,

Ms. Kanti, Ms. Raji Gururaj, Mr. Shreenivas Patil and Ms. Veda

Singh, learned counsel. His in-depth research and meticulous

formulations have immensely assisted us in deciding this

issue, which is of paramount importance to environmental and

ecological justice.

54. Though we have requested Mr. K. Parameshwar, learned

Amicus Curiae, who has spent his valuable time in assisting this

Court in environmental matters for a period of almost three

years, to accept an honorarium, he has graciously refused to

accept the same stating that he was privileged to assist the Court

in the core issues pertaining to environment and ecological

preservation.

55. We, however, direct the CEC to pay an honorarium of

Rs.5,00,000/- (Rupees Five Lakh) each to Mr. M.V. Mukunda,

Ms. Kanti, Ms. Raji Gururaj, Mr. Shreenivas Patil and Ms. Veda

Singh, learned counsel, who have put in laborious efforts to

facilitate the learned Amicus Curiae in assisting this Court.

Though, we know that this amount would not be adequate for

Page 79 of 80
Writ Petition (C) No. 202 of 1995

the services rendered by them, we have directed the payment

thereof as a token of appreciation for their services.

……………………………………CJI
(B.R.GAVAI)

……………………………………….J
(AUGUSTINE GEORGE MASIH)

………..…………………………….J
(A.S.CHANDURKAR)

NEW DELHI;
NOVEMBER 17, 2025.

Page 80 of 80
Writ Petition (C) No. 202 of 1995

==================== NEXT DOCUMENT (same Neutral Citation) ====================

2025 INSC 1311 REPORTABLE

IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION

IN RE: SARANDA WILDLIFE SANCTUARY

I.A. NO.153500 OF 2024
[Applications for Direction]
WITH
I.A. NO.153501 OF 2024
[Application for exemption from filing official translation]
WITH
I.A. NO. 153502 OF 2024
[Application for Intervention]
WITH
I.A. NO. 251558 OF 2025
[Applications for Intervention]
WITH
I.A. NO. 252324 OF 2025
[Application for placing on record Additional Facts and
Documents]
WITH
I.A. NO. 252325 OF 2025
[Application for exemption from filing official translation]
WITH
I.A. NO. 252948 OF 2025
[Application for Direction]

WITH

I.A. NO. 252949 OF 2025
[Application for exemption from filing official English
Signature Not Verified

Digitally signed by
Translation of Annexures]
NARENDRA PRASAD
Date: 2025.11.13
11:58:04 IST
Reason:

WITH

1

I.A. NO. 265049 and 265353 OF 2025
[Application for Clarification/Modification and for filing
Additional Documents]
IN
I.A. NO. 252948 OF 2025

WITH
I.A. NO. 268196 OF 2025
[Application for Modification]
IN
I.A. NO.153500 OF 2024

WITH
I.A. NOS. OF 2025
Diary Nos.265620-265621 of 2025
[Applications for Impleadment and Direction]
WITH
I.A. NO. OF 2025
Diary No.272221 of 2025
[Applications for Direction]

IN

WRIT PETITION (C) NO. 202 OF 1995

IN RE: T.N. GODAVARMAN THIRUMULPAD
…PETITIONERS

VERSUS

UNION OF INDIA AND OTHERS …RESPONDENTS

IN THE MATTER OF:

DR. DAYA SHANKAR SRIVASTAVA …APPLICANT

STEEL AUTHORITY OF INDIA LTD. …APPLICANT

2

INDEX

I. INTRODUCTION ……………………………………………………………. 3

II. SUBMISSIONS …………………………………………………………….. 27

III. DISCUSSION AND ANALYSIS ……………………………………….. 31

(i) KEY PROVISIONS CONTAINED IN THE WP ACT ……………… 33

(ii) REPORT BY THE WII………………………………………………….. 39

(iii) NATIONAL FOREST POLICY, 1998 AND NATIONAL WILDLIFE
ACTION PLAN, 2017-31 …………………………………………………… 44

(iv) JUSTICE M.B. SHAH COMMISSION REPORT …………………… 46

(v) STAND TAKEN BY THE STATE OF JHARKHAND ……………… 53

IV. CONCLUSION AND DIRECTIONS ………………………………….. 68

JUDGMENT

B.R. GAVAI, CJI

I. INTRODUCTION

1. The issue in the present matter pertains to the Saranda

forest area in the State of Jharkhand which is undisputedly

one of the most pristine Sal forests in the world. It is a

biodiversity hotspot, interconnected with forests in the States of

Odisha and Chhattisgarh, creating a contiguous wildlife corridor.

The region is rich in biodiversity and wildlife and includes

within its confines the critically endangered and endemic Sal

Forest Tortoise, four horned antelope, Asian palm civet, wild

3

elephants, leopards, sambar and chital deer, bison, barking deer,

and numerous species of birds and reptiles.

2. The erstwhile unified State of Bihar, by a notification

bearing No. 1168F dated 16th February 19681 declared an

extent of 31,468.25 hectares (approx. 314 sq. kms) in the

Saranda forest area as the “Saranda Game Sanctuary”. This

was done pursuant to relevant provisions of the Bihar Forest,

Hunting, Shooting and Fishing Rules, 1958. On bifurcation of

the then State of Bihar into States of Bihar and Jharkhand,

this area now falls within the State of Jharkhand.

3. One Dr. R.K. Singh, a distinguished wildlife scientist, being

aggrieved by the fact that the Government of Jharkhand2 and

Ministry of Environment, Forests and Climate Change3 had failed

to declare the Eco-Sensitive Zone4 in respect of

Sasangada/Saranda Sanctuary based in the West Singbhum

District of Jharkhand, filed an Original Application being OA No.

59/2020/EZ before the National Green Tribunal, Eastern Zone

Bench, Kolkata5. It was specifically contended in the said OA that

the two massive iron ore mining projects, Kiriburu and

1 Hereinafter, “1968 Notification”.
2 Hereinafter, “GoJ”.
3 Hereinafter, “MoEF&CC”.
4 Hereinafter, “ESZ”.
5 Hereinafter, “NGT”.

4

Maghehatuburu, have chronically disturbed the habitat of wild

animals in this locality. It was further contended that the

protection of wildlife is mandatory under the Wildlife

(Protection) Act, 19726 so also that the pristine forest areas

need to be protected under the provisions of the Indian Forest

Act, 1927 and the Forest (Conservation) Act, 1980 bearing in

mind the directions given by this Court in the present

proceedings. A relief was, therefore, sought to notify an ESZ

around Sasangada/Saranda Game Sanctuary and the

adjoining Reserve Forests in a time bound manner.

4. The learned NGT, vide order dated 12th July 2022,

passed the following direction:

“34. Annexure-2 to the Original Application mentions
that the area of the Saranda/Sasangada Forest is
about 31,468.25 hectares. This is a huge area of
pristine forest and whether it has been declared as
Game Sanctuary or not, it is nevertheless a
repository of some of the finest Sal Forest in the
country having rich wildlife and requires protection
and preservation and, therefore, a direction is
issued to the State Respondents to consider
whether the same needs to be declared as a
Sanctuary since it has nowhere been stated by the
State Respondents in their various affidavits that
this massive area does not have any wildlife.”
[Emphasis supplied]

6 Hereinafter, “WP Act”.

5

5. Thereafter, since no action was taken by the GoJ in

this respect, an IA came to be filed before this Court in the

present proceedings being IA No.153500 of 2024 by one Dr.

Daya Shankar Srivastava, a resident of Palama, Jharkhand,

seeking directions to the State of Jharkhand to declare the

Saranda Game Sanctuary with area of 314.68 sq. km. as notified

by the 1968 Notification by the erstwhile State of Bihar as a deemed

sanctuary under the provisions of the WP Act.

6. Alongwith the IA for directions, two IAs being IA No.

153502 of 2024 seeking permission to intervene in the present

proceedings and IA No.153501 of 2024 seeking exemption

from filing official translation have also been filed by the

applicant.

7. It appears from the material placed on record by the

applicant that vide notification dated 26th September 2001, the

Department of Forest and Environment of GoJ notified the

entire forest area of Saranda, Kolhan, and Porahat Forest

Division as the core area of the Singbhum Elephant

Reserve.

8. Vide order dated 7th August 2024, notice came to be

issued to the State of Jharkhand and MoEF&CC.

6

9. In response thereto, the MoEF&CC filed a counter-

affidavit dated 17th September 2024, wherein it was stated that

no record was available with the State of Jharkhand as to the

notification of Saranda Game Sanctuary in 1986.

10. A counter-affidavit also came to be filed by the State of

Jharkhand dated 10th November 2024, wherein it was stated

by one Mr. Aviroop Sinha, Divisional Forest Officer7, Saranda,

Chaibasa, West Singhbum that in the last Working Plan of

Saranda Forest Division prepared by one Mr. K.S. Rajhans for

the period between 1976-77 and 1995-96 based on the 1968

Notification, the land in question consisted of 126 compartments

of five Reserve Forest Blocks and two Protected Forest Blocks

covering an area of 31,468.25 hectares.

11. It will be relevant to refer to the following statements

made in the said affidavit:

“7. …Besides since the inception of these Notified (R.F.
& P.F.) Forests within the stated area of 31,468.25
Hectares (vide Notification No. 1168 F dated
16.02.1968) compromising (sic) of 126
Compartments, neither any kind of mining
excavation operations nor any diversion of Forest
Land for Mining purpose as approved by Forest
Conservation Act 1980 has been undertaken,
except for part area of approximately 4.31 hectares
within compartments KP12 and KP 21 has been

7 Hereinafter, “DFO”.

7

diverted by Kiriburu Meghahataburu Iron Ore Mine
for non-excavatory ancillary mining activity (Road).
Moreover, as on date, there are no operational
mines inside the 126 compartments of stated
within the stated area of 31,468.25 Hectares.”
[Emphasis supplied]

12. It can thus be seen that it was clearly stated that except

for part area of 4.31 hectares within compartments KP12 and

KP 21 where iron ore mine was located, neither any kind of

mining excavation operations nor any diversion of forest land

for mining purpose has been undertaken in respect of the said

area of 31,468.25 hectares.

13. Upon perusal of the aforesaid affidavit, this Court

passed an order on 20th November 2024, which reads thus:

“……………..
5. It is not in dispute that the said area consists of
pristine forest and it is a repository of some of the finest
Sal trees in the country. It is also not disputed that it
is having rich wildlife and as such requires protection
and preservation.
6. A period of 2½ years has lapsed from the date on
which the aforesaid observations were made by the
learned NGT.
7. Since the State places reliance on the judgment of
the NGT, it should have explained to us as to why it
has not followed the directions issued by the learned
NGT.
8. The 2006 Amendment to the 1972 Act has been
brought into effect with a purpose of imposing
stringent restrictions for the protection of wildlife.

8

If that be so, there is no reason as to why the State
did not take steps to implement the directions
issued by the learned NGT on 12.07.2022.
9. We, therefore, direct the State to file an affidavit
explaining the aforesaid within a period of two weeks
from today.”
[Emphasis supplied]

14. In pursuance to the aforesaid order, an affidavit dated

2nd December 2024 came to be filed by the DFO, Saranda stating

therein that the Principal Chief Conservator of Forest Wildlife8-

cum-Chief Wildlife Warden9 had moved a proposal on

29th November 2024 for the declaration of Saranda Wildlife

Sanctuary and Sasangdaburu Conservation Reserve. It was

stated that the proposal sought to declare an area of approx.

575.1941 sq. kms. as “Saranda Wildlife Sanctuary” and an

area of approx. 136 sq. kms. as “Sasangdaburu Conservation

Reserve” in accordance with a map proposed by the Wildlife

Institute of India10 dated 29th November 2024.

15. It will be relevant to refer to the following averments

made in the said affidavit dated 2nd December 2024:

“10. That the stated proposal is also in conformity
with the Management Plan for sustainable Mining
(MPSM) in Saranda and Chaibasa in Singbhum

8 Hereinafter, “PCCF-WL”.
9 Hereinafter, “CWLW”.
10 Hereinafter, “WII”.

9

district. Besides, due consideration has been
given for inclusion of the Conservation Area (in
MPSM) which is also having two biodiversity
hotspot zones, while delineating the boundaries
of the proposed “Saranda Wildlife Sanctuary” and
‘Sasangdaburu Conservation Reserve’.”

16. It can thus be seen that the State specifically submitted

that the stated proposal is also in conformity with the

Management Plan for Sustainable Mining11 in Saranda and

Chaibasa in Singbhum district. Upon perusal of the affidavit

dated 2nd December 2024, this Court passed the following

order on 20th February 2025:

“1. The issue in these applications pertains to
Saranda Game Sanctuary in Saranda Forest
Division.
2. In the affidavit dated 02.12.2024 filed by Mr.
Aviroop Sinha, DFO Saranda, Van Bhawan,
Chaibasa, it is stated that the Principal Chief
Conservator of Forest Wildlife (PCCF-WL)- cum-Chief
Wildlife Warden (CWLW), Jharkhand vide its Memo
No. 1263 dated 29.11.2024 has moved a proposal to
the Government of Jharkhand for declaration of
“Saranda Wildlife Sanctuary” and “Sasangdaburu
Conservation Reserve”.
3. In paragraph 9 of the said affidavit, the details of
the areas to be included in “Saranda Wildlife
Sanctuary” admeasuring 575.1941 sq. kms. and the
areas to be included in “Sasangdaburu Conservation
Reserve” admeasuring 136.03806 sq. kms. have been
given.

11 Hereinafter, “MPSM”

10

4. We expect the State of Jharkhand to take a final
decision in that regard expeditiously.
5. List these applications on 16.04.2025.”

17. When the matter was thereafter listed before this Court

on 16th April 2025, an affidavit came to be filed by the same

officer, Mr. Aviroop Sinha. In the said affidavit, it was stated

that the proposal for declaration of protected areas under the

WP Act, namely Saranda and Sasangdaburu was received from

PCCF-WL-cum-CMLW on 29th November 2024 and the same

has been sent back by the Department of Forest, Environment

and Climate Change, GoJ to the Principal Chief Conservator of

Forests12 (HoFF) on 23rd March 2025 for his examination and

comments.

18. Taking a serious note of this change of stand by the

State Government, this Court passed the following order on

16th April 2025:

“……….
8. It was almost after a period of four months from
the date on which the proposal was received by the
State Government from PCCF-WL-cum-CMLW that
the proposal has again been sent back to the
Principal Chief Conservator of Forests for his
comments.

12 Hereinafter, “PCCF”.

11

9. We do not understand the propriety of keeping
the matters pending almost for four months,
particularly when an impression was given to this
Court in the affidavit dated 02.12.2024 that the
matter is being processed expeditiously by the
State Government.
10. The Secretary, Department of Forest,
Environment and Climate Change, Government of
Jharkhand is, therefore, directed to remain present
in this Court on 29.04.2025 at 10:30 a.m. and show
cause as to why action should not be taken for dilly
dallying the matter without any valid reasons.
………”
[Emphasis supplied]

19. Accordingly, a compliance affidavit came to be filed on

28th April 2025 in furtherance of the directions issued by this

Court vide order dated 16th April 2025. In the said affidavit

filed by one Mr. Aboobacker Siddique P, working as Secretary,

Forest, Environment and Climate Change, GoJ, a reference

was made to the chronology of events till the said date. It was

stated that upon receiving comments from PCCF (HoFF) on the

proposal submitted by PCCF-WL-cum-CWLW, certain defects

were pointed out in the said proposal and the stand was taken

for rectification of the said defects.

20. It will be relevant to refer to paragraph 15 of the said

affidavit dated 28th April 2025:

12

“15. I say that the State Govt. is duty bound to ensure
statutory compliance with the mandate of Wild Life
(Protection) Act, 1972 for declaring any forest as
sanctuaries and conservation reserve. I say that the
intention and commitment of the State Govt. towards
preserving the said area is unwavering and can be
borne by the fact even before submitting the said
Proposal, the State Government had engaged the
services of the premier forest institute of the country,
Wildlife Institute of India, Dehradun to carry out a
detailed Research Proposal on Assessment and
Monitoring of Biodiversity Values in Saranda Forest
Division, and had received a Project Proposal in
March 2024 itself. I reiterate, my and my State Govt’s
commitment to implement the orders of this Hon’ble
Court.”

21. It can thus clearly be seen that the GoJ has clearly

stated that it was duty bound to ensure statutory compliance

with the mandate of WP Act for declaring any forest as

sanctuaries and conservation reserves. By the said affidavit,

the State Government had expressed its unwavering intention

and commitment to preserving the said area. The affidavit

would also show that the State Government had engaged the

services of the WII to carry out a detailed research proposal for

assessment and monitoring of biodiversity values in Saranda

Forest Division. The affidavit further stated that the State

Government was awaiting the response/detailed justification

from the WII in respect of the proposed Saranda Wildlife

13

Sanctuary and Conservation Reserve, along with supporting

documents, for identifying the potential area for declaration as

a protected area under the WP Act. The State of Jharkhand by

the said affidavit, therefore, prayed for further reasonable time

to obtain all necessary approvals and to carry out all requisite

statutory compliances and procedural formalities.

22. Therefore, the matter was listed on 29th April 2025. It

will be relevant to refer to the order passed by this Court dated

29th April 2025, which reads thus:

“……..
9. In the affidavit it is stated that now the State
Government has proposed to notify an area of
57,519.41 hectares as against the original proposal
of 31,468.25 hectares as the Wildlife Sanctuary. It is
further stated that an area admeasuring 136.03806
sq. kms. or 13603.806 hectares, has been proposed
to be notified as a Conservation Reserve. It is stated
that the proposal has now been sent for comments to
the Wildlife Institute of India, Dehradun (WII). It is
stated that as soon as the comments are received
from the WII the proposal would be placed before the
State Wildlife 15 Board (SWB) and upon the decision
of the SWB, the matter would be placed before the
State Cabinet and after the approval by the State
Cabinet, the final notification would be issued.
10. We, therefore, request the WII to examine the
proposal and forward the proposal along with its
comments to the State of Jharkhand within a period
of one month from today. The Secretary, Department
of Forest, Environment and Climate Change,
Jharkhand would communicate this order to the WII.
On receipt of the comments from WII, we direct the

14

State of Jharkhand to complete all the formalities
within a period of two months thereafter.
……….”

23. Pursuant to the aforesaid order, the State of

Jharkhand filed a supplementary affidavit on 22nd July 2025

stating therein that the WII examined the proposal and

submitted its report on 30th May 2025. It was stated that the

WII report was placed before the Chief Minister-cum-

Department Minister, for in-principal approval. It was further

stated that the Competent Authority had directed the Chief

Secretary, Jharkhand to convene a meeting with the Industry

Department, Mines and Geology Department, Forest

Department and Revenue Department to consider the proposal.

It was further stated that the said meeting was convened on 13th

May 2025. It was stated that during the course of the said

meeting, the Mines and Geology Department presented

concerns regarding the aforementioned proposal dated 29th

April 2025. It was stated that consequently a committee was

constituted under the Chairmanship of the Chief Conservator

of Forest, Wildlife, Jharkhand consisting of various officers as

Members, with a mandate to thoroughly review the proposals

for Saranda Wildlife Sanctuary. It was stated that the

15

committee held four meetings and submitted its report on 3rd

July 2025. The conclusion of the report is as follows:

“As per the opinion and submission of Wild Life Institute
of India/Mines and Geology Department/Forest
Department Saranda Wild Life Sanctuary may be
declared as per the provision of Wild Life (Protection) Act,
1972 after obtaining the approval from SBWL. Thereafter,
the decision on Sasangdaburu Conservation Reserve may
be considered in future.”

24. This Court was informed by the said affidavit that the next

meeting of the State Board for Wildlife13 was scheduled for the

1st August 2025 and the proposal for declaration of Saranda Wildlife

Sanctuary would be placed before the SBWL for thorough

deliberation.

25. Thereafter, the matter was listed before this Court on

17th September 2025. It will be relevant to refer to the entire order

passed by this Court on 17th September 2025:

“1. From the perusal of the material placed before us, it
appears to us that the State of Uttarakhand (sic) is
indulging in not only dilly dallying tactics, but is also
attempting to take the Court for a ride.
2. It was earlier brought to the notice of this Court that
in spite of the NGT issuing a direction to the State
Government vide order dated 12.07.2022 to consider
whether the area of Saranda/Sasangada Forest needs to
be declared as a sanctuary or not, the State of Jharkhand
had not taken any steps.

13 Hereinafter, “SBWL”.

16

3. The applicant herein, therefore, was required to file an
I.A. No.153500/2024. This Court vide order dated
20.11.2024 had recorded that it was not in dispute that
the area consists of pristine forest and it is a repository of
some of the finest Sal trees in the country. The Court also
recorded that it was an undisputed position that the said
area was having rich wildlife and as such requires
protection and preservation. The Court therefore,
prima facie observed that there was no reason as to
why the State did not take steps to implement the
directions issued by the NGT on 12.07.2022. We,
therefore, directed the State to file an affidavit explaining
the aforesaid position within a period of two weeks from
the date of said order, i.e. 20.11.2024.
4. In compliance to the aforesaid, an affidavit was filed
before this Court on 02.12.2024. In the said affidavit it
was stated that the Principal Chief Conservator of Forest
Wildlife (PCCF-WL)-cum-Chief Wildlife Warden (CWLW),
Jharkhand vide Memo No. 1263 dated 29.11.2024 had
moved a proposal to the Government of Jharkhand for
declaration of “Saranda Wildlife Sanctuary” and
“Sasangdaburu Conservation Reserve”. In the said
affidavit, the details of the area to be included in the
Saranda wildlife sanctuary was shown as 575.1941 sq.
km. and the area to be included in Sasangdaburu
Conservation Reserve was shown as 136.03806 sq. km.
5. Vide our order dated 20.02.2025, we expected that
the State Government would take action
expeditiously.
6. Thereafter, when the matter was listed before us on
16.04.2025, another affidavit was filed by the State
Government stating therein that the matter was
examined by the Department of Forest, Environment and
Climate Change, Government of Jharkhand and was
sent back on 23.03.2025 to the PCCF (HoFF) for
examination.
7. This Court vide order dated 16.04.2025 specifically
found that it was almost after a period of four months
from the date on which the proposal was received by the
State Government from the PCCF-WL cum CWLW that
the proposal was again sent back to the Principal Chief

17

Conservator of Forest for his comments. The Court
expressed that there was no propriety of keeping the
matters pending for almost four months, particularly
when an impression was given to this Court in the
affidavit dated 02.12.2024 that the matter is being
processed expeditiously by the State Government.
We had, therefore, directed the Secretary, Department of
Forest, Environment and Climate Change, Government
of Jharkhand to remain present before this Court on
29.04.2025.
8. On 29.04.2025, Mr. Abu Bakr Siddiqui, Secretary,
Department of Forest, Environment and Climate Change,
Government of Jharkhand was present in the Court. An
affidavit was also filed on behalf of the State Government.
In the said affidavit, it was specifically stated that the
State Government had proposed to notify an area of
57,519.41 Hectares as against the original proposal
of 31,468.25 Hectares as the wildlife sanctuary. The
affidavit further stated that an area admeasuring
136.03806 sq. km. Or 13603.806 Hectares has been
proposed to be notified as conservation reserve. It was
further stated that the proposal was sent for comments
to the wildlife Institute of India (WII), Dehradun. It was
also stated that as soon as the comments are
received from the WII, the proposal would be placed
before the State Cabinet and after the approval of the
State Cabinet, the final notification would be issued.
9. On the basis of the said affidavit dated 29.04.2025,
we had requested the WII to examine the proposal
and forward the same along with its comments to the
State of Jharkhand within a period of one month
from the said date. We had also directed the Secretary,
Department of Forest, Environment and Climate Change,
Jharkhand, to communicate the order to the WII. We had
further directed the State of Jharkhand to complete
all the formalities upon receipt of the comments
from WII within a period of two months thereafter.
10. A supplementary affidavit filed by the State dated
22.07.2025 states that the WII has given its positive
recommendations Vide report dated 30.05.2025.

18

11. In that view of the matter, the State was expected
to complete the formality, i.e. the approval of the
State Wildlife Board and the Cabinet within a period
of two months thereafter, i.e. on 30.07.2025.
However, now we are informed that the Chief
Secretary of the State of Jharkhand on 13.05.2025
constituted a Committee under the Chairmanship of
Chief Conservator of Forest for conducting ‘a
comprehensive review of the boundary/area
determination of the proposed Sanctuary in
consideration of the interest of the State and in
compliance with the orders of the Hon’ble Supreme
Court’.
12. The primary reason given in the said letter was that
the Geological Survey of India has identified certain
Prospecting Areas for future mining which fall within the
proposed area of Saranda Wildlife Sanctuary.
13. It is, thus, clear to us that the conduct of the
State, to say the least, has been totally unfair. When
on various occasions, i.e. on 20.02.2025, 16.04.2025
& 29.04.2025, a clear indication was given to the
Court that the State has proposed to notify an area
of 57,519.41 Hectares as wildlife sanctuary and
conversation (sic) reserve, now the State is turning
on its stand by appointing a Committee for the same
purpose vide order dated 13.05.2025. If the State was
alive to the concerns expressed in the Minutes dated
13.05.2025, then nothing prohibited it from placing
the same before this Court in the affidavit dated
02.12.2024, or the affidavit dated 29.04.2025.
14. As a matter of fact, when the Secretary was present
in the Court, in the affidavit dated 29.04.2024, a clear
indication was given to the Court that upon approval by
the WII, all the necessary formalities, i.e. obtaining the
approval of the State Wildlife Board and the Cabinet
would be completed. We had, therefore, given two
months period to comply with the formalities.
15. We are of the considered view that the State
Government of Jharkhand is in clear Contempt of the
order passed by this Court on 29.04.2025.

19

16. We, therefore, direct the Chief Secretary of the State
of Jharkhand to remain present in this Court on
08.10.2025 at 10.30 am and show cause as to why an
action should not be taken against him for committing
Contempt of the order of this Court dated 29.04.2025.
17. We further clarify that if the State fails to comply with
its statements made in the affidavit dated 29.04.2025,
the Court would be required to issue a Mandamus
commanding the State to comply with the statement
made before this Court.
18. The application for intervention is rejected while
reserving the rights of the applicant to take recourse to
such remedies as are available in law.
19. If the order dated 29.04.2025 is complied with in the
meantime, the personal presence of the Chief Secretary,
State of Uttarakhand shall stand exempted.
20. List on 08.10.2025.”
[Emphasis supplied]

26. A perusal of the aforesaid order would reveal that on the

said date, this Court was informed that the Chief Secretary of the

State of Jharkhand on 13th May 2025 constituted a Committee

under the Chairmanship of Chief Conservator of Forest for

conducting a comprehensive review of the boundary/area

determination of the proposed Sanctuary in consideration of the

interest of the State and in compliance with the orders of this Court.

We had noted that the primary reason given in the letter appointing

the said Committee was that the Geological Survey of India has

identified certain Prospecting Areas for future mining which fall

20

within the proposed area of Saranda Wildlife Sanctuary. We had,

therefore, observed that the conduct of the State, to say the least,

had been totally unfair. We further observed that on various

occasions, i.e., on 20th February 2025, 16th April 2025 and 29th

April 2025, a clear indication was given to the Court that the State

had proposed to notify an area of 57,519.41 hectares as wildlife

sanctuary and conservation reserve, but now the State was turning

around on its stand by appointing a Committee for the same

purpose vide order dated 13th May 2025. We, therefore, directed the

Chief Secretary of the State of Jharkhand to remain present in this

Court on 8th October 2025 and to show cause as to why an action

should not be taken against him for committing contempt of the

order of this Court dated 29th April 2025. We further clarified that

if the State failed to comply with its statements made in the affidavit

dated 29th April 2025, the Court would be required to issue a

mandamus commanding the State to comply with the statement

made before this Court. We further clarified that if the order dated

29th April 2025 was complied with, the personal presence of the

Chief Secretary, State of Uttarakhand shall stand exempted.

27. In pursuance to the order passed by this Court on 17th

September 2025, Shri Avinash Kumar, Chief Secretary, GoJ was

21

personally present in this Court on the next date of listing i.e., 8th

October 2025 and he had also filed an affidavit on 7th October 2025.

28. In the said affidavit, it was stated that the draft proposal

submitted by the PCCF-WL for notifying 57,519.41 hectares as

Saranda Wildlife Sanctuary was made without carrying out a study

or investigation and there was no scientific basis for the same. It

was further stated that the WII, in its hurriedly prepared report,

merely endorsed the draft proposal shared with it by the PCCF-WL.

It was further stated that the WII had not considered the following

issues involved:

(i) Community Displacement and Livelihood Loss

(ii) Socio-Cultural Disruption

(iii) Mining and Economic Security

(iv) Security Concerns

29. On 8th October 2025, we had extensively heard Shri Kapil

Sibal, learned Senior Counsel appearing for the State of Jharkhand

and Shri K. Parameshwar, learned amicus curiae.

30. It will be pertinent to refer to the entire order passed by

this Court on 8th October 2025, which reads thus:

“1. In response to the order passed by this Court dated
17.09.2025, Mr. Avinash Kumar, presently occupying
the office of Chief Secretary, State of Jharkhand is
personally present in the Court.

22

2. We have extensively heard Shri Kapil Sibal, learned
senior counsel appearing for the State of Jharkhand and
Shri K. Parameshwar, learned Amicus Curiae.
3. Shri Sibal, submits that since inception, the proposal
with regard to an area of 31,468.25 hectares for
declaration as a wildlife sanctuary has been under
consideration. However, confusion arose on account of a
communication addressed by the Wildlife Institute of
India (for short “WII”), indicating an area of 57,519.41
hectares. It is stated that on the basis of the said letter, a
statement came to be made before this Court in an
affidavit. However, the WII itself by a subsequent
communication stated that the earlier letter was only a
part of internal communication and the said letter was
not authenticated.
4. It is, therefore, submitted that in view of this situation
a statement came to be made.
5. He further submitted that there is no intention to run
away from the earlier proposal of declaration of Saranda
Wildlife Sanctuary.
6. From the affidavit dated 22.07.2025 sworn by Mr.
Aviroop Sinha, Divisional Forest Officer, Saranda Forest
Division, Chaibasa, Government of Jharkhand, we find
that, at least, an area admeasuring 31,468.25
hectares, has already been notified as game
sanctuary vide Notification No. 1168 F dated
16.02.1968. As such, there should be no difficulty in
notifying the said area as a Wildlife Sanctuary. The
affidavit clearly states that in 126 compartments
situated in the aforesaid area, neither any kind of
mining excavation operations nor any diversion of
Forest Land for Mining purpose has been undertaken.
It is categorically stated that there are no operational
mines inside the 126 compartments of the
aforestated area.
7. In that view of the matter, we see no impediment
in the State proceeding to notify the aforesaid area of
31,468.25 hectares as a Wildlife Sanctuary, which
has already been notified vide Notification dated
16.02.1968.

23

8. Insofar as the other question of including any
additional area is concerned, the same is a matter to be
considered by the State Government in consultation with
the State Wildlife Board.
9. We had issued notice to the Chief Secretary, noticing
that the State of Jharkhand was adopting a topsy-turvy
approach and on every date and the stand was changed.
Earlier though the proposal was sent by the Principal
Chief Conservator of Forest Wildlife (PCCF-WL)-cum-
Chief Wildlife Warden (CMLW), Jharkhand to the State
Government, the State Government again sent it back to
the Principal Chief Conservator of Forests (HoFF) for
reconsideration.
10. As such, we had directed the Secretary, Department
of Forest, Environment and Climate Change, State of
Jhakharnad to remain personally present before this
Court vide our order dated 16.04.2025.
11. Accordingly, on 29.04.2025, the Secretary,
Department of Forest, Environment and Climate Change,
State of Jharkhand was present before this Court. The
impression conveyed was that the State proposed to
notify an area of 57,519.41 hectares as a Wildlife
Sanctuary. The only difficulty indicated was that certain
communications from the WII were not received. This
Court had, therefore, requested the WII to furnish their
comments within a stipulated period.
12. As such, a clear impression was given to the Court
that the State Government intended to notify an area
of 57,519.41 hectares as a Wildlife Sanctuary.
13. Subsequently, a supplementary affidavit came to
be filed on 22.07.2025 stating therein that a
Committee had been constituted to conduct a
comprehensive review of the boundary/area
determination of the proposed sanctuary, keeping in
view the interest of the State and in compliance with
the orders of this Court.
14. In the meantime, an application (I.A. No. 214893 of
2025) also came up for consideration before this Court
filed by one Electrosteel Castings Ltd. seeking directions

24

to keep the proposal for notification of the Saranda
Wildlife Sanctuary in abeyance.
15. In this background, we were not unjustified in
gathering an impression that the State was taking
the Court for a ride. As such, we had directed the
Chief Secretary to remain present in the Court today.
We had further clarified that if the order dated
29.04.2025 passed by this Court was complied with, the
presence of the Chief Secretary shall stand dispensed
with.
16. At least, insofar as an area of 31,468.25 is concerned,
there appears to be no impediment to the State notifying
the said area as a Wildlife Sanctuary.
17. In view of the order passed by this Court on
17.09.2025, we could have issued a mandamus to
that effect today itself inasmuch as the said area is
very well identified.
18. However, Shri Sibal makes a statement that the
State Government shall file an undertaking before
this Court within a period of one week from today to
the effect that the area of 31,468.25 hectares will be
notified as a Wildlife Sanctuary.
19. If the State proposes to include any additional area
to the Wildlife Sanctuary, it shall be at liberty to do so.
20. List these applications on 15.10.2025.”
[Emphasis supplied]

31. It can thus be seen that after hearing the submissions, we

were of the view that even if the stand of the State is to be accepted,

that an area of 57,519.41 hectares was erroneously arrived at,

there should be no difficulty in declaring an area admeasuring

31,468.25 hectares as a wildlife sanctuary, since the same was

already notified as a Game Sanctuary vide the 1968 Notification.

25

We had noticed that the affidavit dated 22nd July 2025 clearly

depicted that in the 126 compartments situated in the aforesaid

area, neither any kind of mining excavation operations nor any

diversion of Forest Land for Mining purpose has been undertaken.

We had also clearly observed that the State of Jharkhand was

adopting a topsy-turvy approach and was changing its stand on

every date. We also observed that in view of the order dated

17th September 2025, we could have issued a mandamus to that

effect on the said date itself. Shri Sibal made a statement that the

State Government shall file an undertaking before this Court within

a period of one week from the date of the said order to the effect

that the area of 31,468.25 hectares would be notified as a Wildlife

Sanctuary.

32. The matter was, thereafter, listed on 15th October 2025

on which date it was adjourned to 17th October 2025.

33. In pursuance to our order dated 8th October 2025,

an undertaking by way of an affidavit was filed on 17th October

2025 on behalf of the State of Jharkhand along with the draft

notification for Saranda Wildlife Sanctuary thereby declaring an

area admeasuring 24,941.64 hectares, which was a part of the

Saranda Reserve Forest Area, as Saranda Wildlife Sanctuary.

26

34. The State also filed an IA being No. 268196 of 2025 for

modification of the order dated 8th October 2025 passed by this

Court on the same date i.e., 17th October 2025. It is pertinent to

note that the prayer in the IA was that the State be allowed to

declare only the proposed area of 24,941.64 hectares as

Saranda Wildlife Sanctuary.

35. Vide an order dated 27th October 2025, after hearing

learned Senior Counsel/counsel for the parties, the matter was

reserved for judgment. In furtherance of the said order, IA Diary No.

272221 of 2025 is also taken up for consideration with the present

batch of applications.

36. In this factual background, the matter arises for

consideration before us.

II. SUBMISSIONS

37. We have heard Shri K. Parameshwar learned

Amicus Curiae, Shri Kapil Sibal learned Senior Counsel for the

State of Jharkhand, Ms. Shibani Ghosh learned counsel for

the Applicant-Dr. Dayanand Shankar Srivastava and

Shri Tushar Mehta learned Solicitor General of India for the

27

Applicant-Steel Authority of India14.

38. Shri Parameshwar, learned Amicus Curiae, placed

before us the entire factual background starting from the

1968 Notification to MPSM in Saranda and Chaibasa in

Singhbum District, Jharkhand, 2018 and the WII’s 2025

Report. He also placed the previous orders of this Court so also

the various affidavits filed by the State.

39. He submitted that the power to declare a sanctuary

under the WP Act, is a power coupled with a duty. It is further

submitted that the State, having recognized the ecological

significance of Saranda Forest area, has a duty and an

obligation to create a statutorily protected area by way of a

wildlife sanctuary.

40. He further submitted that the declaration of a Wildlife

Sanctuary under the WP Act does not affect existing rights of

tribal and forest dwelling communities in the region, which are

protected under Section 3 of the Scheduled Tribes and Other

Traditional Forest Dwellers (Recognition of Forest Rights) Act,

200615.

14 Hereinafter, “SAIL”.
15 Hereinafter, “FRA”.

28

41. Ms. Ghosh, learned counsel appearing on behalf of the

Applicant Dr. Dayanand Shankar Srivastava, submitted that

the State of Jharkhand has failed to fulfil its constitutional

obligation to protect forests and wildlife. It is submitted that

on account of deforestation and mining activities in the forest

areas, elephants are forced to migrate to Chhattisgarh, there

has been a reduction in the population of various species of

wildlife in the area and the Koina river has been severely

damaged.

42. Per contra Shri Sibal, learned Senior Counsel for the

State of Jharkhand, submitted that the Saranda region, which

is proposed to be declared as a Wildlife Sanctuary, is notified

as an area under the Fifth Schedule of the Constitution. It is

submitted that the said area has been inhabited for centuries

by the Ho, Munda, Uraon and allied Adivasi communities

whose subsistence and cultural traditions are intrinsically tied

to forest produce.

43. He submitted that the area sought to be declared as a

Wildlife Sanctuary also encompasses vital public infrastructure

such as roads, schools, health centres, police posts, settled

agricultural lands, etc. He further submitted that the Saranda

29

Forest Division hosts 26% of India’s iron ore reserves, and that

the steel plants of SAIL and Tata, are critically dependent on

the mining in this area. He further submitted that declaration

of entire area as a Wildlife Sanctuary would halt mining and

affect employment opportunities. He, therefore, submitted

that this Court should accept the declaration of 24,941.64

hectares of forest area within the Saranda Forest Division.

44. Shri Tushar Mehta, learned Solicitor General of India

for SAIL, submitted that the mining leases in the State of

Jharkhand form approximately 50% of the total captive iron

ore resource base used by SAIL, and that the continued

utilisation of these valid and subsisting operational leases is

crucial to achieving the production levels envisioned in the

National Steel Policy, 2017. He further submitted that certain

incidental and ancillary activities are undertaken within the

1-km eco-sensitive zone of proposed Wildlife Sanctuary. He,

therefore, sought protection of existing operational mining

leases and ancillary activities falling within proposed wildlife

sanctuary area.

30

III. DISCUSSION AND ANALYSIS

45. From the various affidavits filed by the GoJ since the very

inception including the latest one filed by the Chief Secretary, GoJ,

it is clear that the stand of the GoJ has been that in an area

admeasuring 31,468.25 hectares consisting of 126 compartments,

no mining activities are carried out and that the land is not diverted

for any non-forest use. If that be the case, even if we were to accept

the argument that the area of 57,519.41 hectares was erroneously

mentioned on account of some confusion between the

officers/officials because of the tentative report of the WII, we see

no reason as to why the State should now change its stand to

reduce the area of the wildlife sanctuary from 31,468.25 hectares

to 24,941.64 hectares.

46. The ostensible reason given by the State is that the area in

question comprises of vital public infrastructure, including road

networks, crucial for regional connectivity, educational institutions

and agricultural lands etc. Another reason given is that the area

includes long-established habitations of Scheduled Tribes and

customary lands, indispensable to the livelihood and cultural

practices of the local communities. Another reason given is that the

affidavit filed before this Court by the DFO, Chaibasa, West

31

Singhbum and the Secretary, Ministry of Forest, Environment and

Climate Change, GoJ did not take into consideration the existing

rights of the existing inhabitants of the Game Sanctuary which is

an area covered by the Fifth Schedule of the Constitution of India.

It is further stated that the earlier affidavits have been filed without

taking into consideration as to which areas in the Game Sanctuary

are of adequate ecological, faunal, floral, geomorphological, natural

or zoological significance for the purpose of protecting, propagating

or developing wildlife or its environment and therefore required to

be notified as a Wildlife Sanctuary. Another reason given is that the

declaration of the entire Game Sanctuary as a Wildlife Sanctuary

will also restrict existing mining activities in the ESZ operated by

SAIL and other entities. It stated that the proposed area of 24,

941.64 hectares within the Saranda Forest Division meets the

requirements prescribed under Section 26A of the WP Act and its

declaration as a Wildlife Sanctuary would fully achieve the intended

objectives of wildlife conservation.

47. It is also the contention of the State of Jharkhand that

during the recent field visits, genuine apprehensions were recorded

among indigenous and forest-dependent communities regarding

possible displacement from their ancestral lands.

32

48. The thrust of the arguments of Shri Sibal is that the areas

which have been excluded are the areas where there are

habitations and infrastructural developments. Another

apprehension expressed by Shri Sibal is that if the aforesaid area

is included, it will also lead to the problem of the Naxalite

insurgency in the said area.

(i) KEY PROVISIONS CONTAINED IN THE WP ACT

49. For considering the submissions made before us, it will be

relevant to refer to certain provisions of the WP Act.

50. Section 18 of the WP Act reads thus:

“18. Declaration of sanctuary.—(1) The State
Government may, by notification, declare its
intention to constitute any area other than an area
comprised within any reserve forest or the territorial
waters as a sanctuary if it considers that such area
is of adequate ecological, faunal, floral,
geomorphological, natural or zoological significance,
for the purpose of protecting, propagating or
developing wild life or its environment.
(2) The notification referred to in sub-section (1) shall
specify, as nearly as possible, the situation and limits
of such area.
Explanation.—For the purposes of this section, it
shall be sufficient to describe the area by roads,
rivers, ridges or other well-known or readily
intelligible boundaries.”

33

51. It can thus be seen that Section 18 of the WP Act

empowers the State Government to declare its intention to

constitute any area other than an area comprised within any

reserve forest or the territorial waters as a sanctuary if it

considers that such area is of adequate ecological, faunal,

floral, geomorphological, natural or zoological significance, for

the purpose of protecting, propagating or developing wild life

or its environment.

52. It is thus clear that Section 18 of the WP Act would

apply for declaring any area as a Wildlife Sanctuary which is

not comprised within any reserve forest or the territorial

waters.

53. It will also be relevant to refer to Section 19 of the WP

Act, which reads thus:

“19. Collector to determine rights.—When a
notification has been issued under Section 18, the
Collector shall inquire into, and determine, the
existence, nature and extent of the rights of any
person in or over the land comprised within the limits
of the sanctuary.”

54. It can thus be seen that upon a notification being

issued under Section 18 of the WP Act, the Collector is

required to inquire into, and determine, the existence, nature

34

and extent of the rights of any person in or over the land

comprised within the limits of the sanctuary.

55. Sections 20, 21, 22 and 23 of the WP Act which deal

with the procedures to be adopted by the Collector for

determination of the rights and the extent of powers available

to him, read thus:

“20. Bar of accrual of rights.—After the issue of a
notification under Section 18, no right shall be
acquired in, on or over the land comprised within the
limits of the area specified in such notification,
except by succession, testamentary or intestate.
21. Proclamation by Collector.—When a
notification has been issued under Section 18, the
Collector shall, within a period of sixty days, publish
in the regional language in every town and village in
or in the neighbourhood of the area comprised
therein, a proclamation—
(a) specifying, as nearly as possible, the
situation and the limits of the sanctuary;
and
(b) requiring any person, claiming any
right mentioned in Section 19, to prefer
before the Collector, within two months
from the date of such proclamation, a
written claim in the prescribed form,
specifying the nature and extent of such
right with necessary details and the
amount and particulars of compensation,
if any, claimed in respect thereof.
22. Inquiry by Collector.—The Collector shall, after
service of the prescribed notice upon the claimant,
expeditiously inquire into—
(a) the claim preferred before him under
clause (b) of Section 21, and

35

(b) the existence of any right mentioned in
Section 19 and not claimed under clause
(b) of Section 21,
so far as the same may be ascertainable from the
records of the State Government and the evidence of
any person acquainted with the same.
23. Powers of Collector.—For the purpose of such
inquiry, the Collector may exercise the following
powers, namely:—
(a) the power to enter in or upon any land
and to survey, demarcate and make a map
of the same or to authorise any other
officer to do so;
(b) the same powers as are vested in a civil
court for the trial of suits.”

56. It will also be relevant to refer to Section 24 of the WP

Act which reads thus:

“24. Acquisition of rights.—(1) In the case of a claim
to a right in or over any land referred to in Section
19, the Collector shall pass an order admitting or
rejecting the same in whole or in part.
(2) If such claim is admitted in whole or in part, the
Collector may either—
(a) exclude such land from the limits of the
proposed sanctuary, or
(b) proceed to acquire such land or rights,
except where by an agreement between the
owner of such land or holder of rights and
the Government, the owner or holder of
such rights has agreed to surrender his
rights to the Government, in or over such
land, and on payment of such
compensation, as is provided in the Right
to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and
Resettlement Act, 2013 (30 of 2013),

36

(c) allow, in consultation with the Chief
Wild Life Warden, the continuance of any
right of any person in or over any land
within the limits of the sanctuary.”

57. It can thus clearly be seen that the Collector, in

consultation with the Chief Wildlife Warden, is entitled to allow

the continuance of any right of any person in or over any land

within the limits of the sanctuary.

58. It will also be pertinent to refer to Section 26A of the

WP Act, which reads thus:

“26-A. Declaration for area as sanctuary.—(1)
When—
(a) a notification has been issued under
Section 18 and the period for preferring
claims has elapsed, and all claims, if any,
made in relation to any land in an area
intended to be declared as a sanctuary,
have been disposed of by the State
Government; or
(b) any area comprised within any reserve
forest or any part of the territorial waters
which is considered by the State
Government to be of adequate ecological,
faunal, floral, geomorphological, natural
or zoological significance for the purpose
of protecting, propagating or developing
wild life or its environment, is to be
included in a sanctuary,
the State Government shall issue a notification
specifying the limits of the area which shall be
comprised within the sanctuary and declare that the
said area shall be a sanctuary on and from such date
as may be specified in the notification:

37

Provided that where any part of the territorial waters
is to be so included, prior concurrence of the Central
Government shall be obtained by the State
Government:
Provided further that the limits of the area of the
territorial waters to be included in the sanctuary
shall be determined in consultation with the Chief
Naval Hydrographer of the Central Government and
after taking adequate measures to protect the
occupational interests of the local fishermen.
(2) Notwithstanding anything contained in sub-
section (1), the right of innocent passage of any vessel
or boat through the territorial waters shall not be
affected by the notification issued under sub-section
(1).
(3) No alteration of the boundaries of a sanctuary
shall be made by the State Government except on a
recommendation of the National Board.”

59. A harmonious reading of Section18 with Section 26A of

the WP Act would reveal that the statute itself makes a

distinction between any area other than an area comprised

within any reserve forest or the territorial waters and any area

within any reserve forest or any part of the territorial waters.

60. As discussed hereinabove, insofar as the area

admeasuring 31,468.25 hectares is concerned, from the very

beginning it has been the stand of the GoJ that the said area

comprises of 126 compartments and that within these

compartments, neither any kind of mining excavation

operations nor any diversion of forest land for mining purpose

38

has been undertaken. In none of the affidavits, it has been

stated that the areas concerned do not have ecological, faunal,

floral, geomorphological, natural or zoological significance for the

purpose of protecting, propagating or developing wildlife or its

environment. It is further to be noted that Section 26A of the WP

Act has been brought on the statute book by way of Act 44 of 1991

with effect from 2nd October 1991.

(ii) REPORT BY THE WII

61. It also cannot be disputed that the WII is a body of experts

in the field of wildlife protection who possess the scientific

knowledge with respect to conservation measures.

62. It will, therefore, be relevant to refer to the observations,

findings and recommendations of the WII in its report dated

30th May 2025, which has been placed on record by the GoJ itself

in its affidavit dated 22nd July 2025. With regard to the ecological

importance of the area, the WII observed thus:

“The region, historically recognised for its rich
biodiversity and presently harbouring species like the
Asiatic Elephant, Four-horned Antelope, and Sloth
Bear, is experiencing habitat degradation and
fragmentation. Historical records and ongoing surveys
underscore the presence of numerous threatened
species, highlighting the area’s vital conservation
value. The proposed Saranda Wildlife Sanctuary and
Sasangdaburu Conservation Reserve aim to protect

39

this biodiversity hotspot in the junction of Jharkhand
and Odisha.……… Thus, the proposed area is of
immense ecological, biodiversity (floral and faunal),
and geomorphological significance from historic,
present and future contexts and is critical for the
protection, conservation, propagation and
development of wildlife and its habitat.
……
4. SINGHBHUM ELEPHANT RESERVE
….The Singhbhum Elephant Reserve holds a critical
value for the proposed Saranda Wildlife Sanctuary
and Sasangdaburu Conservation Reserve, as it is
home to a number of elephant corridors and
biodiversity……
LULC map reveals that a substantial portion of the
dense forest cover in the Singhbhum Elephant Reserve
is located within the proposed Saranda Wildlife
Sanctuary and Sasangdaburu Conservation Reserve.
This underscores the importance of the proposed
area, which facilitates species movement within the
Singhbhum Elephant Reserve by functioning as a
vital wildlife corridor and hotspot.”

63. After considering all the aspects concerning the issue, the

WII finally observed thus:

“7. OBSERVATIONS AND DISCUSSION
i. The biodiversity within the Saranda Forest
Division has both historic and contemporary
importance and also act as a crucial ecological
corridor facilitating wildlife connectivity
between the states of Jharkhand and Odisha.
This region is ecologically significant, serving as
an important elephant corridor and providing
passage and home for a diverse array of species
across multiple taxa.
ii. The area has experienced degradation due to
mining operations and encroachment over time.

40

Traditionally, the intricate relationship between
indigenous communities and forest ecosystems,
often characterized by traditional resource
management practices, has contributed to the
relative integrity of these natural environments.
However, increasing anthropogenic pressures
from escalating demographic pressures,
evolving socio-economic conditions, and
heightened resource demands are altering this
relationship, thereby exerting considerable
pressure on the region’s forest resources and
ecological stability (WII, 2016). This
underscores the importance of the Saranda
Forest Division for the proposed Saranda
Wildlife Sanctuary and Sasangdaburu
Conservation Reserve, particularly regarding
elephant movement and corridors within the
Singhbhum Elephant Reserve.
iii. Previous studies have specifically investigated
the occupancy of the Four-horned Antelope
within the Saranda Forest Division (Joshua et
al., 2016). Limited information exists regarding
the status of this species across its various
fragmented habitats in India. Comparing
historical and recent surveys highlights the
ecological significance of the Saranda Forest
Division for the species.
iv. A 2016 study by the Wildlife Institute of India
documented the presence 16 mammal species
from the region. Further, the ongoing study by
WII in the Saranda Forest Division has recorded
23 mammal species. Although the abundance
of species in the Gua range may be relatively
lower, likely influenced by mining activities, the
recorded species richness underscores the
importance of this area. Similar patterns are
also observed in avifauna (the Wildlife Institute
of India 2016 study recorded 116 species). The
current ongoing study added to the list with a
substantial increase up to 138 bird species from
the Saranda Forest Division. Furthermore,

41

herpetofauna records show a notable increase
from 13 species in the previous study (WII,
2016) to 27 species in the present ongoing
study within the region.
v. It is pertinent to mention that over 70% of the
area in the Saranda Forest Division has intact
forest. Many previous studies and the current
ongoing study have predominantly focused on
the areas with better accessibility and very often
these are under disturbance regime. Despite
considerable anthropogenic pressures, the area
demonstrates resilience and continues to
support a notable diversity of wildlife across
various taxa.
vi. Mouse deer and Nilgai are recorded occasionally
in the Tholkobad beat of the Saranda Forest
Division (Tiwari 2024), indicating the slow
comeback of these species. It is possible that
there could be more species when sampling can
be intensified and there also possibility of
reintroduction or augmentation of locally
extinct species and low population species,
respectively. The ongoing WII study’s
identification of species hotspots in the lower
Koina range, adjacent to the Samta and
Sasangda range, further emphasizes the
ecological significance of these less-explored
parts of the Division.
vii. Given its geographic relationship with the
Simlipal Tiger Reserve (Odisha), the Saranda
Forest Division plays a vital role in regional
conservation. Despite the absence of a resident
tiger population, Saranda is known to facilitate
the dispersal of tigers and other species
between the states (Qureshi et al.. 2022) and
with declaration of wildlife sanctuary
population recovery for species like tiger and
gaur can be accomplished.

42

8.CONCLUSION

In summation, the Saranda Forest Division
within Jharkhand represents a critical ecological
zone facing substantial environmental pressures,
primarily from mining activities. The region’s rich
biodiversity and its importance for species like the
Asiatic elephant, Chousingha, Mouse deer and sloth
bear are under threat, necessitating a balanced
approach that integrates conservation strategies with
sustainable development practices. Hotspots for the
population of Elephant and Four-horned Antelope
are found within and outside the Proposed Saranda
Wildlife Sanctuary and Sasangdaburu Conservation
reserve highlighting the importance of the region
from local and landscape contexts. Hence, the
notification of the proposed wildlife sanctuary and
conservation reserve by the state will be a significant
value addition for protection of biodiversity and
ecological integrity in the local, regional and national
contexts.”

64. It can thus be seen from the report of the WII that it is clear

that the land in question squarely falls within clause (b) of sub-

section (1) of Section 26A of the WP Act.

65. It cannot be disputed that under Article 48A of the

Constitution of India, the State is mandated to protect and improve

the environment and to safeguard the forests and wildlife of the

country.

66. Further, under Article 51A(g) of the Constitution, every

citizen has a duty to protect and improve the natural environment

43

including forests, lakes, rivers and wildlife, and to have compassion

for living creatures.

67. There cannot, therefore, be any dispute that according to

these constitutional commitments and the environmental

jurisprudence, as has developed on account of various judgments

of this Court over the decades, the State is required to recognize

and protect areas of ecological significance, and particularly to

conserve and protect wildlife and its inhabitants. The State has a

positive obligation and a mandate to provide statutory protection to

forests and wildlife and declare ecologically significant areas to be

statutorily protected. Furthermore, upon a perusal of the report of

the WII and also the various affidavits filed by the State itself, it

cannot be disputed that the Saranda Forest require protection as

envisaged under Section 26A of the WP Act.

(iii) NATIONAL FOREST POLICY, 1998 AND NATIONAL
WILDLIFE ACTION PLAN, 2017-31

68. This Court, in the present proceedings on 26th September

200516 recognized that the National Forest Policy, 1988 provides for

the identification of protected areas, recognition of customary rights

16 (2006) 1 SCC 1

44

over forest areas, forest conservation with involvement of the local

community, and the need for regular surveys of forest resources.

69. It will be relevant to refer to some of the features of the

National Forest Policy, 1988 which read thus:

“3.3 For the conservation of total biological diversity,
the network of national parks, sanctuaries biosphere
reserves and other protected areas should be
strengthened and extended adequately.
………..
4.1 Area Under Forests – The national goal should
be to have a minimum of one-third of the total land
area of the country under forest or tree cover. In the
hills and in mountainous regions, the aim should be
to maintain two-third of the area under such cover in
order to prevent erosion and land degradation and to
ensure the stability of the fragile eco-system.
………..
4.4.1 Forest land or land with tree cover should not
be treated merely as a resources readily available to
be utilised for various projects and programmes, nut
as a national asset which requires to be properly
safeguarded for providing sustained benefits to the
entire community. Diversion of forest land for any
non-forest land for any non-forest purpose should be
subject to the most careful examinations by
specialists from the standpoint of social and
environmental costs and benefits. Construction of
dams and reservoirs, mining and industrial
development and expansion of agriculture trees and
forests. Projects which involve such diversion should
at least provide in their investment budget, funds for
regeneration/compensatory afforestation.”

45

70. This Court, again in the case of Centre for Environmental

Law, World Wide Fund-India v. Union of India and Others17

held that the National Wildlife Action Plan, 2017-31 was also having

a statutory flavour.

71. The National Wildlife Action Plan 2017-31 recognises the

need to enhance the protected area network (broadly including

national parks, wildlife sanctuaries, community reserves etc.) and

to demarcate boundaries for protected areas. The National Wildlife

Action Plan 2017-31 further stresses on in situ conservation of

threatened species, and the need for immediate conservation

measures including the protection of critical habitants.

72. We, therefore, have no hesitation in saying that in view of

the mandate of Articles 48A and 51A(g) of the Constitution,

Section 26A of the WP Act and particularly in the light of the report

of the WII, the State cannot run away from its duty to declare the

extent of 31,468.25 hectares as Saranda Wildlife Sanctuary.

(iv) JUSTICE M.B. SHAH COMMISSION REPORT

73. There is another angle from which the matter can be

looked at.

17 (2013) 8 SCC 234

46

74. In pursuance to the 2013 Report of Justice M.B. Shah

Commission of Inquiry on illegal mining of iron and

manganese ores in the State of Jharkhand, the Indian Council

of Forestry Research and Education, Dehradun18 conducted a

study to suggest annual capacity for iron ore production. The

ICFRE submitted its draft final report on 28th March 2016. The

report was examined by a committee constituted on

4th April 2016 by the MoEF&CC. Based on the committee’s

recommendations, the ICFRE report was accepted by the

competent authority in the MoEF&CC. Further, based on

ICFRE’s Report, the MoEF&CC issued the MPSM vide

Office Memorandum dated 8th June 2018.

75. It will be relevant to refer to some of the observations

of the Justice M.B. Shah Commission’s 2013 Report as

summarized in the MPSM. Para 4 thereof reads thus:

“4. It was observed that considering the aforesaid
position and mining operation in dense Saranda
Forest which is admittedly having wildlife and is
one of finest elephant habitats, would be
destroyed without getting further benefit of iron
ore. As such, in the aforesaid area, Sal trees and
associates which were existing are already destroyed
and which has affected the environment. Hence,
capping of production in each mine is a must.”
(Emphasis supplied)

18 Hereinafter “ICFRE”.

47

76. It can thus clearly be seen that the MPSM found that

the area in question is one which has wildlife and it is one of

the finest elephant habitats, however, it is in danger of being

destroyed if mining operations are continued without getting

further benefit of iron ore. The Commission, therefore, noted

that capping of production in each mine is a must.

77. It will also be relevant to refer to the following

paragraphs of the MPSM:

7. In the State of Jharkhand, most of the mines are
in the Saranda forest area which is the finest
elephant habitat and part of Notified Elephant
Reserve and also highly eco– sensitive, as regards
bio–diversity. Most of the mines are very close to the
rivers (i.e. Koena and others) or natural streams and
in many of the cases; streams are either passing
through or quite close by the leased area and
catchments area. The sudden increase in
production would increase the effective area
under mining and result into drying of these
streams, degradation of environment, loss of
micro bio–diversity of these streams, adverse
effect on all roads, agriculture, horticulture,
ground water table, pollution of air and water and
eco–system as a whole. Modifications of mining
plans to increase production without knowing the
real effect on a self-contained Saranda ecosystem
has raised many questions on environment of the
area. It may leave a permanent impact which
would be difficult to rejuvenate the climatic
climax natural forest.
8.The Commission observed that mining leases are
granted, without having any prior consent of the
Forest Department. The proposed lease is a fresh
grant in the virgin forest of a very high tree density

48

and one of the finest elephant habitats. Whether
diversion of one of the best natural virgin forest areas
in the country for a lease of 12 to 13 years life is really
worthy and justified? The natural forest which had
taken millions of years to come to this climatic
climax would be destroyed for a mine of 12 to 13
years life span. A serious thought in this regard
shall be given.
As per the Indian Minerals Yearbook 2013 (Part-
I) 52nd Edition the total iron ore (hematite) deposit
in West Singhbhum district is 2304 MT (proven 1840
MT and probable 464MT). With 60 MTPA extraction
of ore, the ore reserve will last for 40 years.
9.MoEF&CC is formulating parameters to identify
pristine and biologically diverse and rich forest areas
which shall not be diverted for mining projects.
Though the parameters are yet to be finalised and
shall be suggestive in decision making, the report of
the ICFRE on carrying capacity study of Saranda
region and Dr Bist Committee has examined all
aspects of bio diversity conservation in tune with the
concerns of Shah Commission and identified
critical wildlife habitats, corridors linking critical
wildlife habitats, rich forests and such other
important forest areas in Saranda Forest which
needs to be protected and conserved for posterity
and are considered as ecologically important and
may be considered as inviolate for iron ore mining
and may be notified as Conservation Reserve/
Corridors or Ecologically Sensitive Areas in
accordance with the provisions of the Wild Life
(Protection) Act, 1972 and the Environment
(Protection) 1986 respectively by the State
Government.
10.The ICFRE submitted the draft final report on
28.3.2016. The report was examined by a committee
constituted on 4.4.2016 by the MoEF&CC. Based on
the committee’s recommendations, the ICFRE report
was accepted by the MoEF&CC.
11. The process for identifying critical pristine forests
for conservation is in progress and the concept has

49

been used in identifying the forest area which are
critical for wildlife, forest and biodiversity
conservation. As a policy the dense and biodiverse
forest with significant wild flora and fauna
population should not be diverted for mining purpose
especially when sufficient mineral deposits are
available elsewhere for feeding the related industries.
In Saranda and Chaibasa sufficient iron and
manganese ores deposits are available in the
eastern boundary of Saranda forest adjoining
Chaibasa with good forest cover which according
to ICFRE can last for more than 50 to 100 years
and mining may be allowed there with sufficient
safeguards. This area has many operating mines
and has been worked in past also and already
fractured and disturbed the landscape. This area
is adjoining the mining areas of Odisha. The iron
ore complex in Meghahatuburu, Kiriburu,
Baraibury, Gua and Noamundi in Jharkhand and,
Barbil and Joda in Odisha makes contiguous area
for iron and manganese ore mining and may be
developed for sustainable mining with adequate
integrated forest and wildlife management plan.
The entire landscape of eastern Jharkhand and
western Odisha is full of wild elephants and
traditional corridor exists for the movement of
elephants from one habitat to another.
(Emphasis supplied)

78. The Plan, therefore, clearly notes that the sudden

increase in production has dangerous effects resulting into

drying of these streams, degradation of environment, loss of

micro biodiversity of these streams and adverse effect on all

roads, agriculture, horticulture, ground water table, pollution

of air and water and eco–system as a whole. It further states

50

that modifications of mining plans to increase production

without knowing the real effect on a self-contained Saranda

ecosystem may leave a permanent impact which would be

difficult to rejuvenate the climatic climax natural forest.

79. The Plan also expressed concern as to whether the

natural forests which had taken millions of years to come to

this climatic climax can be permitted to be destroyed for a

mine of 12 to 13 years lifespan.

80. It specifically emphasized on identification, protection

and conservation of the critical wildlife habitats, corridors

linking critical wildlife habitats, rich forests and such other

important forest areas in Saranda Forest. It emphasized that

they need to be protected and conserved for posterity and are

considered as ecologically important and may be considered

as inviolate for iron ore mining. Therefore, it was

recommended that these areas in Saranda Forest be notified

as Conservation Reserve/Corridors or Ecologically Sensitive

Areas in accordance with the provisions of the WPA and the

51

Environment (Protection) Act, 198619 respectively by the

State Government.

81. The Commission also observed that in Saranda and

Chaibasa, sufficient iron and manganese ores deposits are

available in the eastern boundary of Saranda forest adjoining

Chaibasa with good forest cover which according to ICFRE can

last for more than 50 to 100 years and mining activities could

be undertaken there with sufficient safeguards. It is further

observed that the area has operating mines and has also been

working in past, which has already fractured and disturbed

the landscape. It is further observed that the iron ore complex

in Meghahatuburu, Kiriburu, Baraibury, Gua and Noamundi

in Jharkhand and Barbil and Joda in Odisha makes

contiguous area for iron and manganese ore mining and may

be developed for sustainable mining with adequate integrated

forest and wildlife management plan. The Commission

recorded that the entire landscape of eastern Jharkhand and

western Odisha is full of wild elephants and traditional

corridor exists for the movement of elephants from one habitat

to another.

19 Hereinafter “EPA”.

52

82. Appendix 1 of the MPSM lists the forest compartments

which shall be conservation areas/no mining zones. It is thus

clear that even another expert body has identified the areas

which shall be conservation areas/no mining zones.

(v) STAND TAKEN BY THE STATE OF JHARKHAND

83. In its latest proposal, the State has sought to exclude

several compartments from the wildlife sanctuary, however,

only 6 out of them (i.e., KP-2, KP-10, KP-11, KP-12, KP-13 and

KP-14) are categorized as either Mining Zone-I or Mining Zone-

II under the MPSM. Even the compartments which are

identified in the MPSM as conservation areas/no-mining

zones (i.e., TK-8, TK-9, T-4, T-5, T-6, T-25 to T-32) have been

sought to be excluded from the wildlife sanctuary.

84. We see no justification in excluding the compartments

which have been notified in the MPSM to be conservation

area/no mining zone from the proposed wildlife sanctuary. We

say so because the MPSM has recommended thus in order to

adhere to the principle of Sustainable Development.

85. This Court has time and again emphasized on the

necessity to strike a balance between environmental

53

protection and the need for development. A reference in this

regard can be made to the following judgments of this Court:

(i) Vellore Citizens’ Welfare Forum v. Union of India

and Others20;

(ii) Intellectuals Forum, Tirupathi v. State of A.P.

and Others21

(iii) State of Himachal Pradesh and Others v.

Yogendera Mohan Sengupta and Another22; and

(iv) T.N. Godavarman Thirumulpad v. Union of India

and Others (In Re: Gaurav Kumar Bansal)23.

86. The main opposition of the State is on the ground that

the rights of the tribals and the traditional forest dwellers

residing in the area proposed to be declared as wildlife

sanctuary would be adversely affected. We find that the said

contention is absolutely without any substance.

87. As already discussed hereinabove, under Section

24(2)(c) of the WPA, the Collector, in consultation with the

Chief Wild Life Warden, is entitled to allow the continuation of

20 (1996) 5 SCC 647
21 (2006) 3 SCC 549
22 (2024) 13 SCC 1
23 (2025) 2 SCC 641

54

any right of any person in or over any land within the limits of

the sanctuary.

88. In this respect, it will also be relevant to refer to the

FRA. The Preamble of the FRA reads thus:

“An Act to recognise and vest the forest rights and
occupation in forest land in forest dwelling
Scheduled Tribes and other traditional forest
dwellers who have been residing in such forests for
generations but whose rights could not be recorded;
to provide for a framework for recording the forest
rights so vested and the nature of evidence required
for such recognition and vesting in respect of forest
land
Whereas the recognised rights of the forest dwelling
Scheduled Tribes and other traditional forest
dwellers include the responsibilities and authority for
sustainable use, conservation of biodiversity and
maintenance of ecological balance and thereby
strengthening the conservation regime of the forests
while ensuring livelihood and food security of the
forest dwelling Scheduled Tribes and other
traditional forest dwellers;
And whereas the forest rights on ancestral lands and
their habitat were not adequately recognised in the
consolidation of State forests during the colonial
period as well as in independent India resulting in
historical injustice to the forest dwelling Scheduled
Tribes and other traditional forest dwellers who are
integral to the very survival and sustainability of the
forest ecosystem;
And whereas it has become necessary to address the
long standing insecurity of tenurial and access rights
of forest dwelling Scheduled Tribes and other
traditional forest dwellers including those who were
forced to relocate their dwelling due to State
development interventions….”

55

89. It will also be relevant to refer to Section 3 of the FRA

which reads thus:

“3. Forest rights of forest dwelling Scheduled
Tribes and other traditional forest dwellers.—(1)
For the purposes of this Act, the following rights,
which secure individual or community tenure or
both, shall be the forest rights of forest dwelling
Scheduled Tribes and other traditional forest
dwellers on all forest lands, namely:—
(a) right to hold and live in the forest land
under the individual or common
occupation for habitation or for self
cultivation for livelihood by a member or
members of a forest dwelling Scheduled
Tribe or other traditional forest dwellers;
(b) community rights such as nistar, by
whatever name called, including those
used in erstwhile Princely States,
Zamindari or such intermediary regimes;
(c) right of ownership access to collect,
use, and dispose of minor forest produce
which has been traditionally collected
within or outside village boundaries;
(d) other community rights of uses or
entitlements such as fish and other
products of water bodies, grazing (both
settled or transhumant) and traditional
seasonal resource access of nomadic or
pastoralist communities;
(e) rights, including community tenures of
habitat and habitation for primitive tribal
groups and pre-agricultural communities;
(f) rights in or over disputed lands under
any nomenclature in any State where
claims are disputed;
(g) rights for conversion of Pattas or leases
or grants issued by any local authority or

56

any State Government on forest lands to
titles;
(h) rights of settlement and conversion of
all forest villages, old habitation,
unsurveyed villages and other villages in
forests, whether recorded, notified, or not,
into revenue villages;
(i) right to protect, regenerate or conserve
or manage any community forest resource
which they have been traditionally
protecting and conserving for sustainable
use;
(j) rights which are recognised under any
State law or laws of any Autonomous
District Council or Autonomous Regional
Council or which are accepted as rights of
tribals under any traditional or customary
law of the concerned tribes of any State;
(k) right of access to biodiversity and
community right to intellectual property
and traditional knowledge related to
biodiversity and cultural diversity;
(l) any other traditional right customarily
enjoyed by the forest dwelling Scheduled
Tribes or other traditional forest dwellers,
as the case may be, which are not
mentioned in clauses (a) to (k) but
excluding the traditional right of hunting
or trapping or extracting a part of the body
of any species of wild animal;
(m) right to in situ rehabilitation including
alternative land in cases where the
Scheduled Tribes and other traditional
forest dwellers have been illegally evicted
or displaced from forest land of any
description without receiving their legal
entitlement to rehabilitation prior to the
13th day of December, 2005.

57

(2) Notwithstanding anything contained in the Forest
(Conservation) Act, 1980 (69 of 1980), the Central
Government shall provide for diversion of forest land
for the following facilities managed by the
Government which involve felling of trees not
exceeding seventy-five trees per hectare, namely:—
(a) schools;
(b) dispensary or hospital;
(c) anganwadis;
(d) fair price shops;
(e) electric and telecommunication lines;
(f) tanks and other minor water bodies;
(g) drinking water supply and water
pipelines;
(h) water or rain water harvesting
structures;
(i) minor irrigation canals;
(j) non-conventional source of energy;
(k) skill upgradation or vocational training
centres;
(l) roads; and
(m) community centres:
Provided that such diversion of forest land shall be
allowed only if,—
(i) the forest land to be diverted for the
purposes mentioned in this sub-section is
less than one hectare in each case; and
(ii) the clearance of such development
projects shall be subject to the condition
that the same is recommended by the
Gram Sabha.”

90. It can thus be seen that none of the rights about which

the State has expressed its concerns, through its application

58

for modification of order of this court dated 8th October 2025,

would at all be disturbed for either an individual or for the

community as a whole.

91. It will also be relevant to refer to sub-Section (1) of

Section 4 of the FRA which reads as under:

“4. Recognition of, and vesting of, forest rights in
forest dwelling Scheduled Tribes and other
traditional forest dwellers.—(1) Notwithstanding
anything contained in any other law for the time
being in force, and subject to the provisions of this
Act, the Central Government hereby recognises and
vests forest rights in—
(a) the forest dwelling Scheduled Tribes in
States or areas in States where they are
declared as Scheduled Tribes in respect of
all forest rights mentioned in Section 3;
(b) the other traditional forest dwellers in
respect of all forest rights mentioned in
Section 3.”

92. It can thus be seen that sub-Section (1) of Section 4

of the FRA which begins with a non-obstante clause recognizes

and vests forest rights in the forest dwelling Scheduled Tribes

and also the other traditional forest dwellers. Under sub-

Section (2) thereof, even if any modification of forest rights or

resettlement in critical wildlife habitats of national parks or

wildlife sanctuaries for creating inviolate areas for wildlife

59

conservation recognized under the said Act has to be done,

very stringent provisions have been made.

93. Therefore, we are of the considered view that the

provisions contained in Section 24(2)(c) of the WPA and

Section 3 read with Section 4(1) of the FRA amply protect the

rights of the tribals and forest dwellers even after declaration

of the said area as a wildlife sanctuary.

94. The bogey that on declaration of wildlife sanctuary, the

habitations and rights of the tribals and traditional forest

dwellers will be lost and vital public infrastructures like

educational institutions, roads, etc., will have to be

demolished is only a figment of imagination of the State.

Rather than taking such a stand before this court, we are of

the considered view that the State should have educated the

tribals/forest dwellers residing in the said areas about the

rights available to them under the FRA as well as the WPA.

95. Further, in order to allay the apprehension of the State

with regard to any protest or resistance from the tribals and

forest dwellers, we are of the view that the same would be

taken care of in view of the directions that we propose to issue

hereinafter.

60

96. As already discussed hereinabove, Section 3 of FRA

protects the individual rights as well as the rights of the

community pertaining to habitat and habitation, conversion

of leases or grants, the right to live on forest lands, as well as

in situ rehabilitation. Further, the diversion of forest lands is

permitted under sub-Section (2) of Section 3 of the FRA for

any of the purposes stated therein. In that view of the matter,

we find that the contention of the State that it has reduced the

area of 31,468.25 hectare to 24,941.64 hectare taking into

consideration the protection of the rights of the tribals and

forest dwellers is without any substance.

97. It will also be relevant to refer to the following

observations made by this court in the case of Orissa Mining

Corporation Limited v. Ministry of Environment and

Forests and others24:

“55. The definition clauses read with the
abovementioned provisions give emphasis to
customary rights, rights to collect, use and dispose
of minor forest produce, community rights like
grazing cattle, community tenure of habitat and
habitation for primitive tribal groups, traditional
rights customarily enjoyed, etc. Legislative intention
is, therefore, clear that the Act intends to protect
custom, usage, forms, practices and ceremonies
which are appropriate to the traditional practices of

24 (2013) 6 SCC 476

61

forest dwellers.”

98. It is further to be noted that for the effective

implementation of the Act, the Ministry of Tribal Affairs has

issued certain guidelines and communicated the same to all

the States and the Union Territories vide its letter dated 12th

July 2012. The said guidelines have already been reproduced

in the judgment of this court in the case of Orissa Mining

(supra), therefore, we avoid reproduction of the same in the

present judgment.

99. Even in the 2006 judgment in the present proceedings

(supra), this court has recognized the importance of protecting

and safeguarding community rights in various laws. It will be

relevant to refer to some of the observations of this Court:

“73. It has been recognised that one of the essentials
for forest management is the conservation of total
biological diversity, the network of national parks,
sanctuaries, biosphere reserves and other protected
areas to be strengthened and extended adequately.
74. The strategy under the Forest Policy is to have a
minimum of one-third of the total land area of the
country under forest or tree cover. In the hills and in
mountainous regions, the aim should be to maintain
two-thirds of the area under such cover in order to
prevent erosion and land degradation and to ensure
the stability of the fragile ecosystem. Clause 4.3 lays
down the aspects of management of State forests. It
would be instructive to reproduce hereunder certain
parts of the policy with a view to have clarity in the

62

aim to be achieved:
“4.3.1. Schemes and projects which
interfere with forests that clothe steep
slopes, catchments of rivers, lakes, and
reservoirs, geologically unstable terrain
and such other ecologically sensitive areas
should be severely restricted. Tropical
rain/moist forest, particularly in areas like
Arunachal Pradesh, Kerala, Andaman and
Nicobar Islands should be totally
safeguarded.
4.3.2. No forest should be permitted to be
worked without the Government having
approved the management plan, which
should be in a prescribed format and in
keeping with the National Forest Policy.
The Central Government should issue
necessary guidelines to the State
Government in this regard and monitor
compliance.
***
4.4.1. Forest land or land with tree cover
should not be treated merely as a resource
readily available to be utilised for various
projects and programmes, but as a
national asset which requires to be
properly safeguarded for providing
sustained benefits to the entire
community. Diversion of forest land for
any non-forest purpose should be subject
to the most careful examinations by
specialists from the standpoint of social
and environmental costs and benefits.
Construction of dams and reservoirs,
mining and industrial development and
expansion of agriculture should be
consistent with the need for conservation
of trees and forests. Projects which involve
such diversion should at least provide in
their investment budget, funds for
regeneration/compensatory afforestation.

63

4.4.2. Beneficiaries who are allowed
mining and quarrying in forest land and in
land covered by trees should be required
to repair and revegetate the area in
accordance with established forestry
practice. No mining lease should be
granted to any party, private or public,
without a proper mine management plan
appraised from the environmental angle
and enforced by adequate machinery.
***
4.6. Having regard to the symbiotic
relationship between the tribal people and
forests, a primary task of all agencies
responsible for forest management,
including the forest development
corporations should be to associate the
tribal people closely in the protection,
regeneration and development of forests
as well as to provide gainful employment
to people living in and around the forest.
While safeguarding the customary rights
and interests of such people, forestry
programmes should pay special attention
to the following—
— one of the major causes for
degradation of forest is illegal cutting and
removal by contractors and their labour.
In order to put an end to this practice,
contractors should be replaced by
institutions such as tribal cooperatives,
labour cooperatives, government
corporations, etc. as early as possible;
— protection, regeneration and optimum
collection of minor forest produce along
with institutional arrangements for the
marketing of such produce;
— development of forest villages on a par
with revenue villages;
— family-oriented schemes for improving

64

the status of the tribal beneficiaries; and
— undertaking integrated area
development programmes to meet the
needs of the tribal economy in and
around the forest areas, including the
provision of alternative sources of
domestic energy on a subsidised basis, to
reduce pressure on the existing forest
areas.
***
4.8.1. Encroachment on forest lands has been on the
increase. This trend has to be arrested and effective
action taken to prevent its continuance. There should
be no regularisation of existing encroachments.
***
4.9. The main considerations governing the
establishment of forest-based industries and supply
of raw material to them should be as follows:
— As far as possible, a forest-based
industry should raise the raw material
needed for meeting its own requirements,
preferably by establishment of direct
relationship between the factory and the
individuals who can grow the raw material
by supporting the individuals with inputs
including credit, constant technical advice
and finally harvesting and transport
services.
— No forest-based enterprise, except that
at the village or cottage level, should be
permitted in the future unless it has been
first cleared after a careful scrutiny with
regard to assured availability of raw
material. In any case, the fuel, fodder and
timber requirements of the local
population should not be sacrificed for
this purpose.
— Forest-based industries must not only
provide employment to local people on a

65

priority but also involve them fully in
raising trees and raw material.
— Natural forests serve as gene pool
resources and help to maintain ecological
balance. Such forests will not, therefore,
be made available to industries for
undertaking plantation and for any other
activities.
— Farmers, particularly small and
marginal farmers would be encouraged to
grow, on marginal/degraded lands
available with them, wood species
required for industries. These may also be
grown along with fuel and fodder species
on community lands not required for
pasture purposes, and by the Forest
Department/corporations on degraded
forests, not earmarked for natural
regeneration.
— The practice of supply of forest produce
to industry at concessional prices should
cease. Industry should be encouraged to
use alternative raw materials. Import of
wood and wood products should be
liberalised.
— The above considerations will, however,
be subject to the current policy relating to
land ceiling and land laws.
***
4.16. The objective of this revised policy cannot be
achieved without the investment of financial and
other resources on a substantial scale. Such
investment is indeed fully justified considering the
contribution of forests in maintaining essential
ecological processes and life support systems and in
preserving genetic diversity. Forest should not be
looked upon as a source of revenue. Forests are a
renewable natural resource. They are a national
asset to be protected and enhanced for the well-being
of the people and the nation.”

66

100. In the totality of circumstances, we find that the State

has been changing its stand time and again. Earlier, it had

clearly admitted that in 126 compartments which were

notified as the Saranda Game Sanctuary vide 1968

Notification, neither any kind of mining excavation operations

nor any diversion of Forest Land for mining purposes have

been undertaken except in part of the area approximately

measuring 4.31 hectares. Subsequently, the stand had been

changed wherein the State submitted that it is considering

declaration of area measuring 57,519.41 hectare as against

the original area measuring 31,468.25 hectare as a wildlife

sanctuary. This stand was, yet again, changed and finally the

State now proposes to notify only an area of 24,941.64 hectare

as wildlife sanctuary.

101. We see no reason as to why the entire area of 126

compartments notified under 1968 notification should not be

declared as wildlife sanctuary. However, taking into

consideration the MPSM which excluded compartment

numbers KP-2, KP-10, KP-11, KP-12, KP-13 and KP-14 as

either Mining Zone-I or Mining Zone-II, we are inclined to

67

permit the State to exclude the aforesaid six compartments

from the area to be notified as wildlife sanctuary.

IV. CONCLUSION AND DIRECTIONS

102. In the result, we dispose of the present set of IAs in the

following terms:

(i) We direct that the State Government shall notify the

area comprising of 126 compartments as notified in

1968 notification, excluding six compartments i.e.,

compartment numbers KP-2, KP-10, KP-11, KP-12,

KP-13 and KP-14, as a wildlife sanctuary within a

period of three months from the date of this judgment.

(ii) We reiterate the directions issued by this Court vide

judgment and order dated 26th April 202325 passed in

the present proceedings which reads thus:

“60. Insofar as the restriction on mining is
concerned, we are of the considered view
that it has been the consistent view of this
Court that the mining activities within an
area of one kilometre of the boundary of the
Protected Areas will be hazardous for the
wildlife. Though in the case of Goa
Foundation (supra), the said directions were
issued in respect of State of Goa, we find
that such directions need to be issued on
Pan-India basis.

25 2023 SCC OnLine SC 504

68

xxxx xxxx xxxx
65. We also modify the direction contained
in paragraph 56.4 of the order dated
3rd June 2022 (supra) and direct that
mining within the National Park and
Wildlife Sanctuary and within an area of
one kilometre from the boundary of such
National Park and Wildlife Sanctuary shall
not be permissible.”

(iii) We further direct the State of Jharkhand to give wide

publicity to the fact that by this judgment, neither the

individual rights nor the community rights of the

tribals and the forest dwellers in the said area would

be adversely affected. The State shall also give wide

publicity to the fact that in view of the provision of

Section 3 read with sub-Section (1) of Section 4 of the

FRA all the rights of the tribals and the forest dwellers

both individually as well as of community shall stand

protected.

IA Diary No.272221 of 2025

103. The present IA is filed with the following prayers:

A. Direct that the declaration of the proposed
Saranda Wildlife Sanctuary covering 24,941.68
hectares and its 1 km Eco-Sensitive Zone (ESZ)
shall not in any manner impede, restrict, or
otherwise affect the operation, maintenance, and
functioning of the Applicant’s essential ancillary
infrastructure like Rangring tailing Dam, which

69

are indispensable for sustaining lawful mining
operations and township activities namely:
a. Kumbdi Water Dam and allied facilities
located partly in Compartments KP-15,
KD-10 and KD-16 as mentioned in
Paragraph 3 and detailed in Annexure-3,
and
b. Railway Take-up Point and railway lines
passing through Kiriburu-
Meghahatuburu mines Compartments
KP-21 as mentioned Paragraph 3 and
detailed in Annexure A-4, and
B. to pass such other or further order or orders as
this Hon’ble Court may deem fit and proper in the
interest of justice and equity.”

104. In the foregoing paragraphs, we have already held that

in view of the provisions contained in Sections 3 and 4 of the

FRA, the activities as prayed in the IA are permissible

activities. Even after the declaration of the area covered under

the 1968 Notification as a Wildlife Sanctuary, ancillary

activities as sought to be carried out by the Applicant-SAIL

would be continued to be permitted.

105. We, therefore, find that in view of the observations

made hereinabove, the grievance of the applicant-SAIL no

more survives. The IA is, therefore, disposed of in terms of the

observations made in this judgment.

70

106. Before we part with the Judgment, we would like to

place on record our deep and sincere appreciation for the

tireless efforts put in by Shri K. Parameshwar learned amicus

curiae, who has been ably assisted by Mr. M.V. Mukunda,

Ms. Kanti, Ms. Raji Gururaj, Ms. Veda Singh, Mr. Shreenivas

Patil, Mr. Prasad Hegde, Mr. Sai Kaushal, learned counsel.

We would also like to place on record our appreciation for

Shri Kapil Sibal, learned Senior Counsel appearing on behalf

of the State of Jharkhand, Shri Tushar Mehta, learned

Solicitor General of India appearing for Steel Authority of India

Limited and Ms. Shibani Ghosh,

learned counsel appearing on behalf of the applicant-Dr.

Dayanand Shankar Srivastava.

…………………………CJI
(B.R. GAVAI)

……………………………………..J
(K. VINOD CHANDRAN)

NEW DELHI;
NOVEMBER 13, 2025.

71

==================== NEXT DOCUMENT (same Neutral Citation) ====================

2025 INSC 1306 REPORTABLE

IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION

IN RE : DELHI RIDGE

I.A. NO. 117204 OF 2024
(CEC REPORT No. 5 of 2024)
in
WRIT PETITION (C) NO. 202 OF 1995
and
Issue regarding order dated 16th April 2025
passed in Writ Petition (c) No. 4677 of 1985

T. N. Godavarman Thirumulpad … Petitioner

versus

Union of India & Others … Respondents

Table of Contents

INTRODUCTION ……………………………………………………2
History of the Delhi Ridge …………………………………………….. 3
Importance of the Ridge ……………………………………………….. 6
Morphological Ridge…………………………………………………….. 7
History of DRMB ……………………………………………………….. 12
Working of the DRMB ………………………………………………… 14
Signature Not Verified

Digitally signed by
NARENDRA PRASAD

Multiple Authorities Supervising Ridge …………………………. 16
Date: 2025.11.11
16:51:34 IST
Reason:

Page 1 of 39
Writ Petition (C) No. 202 of 1995

DISCUSSION AND ANALYSIS …………………………………….21
Status of Final Notification under Section 20 …………………. 22
Removal of Encroachments …………………………………………. 23
Identification of the Morphological Ridge……………………….. 23
Reconstitution of the DRMB………………………………………… 24
Statutory Backing of DRMB ………………………………………… 25
Representative of CEC in DRMB ………………………………….. 30
Standing Committee for DRMB ……………………………………. 31
Functions of the DRMB ……………………………………………… 33
CONCLUSION AND DIRECTIONS ……………………………..35

JUDGMENT
B.R. GAVAI, CJI

INTRODUCTION

1. In the present matter, we are called upon to adjudicate on

the issue concerning the various bodies/authorities monitoring,

regulating and permitting construction activities in the Delhi

Ridge which is an area of vital ecological and geographical

significance in the National Capital Territory1. The Delhi Ridge

which is at the tail end of the Aravali Ranges, contains a variety

of flora and fauna and is widely known as the “Green Lungs” of

the city.

1 For short, “the NCT”.

Page 2 of 39
Writ Petition (C) No. 202 of 1995

History of the Delhi Ridge

2. The Aravali Range in the NCT of Delhi comprises of the

rocky outcrop stretching from the Delhi University in the North

to the NCT Border in the South and beyond, with sizable areas

of the same having been designated as the Ridge. However, the

Ridge, as it stands today, is not a continuum as various

intervening stretches have been urbanized with the passage of

time. For example, the Central Ridge area was planned as an

integral part of capital city of New Delhi in the early part of the

twentieth century.

3. The Master Plan for Delhi, 2001 notified on 1st August 1990

identifies the Delhi Ridge as an area admeasuring 7,777

hectares of land, which is divided in four zones, i.e., Northern,

Central, South Central (Mehrauli) and Southern. Over the time,

due to deterioration in the Ridge area, the Lieutenant Governor

of Delhi constituted a 10-member committee known as the

“Lovraj Committee” for preparing a management plan of the

Ridge. The said committee inter alia suggested the creation of a

Ridge Management Supervisory Committee chaired by the Chief

Secretary of Delhi to address land-related legal matters. It was

Page 3 of 39
Writ Petition (C) No. 202 of 1995

suggested that the entire Ridge area be notified as “Reserved

Forest” under the Indian Forest Act, 19272

4. Pursuant to the Lovraj Committee’s Report, a preliminary

notification under Section 4 of the Forest Act was issued on 24th

May 1994 thereby declaring 7,777 hectares of land as Reserved

Forests. The Additional District Magistrate (Revenue)3 was

appointed to be the Forest Settlement Officer under the said

notification. Though a period of more than three decades has

passed, no further proclamation under Section 6 of the Forest

Act has been issued thus far. Since then, only an area to the

extent of 103.48 hectares has been notified as Reserved Forests

under Section 20 of the Forest Act.

5. One more notification under Section 4 of the Forest Act was

also issued on 19th March 1996 for an extent of 7 hectares in

Nanakpura Ridge. A notification dated 2nd April 1996, under

Section 154 of the Delhi Land Reforms Act, 19544 was issued in

compliance with the orders dated 25th January 1996 and 13th

March, 1996 passed by this court in IA No. 18 and 22 in the case

2 Hereinafter referred to as, “the Forest Act”.
3 For short, “ADM (Revenue)”.
4 Hereinafter referred to as, “the Land Reforms Act”.

Page 4 of 39
Writ Petition (C) No. 202 of 1995

of MC Mehta v. Union of India5. The proviso to Section 154 of

the Land Reforms Act concerns uncultivable areas in the Gaon

Sabha which may be excluded from vesting in the Gaon Sabha.

In compliance with the orders of this court, the excess land

measuring 4206.68 hectares from 14 different villages was

placed at the disposal of the Forest Department. This area had

already been identified in the Master Plan which was notified on

1st August 1990.

6. The entire identified portions of the Delhi Ridge are as

under:

Southern Ridge 6,200 hectares
Northern Ridge 87 hectares
South Central Ridge 626 hectares
(Mehrauli)
Central Ridge 864 hectares
Nanakpura Ridge 7 hectares
Total 7,784 hectares

7. As already stated hereinabove, though the total identified

area was 7,784 hectares, the final notification under Section 20 of

the Forest Act has been issued only in respect of 103.48 hectares

of land.

5 Writ Petition (C) No. 4677 of 1985.

Page 5 of 39
Writ Petition (C) No. 202 of 1995

8. The Central Empowered Committee6 submitted a Report on

8th May 2024 stating therein that 5% of the Ridge area is under

encroachment, 4% has been diverted and only 1.33% has been

notified under Section 20. The CEC thus recommended that “it is

crucial to comprehensively address all relevant issues by

thoroughly considering every aspect that directly or indirectly

impacts the Ridge.”

Importance of the Ridge

9. This court has continuously been reiterating the importance

of Delhi Ridge. The Master Plan notified on 1st August 1990 also

stressed on the protection of the Ridge, while this court by order

dated 9th May 1996 in M.C.Mehta5 noted that the Ridge is required

to be protected in all its pristine glory.

10. It will be relevant to refer to the following observations made

by this court vide aforesaid order dated 9th May 1996:

“The provisions of the Master Plan makes it
mandatory that the Ridge is to be kept free
from encroachers and its pristine glory must
be maintained for all times. It is a pity that
neither the Central Government nor the NCT
Delhi Administration has ever applied its
mind towards maintain the Ridge and River
Yamuna which is necessary to maintain the
ecological balance of the city.”

6 For short ‘the CEC’

Page 6 of 39
Writ Petition (C) No. 202 of 1995

Morphological Ridge

11. Through the years, it has also been noticed that though some

parts of the NCT of Delhi have all the features of the Ridge, they

were not identified as the “Ridge”. In this respect, it will be relevant

to note that when the geological and geomorphological mapping of

1,482 sq. km area of the NCT of Delhi was carried out by the

Geological Survey of India7, it was found that a large area ought to

be included as “residual hills/ridges”. These landforms were found

to have rocky surface and characteristics similar to the Ridge. It

will also be relevant to note that even though these areas are now

identified to be ridge-like, they do not form part of the Ridge areas

under the Master Plan, 2001 or Master Plan, 2021. This area is

now known as the “Morphological Ridge”.

12. It is relevant to note that the High Court of Delhi vide an

order dated 30th November 2011 passed in Ashok Kumar

Tanwar v. Union of India and others8, for the first time held

that areas having characteristics of a “Geological Ridge” though

falling outside the Notified Forest Ridge Land also require

protection. The Delhi High Court in the said case was dealing with

7 For short, “the GSI”.
8 2011 SCC OnLine Del 5733

Page 7 of 39
Writ Petition (C) No. 202 of 1995

a writ petition against the construction by the Border Roads

Organization in the Morphological Ridge. The High Court noted

that permission of the Delhi Ridge Management Board9 or this

court, through the CEC, was required for such a construction. It

will be relevant to refer to the following observations made by the

Delhi High Court in Ashok Kumar (supra)8:

“4. It is clear from the aforesaid that the
area in question is given the character of a
“Geological Ridge” though falling outside
the Notified Forest Ridge Land. Even in
respect of such a land, clearance from the
Ridge Management Board or the Hon’ble
Supreme Court through the Central
Empowered Committed is to be obtained
before carrying out any construction. Such
permission is a pre-requisite prerequisite in
view of the directions of the Supreme Court.
It is also mentioned that for laying of Metro
Lines and NHAI for upgradation of NH-236
in the said area, DMRC and NHAI had taken
permission of the Ridge Management Board
in the non-forest land having morphological
features of the Ridge. Admittedly, no such
permission is sought by the BRO.
xxxx xxxx xxxx
7. In these circumstances, we restrain the
BRO from carrying out any further
construction works on the land aforesaid
till it obtains necessary clearance from the
Ridge Management Board or the Hon’ble
Supreme Court through the Central
Empowered Committee.”

9 Hereinafter referred to as “the DRMB” or alternatively as “the Board”.

Page 8 of 39
Writ Petition (C) No. 202 of 1995

13. This court also had an occasion to consider the validity of the

above order passed by the Delhi High Court in the case of Delhi

Development Authority v. Kenneth Builders & Developers (P)

Ltd10. This court in the said case directed the CEC to investigate

the matter of allotment of lands by the Delhi Development

Authority11 in the Morphological Ridge areas. The CEC submitted

its Report dated 18th November 2015 to this court thereby

recommending that construction on the Morphological Ridge area

must be undertaken only after obtaining the clearance from the

DRMB and after obtaining the permission of this court. It will be

relevant to refer to the following observations of this court:

“22. …..However, a decision was rendered
by the Delhi High Court in a case filed by
Ashok Kumar Tanwar [WP (C) No. 3339 of
2011 decided on 30-11-2011 [Ashok
Kumar Tanwar v. Union of India, WP (C)
No. 3339 of 2011, decided on 30-11-2011
(Del)] ] to the effect that a development
project on land outside the notified Ridge
area but having morphological features
conforming to the Ridge would also require
clearance from the Ridge Management
Board and this Court. Therefore, as far as
the present case is concerned though the
project land falls outside the Ridge but has
morphological features conforming to the
Ridge bringing it within the extended

10 (2016) 13 SCC 561
11 For short, “DDA”.

Page 9 of 39
Writ Petition (C) No. 202 of 1995

Ridge, the project of DDA involving non-
forestry use of the land could be permitted
only after obtaining clearance from the
Ridge Management Board and after
obtaining the permission of this Court..…”

14. Thereafter, this court has on various occasions considered

the issue with regard to definition and legal sanctity of the

“Morphological Ridge”. When the Directorate of Revenue

Intelligence12 was allotted land in the Morphological Ridge, this

court directed the CEC to examine the issue. The CEC submitted

its Report dated 1st December 2022 thereby recommending that

the project be undertaken only after 5% of the project cost is

deposited in the DRMB Fund. The DDA submitted its reply dated

6th February 2023 stating that the “Morphological Ridge” is

without sanction of law and that the DDA cannot be made liable

to pay. It was further the contention of the DDA that since the

Forest Department has never defined the “Morphological Ridge”

nor has quantified it, there cannot be any legal impediment

against the DDA allotting lands in these areas. This court by an

order dated 8th February 2023 passed in T.N.Godavarman

Thirumulpad v. Union of India and others13 allowed the

12 For short, “DRI”.
13 2023 SCC OnLine SC 1951

Page 10 of 39
Writ Petition (C) No. 202 of 1995

construction by the DRI subject to the terms and conditions as set

out by the CEC in its report. Pertinently, this court found that the

“Morphological Ridge” needs to be identified and, in that respect

appointed a committee for the said purpose. It will be relevant to

note the following observations of this court in the order dated

8th February 2023:

“13. The High Court of Delhi vide order
dated 30.11.2011 in Writ Petition No.
3339/2011 (Ashok Kumar Tanwar v. Union
of India1,) and this Court in DDA v. Kenneth
Builders & Developers (P) Ltd.2 [(2016) 13
SCC 561] has held that land falling outside
the demarcation of notified ridge but having
similar ‘morphological features’ of ridge
should be given same protection as is given
to the notified areas and no construction
should be permitted thereon. It cannot be
doubted that the ridge in Delhi acts as a
lung, which supplies oxygen to the citizens
of Delhi. The necessity to protect the ridge,
therefore, cannot be undermined.
14. It appears that there has been some
difficulty in identifying the areas of ridge,
which are not notified but also have the
same features.
15. We, therefore, find it appropriate that
the Ministry of Environment, Forest and
Climate Change (MoEFCC), appoints a
Committee consisting of the following
officials/officers, to work out the modalities
for identifying the said area which has
similar ‘morphological features’ as that of a
notified ridge and which needs to be
protected as a notified ridge…”

Page 11 of 39
Writ Petition (C) No. 202 of 1995

History of DRMB

15. The DRMB was constituted pursuant to an order dated

29th September 1995 passed by this court in the case of M.C.

Mehta v. Union of India and Others14 making it the primary

authority for the conservation, protection and preservation of the

Ridge.

16. It will be relevant to refer to the following observations made

by this court in the order dated 29th September 1995:

“Pursuant to this Court’s order dated
September 1, 1995, affidavits have been filed
by Mr. DS Negi, Secretary Environment,
Government of Delhi; Mr. DN Sapolia,
Deputy Commisioner, Govt of Delhi, Mr. BM
Nimesh, L&DO, Ministry of Urban
Development and Mr. DP Singh, Director
(Horticulture), MCD. The contents of these
affidavits have been discussed with the
learned counsel for the parties. Mr. Altaf
Ahmad, learned Addl. Solicitor General
stated before us on September 1, 1995 that
the Lt. Governor had already taken a
decision to constitute a Ridge Management
Board. Mr Altaf Ahmad states that the
orders in this respect are likely to be issued
by the Lt. Governor shortly. Mr. Altaf Ahmad
may place a copy of the order constituting
the Board before this Court on the next date
of hearing. The name of the conservators as
members of the said Board may also be
indicated.”

14 Writ Petition (C) No. 4677 of 1985

Page 12 of 39
Writ Petition (C) No. 202 of 1995

17. By a Government Order dated 6th October 1995, the

Lieutenant Governor of Delhi constituted the DRMB, with the

following members:

i. Chief Secretary, Delhi
ii. Vice Chairman, DDA
iii. Secretary, Env. & Forests, Delhi
iv. Finance Secretary, Delhi
v. Representative of Indian Society of Environmental
Management (NGO)
vi. Representative of Prakarti – Centre for Environmental
Protection & Development (NGO)
vii. Conservator of Forests, Delhi (Member and Chief Executive)
viii. Dy Conservator of Forests, Delhi

18. The membership and functions of the DRMB were amended

from time to time. Vide Notifications dated 06th October 1995, 30th

April 2013, 3rd July 2017 and 1st March 2021 the Board was

reconstituted time and again.

19. The functions of the DRMB, at present, are as under:

i. Execution of the management scheme for the
Ridge Forests as the green lungs of Delhi;
ii. Protection of the boundary and boundary fences
of the Ridge;
iii. Preparation and execution of detailed plans for
upgradation of the Ridge in accordance with
sound silvicultural practices applicable to city
forests and natural resources;
iv. Control of usage by the public of such areas of
the Ridge Forests as may be declared as “open”
by the Board;

Page 13 of 39
Writ Petition (C) No. 202 of 1995

v. Ensuring that there are no encroachments in
excess of the areas allotted to the lawful allottees
till they are shifted from the Ridge Forests under
appropriate orders;
vi. Any other functions ancillary to the above
purposes.
vii. The Board may coopt for any of its meetings not
more than two persons having special
knowledge of forestry, regional ecology, nature
conservation and related subjects.

20. It is pertinent to note that though there have been a number

of notifications for the constitution of the DRMB, none of them

trace their authority to the Environment (Protection) Act, 198615 or

any other statute. As such, the constitution of the DRMB is only

pursuant to the orders passed by this court and without any

statutory backing.

Working of the DRMB

21. In view of the order dated 7th September 2007 passed by this

court in T.N.Godavarman v. Union of India and others16, all

diversion of forest land is to be preceded by the permission of the

DRMB and also of this court. Such permissions have been granted

subject to deposit of 5% of the estimated project cost with the

DRMB.

15 Hereinafter referred to as, “the EP Act”.
16 (2013) 8 SCC 200

Page 14 of 39
Writ Petition (C) No. 202 of 1995

22. This court has passed orders from time to time thereby

permitting certain activities in the Ridge Areas/Extended Ridge

Areas. A gist of the orders is as follows:

a) 7th September 2007- For construction of bridge over the Neela
Hauz water body;
b) 7th December 2007- For construction of Express Metro Link to
the Airport;
c) 17th October 2008-For renovation, upgradation and new
construction of Dr.Karni Singh Shooting Range, Tughlakabad,
Delhi;
d) 18th November 2011- Permission to DMRC;
e) 2nd November 2012- For the construction of transit, training
and other infrastructure facilities for the personnel of Border
Road Organization;
f) 21st October 2013- For underground tunnelling activity for
construction of line 7 corridor in Phase-III of Mass Rapid
Transport System project;
g) 10th May 2016- For construction of staff quarters near Naraina
Village;
h) 10th November 2016- For construction of a project to
Jawaharlal Nehru University;
i) 05th February 2018- For engineered landfill at Tehkhand
Okhla on 47.346 acres of land. However, the Court made it
clear that for future landfill sites the concerned agencies shall
not be allowed to be located in Delhi Ridge area/Ridge
Forest/Morphological Ridge area;
j) 22nd March 2018- Permission to NHAI for widening of National
Highway and improvement of T-Junction near Dhaula Kuan
Metro Station;

Page 15 of 39
Writ Petition (C) No. 202 of 1995

k) 10th April 2018- Permission to Delhi Jal Board for laying of
water pipeline;
l) 29th August 2018- For construction of CBI Housing Complex;
m) 26th September 2018- Permission for construction of Flyover
and Underpass between Mahipalpur Bypass Road and Airport
Road;
n) 8th April 2019- For Referral and Research Army Hospital,
Ministry of Defence;
o) 4th November 2019- Permission to BSES Rajdhani Power Ltd.
for laying the underground cables; and
p) 29th November 2021- Phase IV of Mass Rapid Transportation
Systems Project.

Multiple Authorities Supervising the Ridge

23. Apart from the DRMB, several other authorities have also

been examining the issues pertaining to the Ridge. For instance,

one Sonya Ghosh approached the National Green Tribunal17 by

way of an OA bearing No. 58/2013 (Sonya Ghosh v. Government

of NCT of Delhi and others18) seeking notification of the Ridge

under Section 20 of the Forest Act. The learned NGT by order

dated 15th January 2021 directed the Chief Secretary to notify the

undisputed area within a period of three months and stated that

there should be an action plan for removal of encroachments. The

17 Hereinafter referred to as, “the NGT”.
18
2021 SCC OnLine NGT 608

Page 16 of 39
Writ Petition (C) No. 202 of 1995

learned NGT also appointed an Oversight Committee to be headed

by the Director General, Forests, Ministry of Environment, Forest

and Climate Change19 with other members, to oversee progress

with regard to removal of encroachments from the Ridge.

24. It will be relevant to refer to the following observations of the

learned NGT in Sonya Ghosh (supra)18:

“17. We direct constitution of an Oversight
Committee (OC) to be headed by DG Forest,
MoEF&CC, Government of India with the
Secretaries Revenue and Forest, Delhi
Govt., the PCCF, Delhi, the concerned
Deputy Commissioners, Delhi and the
nominees of Police Commissioner, Delhi
and the Forest Survey of India, Dehradun
as members. Main function of the OC will
be to oversee progress with regard to the
removal of encroachments from the Ridge,
its protection by way of fencing/boundary
wall and preparation of management plan
for its restitution. The Committee will be
free to co-opt any other
authorities/Experts. The Nodal agency will
be the PCCF, Delhi for coordination and
compliance. First meeting of the Committee
may be held within one month and
thereafter review may be undertaken
periodically preferably at least once in a
month till the action plan is executed.”
25. It was noticed by this Court vide an order dated 6th August

2025 passed in the present proceedings that apart from the

19 Hereinafter referred to, as “MoEF&CC”.

Page 17 of 39
Writ Petition (C) No. 202 of 1995

DRMB, numerous other bodies were also constituted by the orders

passed by this court, the High Court of Delhi and the learned NGT

which were also entrusted with the task of monitoring the issue

with regard to Ridge areas.

26. This Court by the said order was referring to the following

different bodies/committees/authorities:

i. Oversight Committee constituted vide order dated 15th

January 2021 passed by the learned NGT in Sonya Ghosh

(supra)18;

ii. Centrally Empowered Committee constituted vide Judgment

dated 30th November 2021 passed by the High Court of Delhi

in Ashok Kumar (supra)8;

iii. High-Powered Committee under order dated 8th February 2023

passed by this court in T.N.Godavarman (supra)13.

iv. Committee under order dated 8th February 2023 passed by this

court in T.N.Godavarman (supra)13 to identify the

Morphological Ridge.

27. Noticing that a number of committees were monitoring the

issue with regard to the Delhi Ridge area resulting in duplication

of work, overlap of jurisdiction and even conflicting outcomes, this

Page 18 of 39
Writ Petition (C) No. 202 of 1995

court passed the aforesaid order on 6th August 2025. It will be

appropriate to refer to the following paragraphs of the said order:

“1. We find that insofar as the issues
concerning the Delhi Ridge are concerned,
several committees are currently
monitoring the issues. The authorities are
required to seek permission from several
committees/Bodies for land diversion,
which, at times, results in conflicting
orders.
2. We, therefore, direct the Ministry of
Environment, Forest and Climate Change
(MoEF&CC) to take all the stake holders on
board, including the Government of NCT of
Delhi, the CEC and the various
Committees/Bodies appointed by this
Court or the High Court of Delhi and to
come out with a proposal wherein one
uniform body can be entrusted with
monitoring the issues relating to the Delhi
Ridge.”

28. It is further relevant to note that the High Court of Delhi in

the case of Devinder v. Lt. Governor and Others20 was

considering the same issue. The High Court by judgment dated 8th

November 2023 found the Chief Secretary to be prima facie in

contempt of the order dated 15th January 2021 passed by the

learned NGT. In its order dated 15th December 2023, the High

Court observed thus:

20 Writ Petition (C) No. 9965 of 2016

Page 19 of 39
Writ Petition (C) No. 202 of 1995

“3. The affidavit only seems to suggest that
action will be taken in the near future but
is totally silent as to what action has been
taken till day from 08.11.2023, what is the
time frame within which the notification will
be issued and the time frame within which
the encroachment will be removed from the
Ridge land.”

29. It appears from the proceedings before the High Court that

when the matter was heard on 8th January 2024, the Government

of NCT of Delhi21 undertook to issue the Notification under Section

20 within four weeks. It will be relevant to refer to the undertaking

recorded by the High Court in its order dated 8th January 2024:

“3. On the other hand, Mr. Satyakam,
learned ASC, GNCT of Delhi submits that
the steps for such process of issuance of
notification has already been initiated,
however it is taking some time to complete
the same.
4. He seeks and is granted four weeks’ time
to ensure that the notification under
Section 20 of IFA, 1927 is issued within the
same frame of time.”

30. It will also be relevant to note that this court itself was

parallelly hearing the same issue in two separate proceedings i.e.,

the present proceedings and MC Mehta v. Union of India (supra).

Noticing all this, this court passed an order dated 24th July 2024

21 Hereinafter referred to as, “GNCTD”.

Page 20 of 39
Writ Petition (C) No. 202 of 1995

directing the Registrar (Judl.) to place the matter before Hon’ble

the Chief Justice of India for constitution of a Special Bench.

Paragraphs 10 and 11 of the said order reads thus:

“10. We are of the considered view that, in
order to avoid the possibility of conflicting
order(s) being passed by two different
Benches, it will be appropriate that all the
matters pertaining to the Delhi Ridge Area
are heard by one Bench.
11. The Registrar(Judl.) is, therefore,
directed to place the matter before Hon’ble
the Chief Justice of India seeking
appropriate order.”

31. That is how the issue with regard to Delhi Ridge is before us

in the present proceedings.

DISCUSSION AND ANALYSIS

32. We have heard Shri K. Parameshwar, learned Senior Counsel

who is assisting this court as an Amicus Curiae and

Ms. Aishwarya Bhati, learned Additional Solicitor General of India

at length.

33. Three issues that fall for consideration before this court in

the present proceedings are as under:

i. Issuance of final notification of the Delhi Ridge under Section

20 of the Forest Act;

Page 21 of 39
Writ Petition (C) No. 202 of 1995

ii. Removal of encroachments from the Delhi Ridge and the

Morphological Ridge from at least 9th May 1996; and

iii. The identification of Morphological Ridge.

Status of Final Notification under Section 20

34. The learned NGT vide an order dated 15th January 2021 in

Sonya Ghosh (supra) and the High Court of Delhi by an order

dated 8th January 2024 in Devinder (supra)20 have directed the

GNCTD to issue final notification under Section 20 of the Forest

Act. However, the final notification has not been published yet. In

the Status Report dated 8th August 2024, the GNCTD has stated

that they are still in the process of settlement of rights and that

the joint demarcation of the ridge areas is still underway.

35. It cannot be gainsaid that the effect of non-notification of

Ridge as Reserve Forest deprives the said area of any protection.

We are, therefore, of the view that without proper statutory

protection, it would not be possible to properly preserve the

integrity of the Ridge. We find that the GNCTD has not acted with

swiftness in protecting the Ridge. Though this court observed as

early as in May, 1996 that the Government has not taken proper

Page 22 of 39
Writ Petition (C) No. 202 of 1995

steps for conservation of the Ridge, not much has been done even

after a lapse of almost three decades therefrom.

Removal of Encroachments

36. The CEC and various other authorities have found that the

Ridge Areas are now being rampantly encroached. The entire

purpose of the ecological conservation of the Ridge is futile if illegal

constructions are coming up throughout the area and the very

purpose of the order dated 29th September 1995 passed by this

court in M.C.Mehta (supra)14 regarding creation of the DRMB

would be frustrated if no steps are taken to contain such rampant

encroachments. However, there does not appear to be any active

steps taken by GNCTD towards securing the Ridge to preserve its

sanctity.

Identification of the Morphological Ridge

37. As observed hereinabove, the Morphological Ridge is an

equally important portion which requires preservation. The stand

taken by the DDA in the DRI matter that the Morphological Ridge

has no legal backing, requires to be seriously addressed by the

Committee appointed by this court by order dated 8th February

Page 23 of 39
Writ Petition (C) No. 202 of 1995

2023 in T.N.Godavarman (supra)13. Though a preliminary report

was submitted, the Committee is yet to submit its final report.

38. We are, however, of the view that without proper

identification or preservation of the Ridge, the integrity of the

entire ecology would be compromised. The Ridge acts as the green

lungs of the city, especially in the present conditions of increased

pollution. We, therefore, find that the DRMB needs to actively work

towards protecting and preserving the Delhi Ridge after its due

identification.

Reconstitution of the DRMB

39. It will be relevant to note that CEC in its Report dated 8th May

2024 (5th Report of 2024) also found that “the management of

Ridge Land does not seem to be up to the mark.” The said Report

was placed before this court and this court vide order dated 6th

August, 2025 directed the MoEF&CC to take all stakeholders on

board including the GNCTD, the CEC and the various

committees/bodies appointed by this court or the High Court of

Delhi or the learned NGT and to come out with a proposal wherein

one uniform body can be entrusted with monitoring the issues

relating to the Delhi Ridge.

Page 24 of 39
Writ Petition (C) No. 202 of 1995

40. The MoEF&CC has filed its compliance affidavit dated 7th

October 2025 stating that a Ridge Management Board will be

constituted under the Chairmanship of Chief Secretary, GNCTD

with a total of 12 members. However, it is to be noted that the

proposal does not mention the statutory basis for the DRMB, i.e.,

under what provisions, the DRMB has been constituted.

Statutory Backing of the DRMB

41. As has been observed by us hereinabove, the DRMB has

been acting without any statutory authority. The Original

Notification dated 6th October 1995 was issued only pursuant to

this court’s order dated 29th September 1995 in M.C.Mehta

(supra)14 and that too without any statutory backing for the

Board. We are, however, of the considered view that without a

statutory backing, it will not be possible for the Board to function

effectively.

42. A statutory backing will firstly ensure that the fundamental

principles of administration would directly apply to the Board.

Secondly, a statutory authority working under Section 3(3) of the

EP Act would be subject to the jurisdiction of the NGT under

Section 14 of the NGT Act, 2010. Thirdly, the accountability and

Page 25 of 39
Writ Petition (C) No. 202 of 1995

transparency required of a statutory body, such as publication

of reports on websites, being subject to the RTI Act22 etc., would

be ensured by the Board being an Authority under Section 3(3)

of the EP Act.

43. We may also note that the CEC was also working as an ad-

hoc body without having any statutory backing until the

MoEF&CC vide Notification dated 5th September 2023 granted

statutory recognition to it upon a judgment passed by this court

thereby deprecating the practice of ad-hoc institutions and

requesting the learned Solicitor General of India to

institutionalize it as an authority under the EP Act. This court

vide judgment and order dated 31st January 2024 passed in

T.N. Godavarman Thirumulpad v. Union of India and

Others23 observed thus:

“20. We find that by virtue of the
Notification dated 05.09.2023, our
concerns regarding the functioning of the
CEC as an ad hoc body and that hereinafter
it should be institutionalised as a
permanent body have been taken care of.
The said Notification provides for the
constitution of the CEC, its powers,
functions, mandate, members, method of

22
short for ‘Right to Information Act, 2005’
23 (2024) SCC OnLine SC 86

Page 26 of 39
Writ Petition (C) No. 202 of 1995

appointment, terms of service, and
monitoring of its functioning.”

44. It will be relevant to note that this court in the case of

Madhya Pradesh High Court Advocates Bar Association and

Another v. Union of India and Another24 has held that the

learned NGT under Sections 14 and 22 of the NGT Act does not

oust the High Court’s jurisdiction under Articles 226 and 227 as

the same is part of basic structure of the Constitution. It is

further held that the appeal to this court under Section 22 of the

NGT Act is intra vires the Constitution of India. In the said case,

the court held thus:

“45. In consequence of the above analysis,
our conclusions are:
A. The National Green Tribunal under
Section 14 & 22 of the NGT Act does not
oust the High Court’s jurisdiction under
Article 226 & 227 as the same is a part of
the basic structure of the Constitution.
B. The remedy of direct appeal to the
Supreme Court under Section 22 of the
NGT Act is intra vires the Constitution of
India.”

45. It can thus be seen that if the DRMB is given statutory

status, its orders can be judicially scrutinized either by the

learned NGT under Section 14 of the NGT Act and by this court

24 (2022) SCC OnLine SC 639

Page 27 of 39
Writ Petition (C) No. 202 of 1995

by way of appeal under Section 22 of the said act or by the High

Court under Articles 226 and 227 of the Constitution of India.

46. In the judgment of this court dated 31st January 2024 in

T.N.Godavarman (supra)23, this court held that environmental

rule of law fosters open, accountable, and transparent decision-

making and participatory governance. It has been held that the

renewed role of constitutional courts will be to undertake judicial

review to ensure that institutions and regulatory bodies comply

with the principles of environmental rule of law. It will be

relevant to note the following observations made by this court in

the said case:

“32. In furtherance of the principles of
environmental rule of law, the bodies,
authorities, regulators, and executive
offices entrusted with environmental
duties must function with the following
institutional features:
i. The composition, qualifications,
tenure, method of appointment and
removal of the members of these
authorities must be clearly laid down.
Further, the appointments must be
regularly made to ensure continuity and
these bodies must be staffed with persons
who have the requisite knowledge,
technical expertise, and specialisation to
ensure their efficient functioning.

Page 28 of 39
Writ Petition (C) No. 202 of 1995

ii. The authorities and bodies must
receive adequate funding and their
finances must be certain and clear.
iii. The mandate and role of each
authority and body must be clearly
demarcated so as to avoid overlap and
duplication of work and the method for
constructive coordination between
institutions must be prescribed.
iv. The authorities and bodies must
notify and make available the rules,
regulations, and other guidelines and
make them accessible by providing them
on the website, including in regional
languages, to the extent possible. If the
authority or body does not have the power
to frame rules or regulations, it may issue
comprehensive guidelines in a
standardised form and notify them rather
than office memoranda.
v. These bodies must clearly lay down
the applicable rules and regulations in
detail and the procedure for application,
consideration, and grant of permissions,
consent, and approvals.
vi. The authorities and bodies must
notify norms for public hearing, the
process of decision-making, prescription
of right to appeal, and timelines.
vii. These bodies must prescribe the
method of accountability by clearly
indicating the allocation of duties and
responsibilities of their officers.
viii. There must be regular and
systematic audit of the functioning of
these authorities.”

Page 29 of 39
Writ Petition (C) No. 202 of 1995

47. The MoEF&CC has opposed giving statutory status to the

DRMB. It has expressed apprehension that if the Central

Government issues a notification, there will be an overlap of

other authorities. However, we do not find any substance in the

said submission of MoEF&CC. The very purpose of the earlier

orders passed by this court and the present judgment is to avoid

having multiple authorities considering the issue with regard to

the Delhi Ridge. We, therefore, propose to direct the DRMB to be

a single-window authority insofar as issues concerning Delhi

Ridge are concerned. Like the CEC, if the DRMB is also given a

statutory status, it will be in a position to function effectively and

also be accountable and answerable.

Representative of the CEC in the DRMB

48. We further find that rather than the DRMB reporting to the

CEC every now and then and having two levels of scrutiny, it will

be appropriate that a representative of CEC is made a member of

the DRMB. It is only pursuant to the Report of the CEC that the

present litigation has commenced. The CEC has also been integral

to the protection of the Ridge insofar as it has submitted

Page 30 of 39
Writ Petition (C) No. 202 of 1995

numerous reports to this court regarding encroachments and

permissions for construction in the Ridge areas.

49. The MoEF&CC has submitted that a member of the CEC may

be co-opted as and when the DRMB requires. However, it is to be

noted that the CEC is a nodal body appointed by this court to look

after the environmental issues in the country. The CEC has done

yeomen service for the last 3 decades in preserving the

environment by bringing to the notice of this court the

environmental issues which are plaguing the nation. Since the

CEC is continuously assisting this court as far as environmental

matters are concerned, the presence of its representative would

only add to the strength of the DRMB.

Standing Committee for DRMB

50. We are also of the considered view that taking into

consideration the constitution of the DRMB, it would not be

possible for it to regularly function on a day-to-day basis. It will,

therefore, be appropriate that the DRMB constitutes a Standing

Committee which can look after the day-to-day affairs of the

Board. We may also take note that for the National Board for

Wildlife, constituted under Section 5A of the Wildlife Protection Act,

Page 31 of 39
Writ Petition (C) No. 202 of 1995

197225, the Hon’ble Prime Minister is the Chairperson. However,

the day-to-day functioning of the National Board for Wildlife is

executed through its Standing Committee which is constituted

under Section 5B of the WP Act.

51. We, however, find that the Standing Committee must consist

of experts and technicians who have worked in the field of

conservation. We further find that for the purpose of preservation

and protection of Delhi Ridge, it is necessary that the Standing

Committee should meet regularly.

52. The MoEF&CC has opposed the proposal for constitution of

a Standing Committee on the ground that under the

Chairmanship of the Chief Secretary, DRMB would be able to

ensure the active engagement of all the members. However, it is to

be taken note of that the proposed DRMB consists of senior

officers from various departments and as such, it would not be

practical for the DRMB to meet on a day-to-day basis thereby

necessitating the constitution of a Standing Committee.

25Hereinafter known as, “the WP Act”.

Page 32 of 39
Writ Petition (C) No. 202 of 1995

Functions of the DRMB

53. Having considered the issues with regard to constitution of

the DRMB and the Standing Committee, it is now necessary to

consider as to what will be the functions of the DRMB.

54. The core functions of the DRMB must be directed towards

conservation of the existing Ridge Forests and removal of existing

encroachments from the Ridge. The very purpose of the DRMB is

to preserve the integrity of the Ridge, as a morphological and

ecological feature. Therefore, the DRMB should focus on

preservation of existing Ridge forests and further improving the

areas through scientific conservation measures. The DRMB

should also ensure that fragmentation of Ridge Forests is

prevented.

55. This court recently in judgment dated 6th March 2024

pronounced in T.N. Godavarman Thirumulpad v. Union of

India (In Re: Gaurav Kumar Bansal)26 has observed thus:

“173. It could thus be seen that,
worldwide as well as in our
jurisprudence, the law has developed and
evolved emphasizing on the restoration
of the damaged ecological system. A
reversal of environmental damage in

26 (2025) 2 SCC 641

Page 33 of 39
Writ Petition (C) No. 202 of 1995

conformity with the principle under
Article 8(f) of the CBD is what is required.
At times, the compensatory afforestation
permits forestation at some other site.
However, the principle of restoration of
damaged ecosystem would require the
States to promote the recovery of
threatened species. We are of the
considered view that the States would be
required to take steps for the identification
and effective implementation of active
restoration measures that are localized to
the particular ecosystem that was
damaged. The focus has to be on
restoration of the ecosystem as close and
similar as possible to the specific one that
was damaged.
xxxx xxxx xxxx
175. We find that, bringing the culprits to
face the proceedings is a different matter
and restoration of the damage already done
is a different matter. We are of the
considered view that the State cannot run
away from its responsibilities to restore the
damage done to the forest. The State, apart
from preventing such acts in the future,
should take immediate steps for restoration
of the damage already done; undertake an
exercise for determining the valuation of the
damage done and recover it from the
persons found responsible for causing such
a damage.”
(emphasis supplied)

56. We are of the considered view that in tune with aforesaid, the

DRMB must work with the sole purpose of preservation and

restoration of the Delhi Ridge area.

Page 34 of 39
Writ Petition (C) No. 202 of 1995

CONCLUSION AND DIRECTIONS

57. We, therefore, pass the following order:

i. We direct the MoEF&CC to constitute the DRMB by issuing

notification under Section 3(3) of the EP Act with the

membership as under:

1. Chief Secretary, GNCT of Delhi, Chairman

2. Vice-Chairman, Delhi Development Authority, Member

3. Representative of the Director General of Forests &

Special Secretary, MoEF&CC, Government of India, not

below the rank of Inspector General of Forests, Member

4. Representative of the Ministry of Housing and Urban

Affairs, Gol (not below the rank of JS), Member

5. Commissioner, Municipal Corporation of Delhi,

Member

6. Chairman, New Delhi Municipal Council, Member

7. Director General, Central Public Works Department,

Government of India, Member

8. Representative of the Commissioner of Police, Delhi

(not below the rank of Joint Commissioner), Member

Page 35 of 39
Writ Petition (C) No. 202 of 1995

9. Principal Secretary/Secretary (Environment & Forests),

GNCTD, Member

10. Principal Secretary/Secretary (Land Revenue), GNCTD,

Member

11. Two representatives from NGOs and Civil Societies (to

be nominated by GNCT of Delhi), Member

12. Principal Chief Conservator of Forests, GNCTD,

Member-Secretary

13. Representative of Central Empowered Committee

(CEC), Member

ii. The DRMB on its constitution would constitute a Standing

Committee as under:

1. Member of the CEC, Chairperson;

2. Principal Chief Conservator of Forests, GNCTD;

3. Two Representatives from NGOs and Civil Societies

who are already part of the DRMB;

4. Nominee of the Chief Secretary, GNCTD; and

5. Nominee of the Delhi Development Authority.

The nominees to be appointed by the Chief Secretary,
GNCTD and DDA must be experts in the field of
conservation.

Page 36 of 39
Writ Petition (C) No. 202 of 1995

iii. The functioning of the DRMB would be as under:

a) The Board shall act as a single-window authority

insofar as the Delhi Ridge and the Morphological

Ridge is concerned;

b) The Board must ensure the preservation of the Delhi

Ridge and Morphological Ridge in its pristine glory by

removing all encroachments and taking all necessary

steps to improve the Ridge;

c) The Board must remove all encroachments in the

Delhi Ridge as well as the Morphological Ridge;

d) The Board must duly ensure that the identification

process of the Morphological Ridge is complete as per

order dated 8th February, 2023 in T.N. Godavarman

(supra)13 and report its compliance, along with

comments, if any, to this court;

e) The Board must ensure the protection, scientific

management, ecological restoration of the Ridge and

the Morphological Ridge including afforestation and

habitat conservation;

Page 37 of 39
Writ Petition (C) No. 202 of 1995

f) The Board must submit periodic Reports every six

months to this court regarding the status of the Ridge

and the Morphological Ridge and the compliance of

the directions of this court;

g) The Board must act fairly and transparently in

discharge of its functions – this would include having

a website, provide public notices for hearings in

advance, public consultation, and uploading of

reports on the website as soon as they are placed

before this court or any other Authority; and

h) All authorities in the territory of the NCT of Delhi

must act in aid of the discharge of duties of the

Board.

iv. The Member of the CEC who will officially act as the

representative to the DRMB is directed to report to this court

every three months on proper functioning of the DRMB and

the Standing Committee.

58. Before we part with this judgment, we place on record our

appreciation for the valuable assistance provided by

Ms. Aishwarya Bhati, learned ASG and Mr. K. Parameshwar,

Page 38 of 39
Writ Petition (C) No. 202 of 1995

learned Amicus Curiae ably assisted by Mr. Mukunda, Ms. Kanti,

Mr. Shreenivas Patil and Ms. Raji Gururaj.

…………………….CJI
(B.R. GAVAI)

……………………………….J
(K. VINOD CHANDRAN)

NEW DELHI;
NOVEMBER 11, 2025.

Page 39 of 39