2026 INSC 1125

Dhanlaxmi Merchandise Pvt. Ltd. (M/s) v. State of Madhya Pradesh

Neutral Citation
2026 INSC 1125
Date
14.10.2026
Year
2026
Source in the index
sci.gov.in neutral-citation

Full text

2026 INSC 1125

NON-REPORTABLE

IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
CIVIL APPEAL NO(S).13749 OF 2026
(Arising out of SLP (C) No. 11388 of 2026)

M/S DHANLAXMI MERCHANDISE
PVT. LTD. … APPELLANT(S)
VERSUS
STATE OF MADHYA PRADESH
& ORS. …RESPONDENT(S)
WITH
CIVIL APPEAL NO(S).13750 OF 2026
(Arising out of SLP (C) No. 11160 of 2026)

SAHAKAR GLOBAL LTD. … APPELLANT(S)

VERSUS
STATE OF MADHYA PRADESH
& ORS. …RESPONDENT(S)

J UD GM E N T

ARAVIND KUMAR, J.

1.
Signature Not Verified

Digitally signed by
Leave granted.
NEHA GUPTA
Date: 2026.10.15
18:27:51 IST
Reason:

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 1 of 56

2. These appeals arise from a common judgment dated
18.03.2026 passed by the High Court of Madhya Pradesh at
Jabalpur in Writ Petition No.48901 of 2025 and Writ Petition
No.1880 of 2026. The former writ petition was instituted by
Sahakar Global Limited (hereinafter referred to as “Sahakar”
for brevity) and concerns the sand mining group of District
Shahdol, while the latter was instituted by M/s Dhanlaxmi
Merchandise Private Limited (hereinafter referred to as
“Dhanlaxmi” for brevity) and concerns the sand mining group
of District Katni. In both proceedings, challenge was laid to the
cancellation of an e-tender-cum-auction conducted by the
Madhya Pradesh State Mining Corporation Limited pursuant
to Notice No. Sand/Tender/2025-26/406 dated 18.09.2025.
The cancellation in respect of the two groups flowed from a
common decision taken by the Board of Directors of the
Corporation on 19.11.2025 and was communicated to the
concerned bidders on 05.12.2025. Since the two writ petitions
arose out of the same decision and raised substantially common
questions, they were heard and disposed of together by the
High Court. These appeals have accordingly been heard
together, though certain facts peculiar to the two appellants
require separate consideration.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 2 of 56

3. The circumstances in which the controversy arose may be
stated at the outset. Both appellants had, under an earlier round
of tendering, operated the very sand groups for which they
subsequently bid. Both surrendered those contracts under the
surrender provision then in force. The Corporation thereafter
brought Shahdol and Katni again to auction, accepted the
appellants as technically qualified participants and conducted
the competitive bidding to its conclusion. Sahakar emerged as
the highest bidder for Shahdol and Dhanlaxmi for Katni. The
amounts quoted by them in the fresh auction were, however,
substantially lower than the amounts which they had
themselves quoted in the earlier round. It was this
circumstance, read with the fact of surrender, which led the
Board to reconsider whether the tender process ought to be
carried further.

4. The factual position of the two appellants is not altogether
identical. Sahakar’s earlier Shahdol contract had already
become the subject matter of proceedings concerning
availability of mines with the requisite statutory permissions
before the surrender was tendered. The Katni contract of
Dhanlaxmi does not carry the same history. It would, therefore,
be appropriate first to notice the statutory arrangement and

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 3 of 56

thereafter the factual course of the two contracts separately
before they converge in the common tender of September
2025.

STATUTORY AND CONTRACTUAL SETTING

5. The Madhya Pradesh Sand (Mining, Transportation, Storage
and Trading) Rules, 2019 govern the extraction, transportation,
storage and trading of sand in the State. The Rules were
materially amended on 26.05.2023. Under the arrangement
introduced by that amendment, the quarry leases came to be
allotted to the Madhya Pradesh State Mining Corporation
Limited, which was to carry out mining operations through
Mine Developer-cum-Operators (hereinafter referred to as
“MDO” for brevity) selected in accordance with the prescribed
procedure. The Corporation thus remained the holder of the
quarry leases, while the MDO selected for a particular group
undertook the mining and sale operations subject to the
statutory permissions governing the individual mines.

6. The regulatory arrangement contemplated that the mining plan,
environmental clearance and the requisite water and air
consents would govern actual extraction. A mine could form
part of a notified group although all permissions might not have

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 4 of 56

become operative at the same point of time. Inclusion of a mine
in the tendered group and the entitlement actually to extract
mineral therefrom were, therefore, matters which had to be
understood with reference to the permissions then in force.

7. Rule 7 prescribed the manner in which the initial base or upset
price was to be worked out, while Rule 8 provided for selection
through e-tender-cum-e-auction. Rule 9 contemplated a
contract for three years. The bid amounts which figure
prominently in these proceedings were annual bid amounts and
not the aggregate consideration for the full three-year tenure.
The fresh tender which later came to be issued was not merely
for the unexpired residue of the earlier surrendered agreements;
it contemplated a fresh contractual tenure under the Rules.

8. Rule 16, in the form in which it stood during 2025, permitted
an MDO to surrender a sand group by giving three months’
advance notice to the Corporation, subject to payment of the
dues payable to the Corporation and the State Government and
approval of the State Government. The application, once
submitted, was irrevocable and possession was thereafter to be
handed over in accordance with the agreement. Upon receipt
of the surrender application, the Corporation was required to
initiate proceedings for re-tendering the group. An application

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 5 of 56

within the last six months of the contractual period was not to
be considered.

9. The Rule as it then stood did not prescribe a general
disqualification preventing the surrendering MDO from
participating when the same group was re-tendered. Nor did it
stipulate that such an MDO, if otherwise eligible, could
participate only upon offering an amount equal to or greater
than its earlier bid. This position was subsequently altered by
amendment dated 30.01.2026, to which we shall advert at the
appropriate stage.

10. The tender conditions themselves also reserved substantial
powers in favour of the Corporation. Clause 6.5.5 dealt with
determination of the H1 participant, while Clauses 6.6.3 and 26
reserved to the competent authority the power to reject the
highest bid and to cancel the tender process. Emergence as H1
did not, therefore, amount to an unconditional acceptance or a
concluded contract. At the same time, those clauses formed
part of a tender issued by a State instrumentality and their
operation remained subject to the law governing exercise of
public power.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 6 of 56

SHAHDOL AND SAHAKAR GLOBAL LIMITED

11. The Shahdol group comprised 34 mines with an annual
tendered quantity of 17,60,000 cubic metres. The reserve price
under the earlier tender was ₹44 crore. Sahakar Global Limited
emerged successful in that process with an annual bid of
₹68,84,25,999, corresponding to approximately ₹391.151 per
cubic metre. An agreement was executed between Sahakar and
the Corporation on 12.01.2024 for a three-year period ending
on 11.01.2027.

12. Difficulties thereafter arose in the operation of that agreement.
The Corporation’s own pleadings disclose that environmental
clearances had been obtained for 23 mines corresponding to
approximately 14,86,630 cubic metres, as against the 34 mines
and annual tendered quantity of 17,60,000 cubic metres
forming part of the notified group. Sahakar’s stand was that it
had bid for the whole notified group upon the expectation that
the mines comprising it would be made available with the
requisite statutory permissions. The Corporation maintained,
on the other hand, that the tender conditions sufficiently
disclosed the permission position and that Sahakar had

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 7 of 56

undertaken the commercial venture after acquainting itself
with the mines and the applicable conditions.

13. This disagreement was not raised for the first time after the
later tender came to be cancelled. Sahakar had already
approached the High Court by instituting Writ Petition
No.15714 of 2025. By an interim order dated 09.05.2025, the
High Court directed, pending further consideration, that
Sahakar should continue to make payment having regard to the
quantity actually extracted from the available quantity for
which environmental clearance had been received. The interim
arrangement did not finally determine that the Corporation was
in breach, nor did it adjudicate Sahakar’s ultimate financial
liability under the agreement. It nevertheless forms an
important part of the chronology because the controversy
concerning permissions was already alive before the surrender
which followed.

14. On 11.07.2025, Sahakar submitted a notice of surrender. The
communication referred to the difficulty arising from non-
availability of statutory permissions for the entire tendered
quantity and to the financial consequences which, according to
the appellant, had resulted therefrom. The surrender was
sought under the provision then governing the relationship.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 8 of 56

The Corporation’s own surrender chart records 10.10.2025 as
the effective date of surrender. We are not concerned in these
proceedings with the final settlement of accounts under that
earlier agreement.

KATNI AND DHANLAXMI MERCHANDISE PRIVATE
LIMITED

15. The Katni group comprised 49 mines with an annual tendered
quantity of 20,00,000 cubic metres. The reserve price under the
earlier process was ₹50 crore. Dhanlaxmi Merchandise Private
Limited emerged successful at an annual bid of ₹64,77,66,000,
corresponding to approximately ₹323.883 per cubic metre. The
agreement between Dhanlaxmi and the Corporation was
executed on 01.11.2023 for a period of three years.

16. Dhanlaxmi submitted its notice of surrender on 01.08.2025.
The communication invoked the provision permitting
surrender on three months’ notice and stated that there were no
outstanding dues. The Corporation’s chart records 31.10.2025
as the effective date of surrender. Unlike Shahdol, no
corresponding dispute concerning absence of environmental
clearance for the Katni mines had arisen. The Corporation has

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 9 of 56

specifically maintained that the requisite permissions for Katni
were available.

17. In its later pleadings, Dhanlaxmi attributed the surrender to the
commercial working of the contract, including demand,
transportation and operational costs and the actual quantities
which could be sold. Its rejoinder referred to sales of 8,60,970
cubic metres during the first contractual year and 16,81,512
cubic metres during the second, against the annual tendered
quantity of 20,00,000 cubic metres. Those figures form part of
the appellant’s pleaded explanation and are not findings
resulting from an audit of the earlier contract. It is also
significant that the surrender notice itself did not set out that
commercial explanation in the detail subsequently found in the
rejoinder.

18. At this stage, therefore, the factual courses of Shahdol and
Katni remained distinct. What brought them together was the
decision of the Corporation to place both groups again in the
market.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 10 of 56

DECISION TO RE-TENDER

19. Before the fresh NIT was issued, the question of strengthening
the surrender provisions had already engaged the attention of
the authorities. Proposals were under consideration for
restricting participation by surrendering MDOs, recovering
loss arising upon re-tendering and introducing stricter
consequences in cases of surrender.

20. The matter was considered at the 281st meeting of the Board
held on 18.09.2025. The Board was conscious of the proposed
changes and of the fact that certain groups, including Shahdol
and Katni, had been surrendered. It nevertheless resolved that,
in order to ensure continuity in the supply of sand, selection of
MDOs for Katni, Shahdol, Jabalpur, Guna, Barwani, Rajgarh
and Mandsaur could be undertaken under the Rules then
prevailing. This contemporaneous decision is reflected in the
Board material forming part of the record.

21. On the same date, the Corporation issued Notice No.
Sand/Tender/2025-26/406. The detailed tender material
followed on 19.09.2025 and the schedule was thereafter
modified by a corrigendum dated 24.09.2025. Shahdol
continued to be notified with 34 mines, an annual quantity of

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 11 of 56

17,60,000 cubic metres and a reserve price of ₹44 crore. Katni
was notified with 49 mines, an annual quantity of 20,00,000
cubic metres and a reserve price of ₹50 crore.

22. Both appellants participated in the process. Their technical bids
were scrutinised and accepted. The material later placed before
the Board records seven technically qualified participants for
Shahdol and five for Katni. The tender was therefore not
proceeding with a solitary eligible bidder in either district.

AUCTION DATED 10.10.2025

23. The financial auctions were held on 10.10.2025. For Shahdol,
Sahakar submitted the highest initial price offer of
₹46,80,00,000. The electronic auction commenced at 11.00
a.m. Other participants thereafter entered higher bids and the
bidding continued until Sahakar submitted its final offer of
₹48,20,40,000 at 12.34 p.m. The amount remained the highest
offer at closure. On the annual quantity of 17,60,000 cubic
metres, the resulting rate was approximately ₹273.886 per
cubic metre. The annual offer exceeded the reserve price of ₹44
crore by ₹4,20,40,000.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 12 of 56

24. In Katni, the highest initial offer was ₹52,37,11,111. The
auction commenced at 10.00 a.m. Sahakar, which was itself a
participant in the Katni process, submitted a higher bid at 10.48
a.m. Successive bids followed and the process culminated in
Dhanlaxmi’s offer of ₹54,07,41,111 at 11.36 a.m. This
remained H1 at closure. The amount corresponded to
approximately ₹270.371 per cubic metre and exceeded the
reserve price of ₹50 crore by ₹4,07,41,111.

25. Sahakar thus emerged H1 for Shahdol and Dhanlaxmi H1 for
Katni. No Letter of Intent or final allotment was issued
immediately thereafter.

LEGAL OPINION AND BOARD CONSIDERATION

26. The Corporation thereafter sought legal advice by a
communication dated 31.10.2025. The opinion dated
11.11.2025, as reproduced in the Board agenda, records that
the successful bidders had neither been debarred nor
blacklisted; that the Corporation had stated that they complied
with the requirements of the current tender; and that no
document warranting an adverse inference against them had
accompanied the reference. The advice was that the
Corporation could proceed, subject to satisfaction of the

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 13 of 56

remaining tender and statutory requirements. The opinion did
not bind the Board and did not amount to acceptance of either
bid. Its relevance lies in the factual position obtaining when the
matter thereafter came up for decision.

27. At its meeting held on 19.11.2025, the Board considered the
results of the fresh auction together with the corresponding
figures under the earlier contracts. In Shahdol, the earlier
annual bid of ₹68,84,25,999 was compared with the fresh H1
bid of ₹48,20,40,000. The difference was ₹20,63,85,999, or
approximately 29.98 per cent. In Katni, the earlier annual bid
of ₹64,77,66,000 was compared with ₹54,07,41,111, yielding
a difference of ₹10,70,24,889, or approximately 16.52 per cent.
These were substantial differences.

28. In relation to Shahdol, the Board material also adverted to the
earlier dispute concerning statutory permissions and to the
Corporation’s stand that the operative permission position had
not changed in the manner suggested by Sahakar. The tender
obligations concerning inspection of the mines and the bidder’s
knowledge of the relevant circumstances were also referred to.
It would, therefore, not be correct to say that the permission
controversy was wholly absent from the material placed before
the Board.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 14 of 56

29. Upon consideration of the material, the Board formed the view
that the highest rates obtained in the fresh auction for Shahdol
and Katni were not competitive and resolved to reject the offers
and cancel the e-tender-cum-auction process for those two
groups. It did not declare either appellant ineligible or blacklist
them. Nor did it determine the liabilities, if any, under their
earlier surrendered agreements. The operative decision was
confined to rejection of the present bids and cancellation of the
fresh process.

30. The decision was communicated on 05.12.2025. The
cancellation communications themselves were brief and
referred to the power contained in the tender conditions. The
detailed basis upon which the Board had acted emerged from
the contemporaneous agenda and minutes subsequently placed
before the High Court.

PROCEEDINGS BEFORE THE HIGH COURT AND
AMENDMENT OF THE RULES

31. Sahakar questioned the cancellation by filing Writ Petition
No.48901 of 2025 in relation to Shahdol. Dhanlaxmi instituted
Writ Petition No.1880 of 2026 concerning Katni. Since both
challenges arose from the same Board decision, the

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 15 of 56

Corporation placed substantially common material before the
High Court, while also dealing with the factual features
particular to each district.

32. During pendency of those proceedings, the Sand Rules were
amended on 30.01.2026. The substituted Rule 16 introduced a
materially different surrender regime. Amongst other things, it
provided that the MDO, and its proprietor, director or partner,
which had surrendered a group would not be eligible to
participate in the e-tender-cum-auction of the same group for
the prescribed three-year period. Provision was also made for
adjustment of loss arising upon re-tendering against the
security of the former MDO and for recovery of any balance.
The upset-price methodology applicable to surrendered groups
was also altered.

33. Following the amendment, the Corporation issued another NIT
on 10.02.2026. The reserve price was fixed at ₹52.80 crore for
Shahdol and ₹60 crore for Katni. That subsequent process
assumed relevance later when the question of interim
protection and eventual relief came before this Court.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 16 of 56

JUDGMENT OF THE HIGH COURT

34. The two writ petitions were heard together and disposed of by
the common judgment dated 18.03.2026. The High Court
noticed that both Appellants had themselves obtained the
respective district groups at higher rates in the earlier round,
had thereafter surrendered those groups and had once again
emerged H1 in the fresh process at lower rates. It accepted the
Corporation’s position that the difference was substantial and
that the decision to cancel the process was one taken in
protection of public revenue.

35. The High Court also relied upon Clauses 6.6.3 and 26 and upon
the settled principle that the highest bidder does not acquire an
indefeasible right to have the contract concluded in its favour.
It noticed the earlier litigation concerning Sahakar and the
environmental-clearance position, but did not regard the same
as sufficient to displace the commercial decision of the Board.

36. Reliance placed by the Appellant’s upon Golden Food
Products India v. State of Uttar Pradesh and Others 1 was
distinguished. The High Court understood the decision as

1
2026 SCC OnLine SC 24

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 17 of 56

recognising that the highest bid may be rejected for a valid
reason and held that the substantial difference between the
amounts quoted by the same MDOs in the two rounds, with the
attendant implications for public revenue, furnished such a
reason. Both writ petitions were accordingly dismissed.

PROCEEDINGS BEFORE THIS COURT

37. Sahakar thereafter preferred SLP(C) No.11160 of 2026, while
Dhanlaxmi preferred SLP(C) No.11388 of 2026. On
25.03.2026, this Court issued notice and directed that the fresh
auction process, insofar as Shahdol and Katni were concerned,
should not be finalised without leave of the Court. The matters
came to be heard on several dates thereafter. Since the two
petitions arose out of the common judgment and the same
Board decision, SLP(C) No.11388 of 2026 was directed to be
listed along with SLP(C) No.11160 of 2026.

38. During pendency of the proceedings, applications for
intervention and impleadment were filed by participants in the
subsequent Shahdol process. Material was placed on record
showing higher initial price offers in that later round. The
subsequent e-auction had, however, not culminated in a final
allotment on account of the interim order of this Court. Those

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 18 of 56

developments bear primarily upon the relief to be granted and
will be considered at the appropriate stage.

39. With this factual background, we may notice the submissions
advanced on behalf of the parties.

SUBMISSIONS AND CONTENTIONS OF PARTIES

ON BEHALF OF SAHAKAR GLOBAL LIMITED

40. Mr. K. Parameshwar, learned Senior Counsel appearing for
Sahakar Global Limited, submitted that the cancellation
proceeded upon an erroneous assumption that the earlier
annual bid of ₹68,84,25,999 represented the continuing value
of the Shahdol mining opportunity and could, without anything
further, be used as the benchmark for judging the
competitiveness of the September 2025 auction. Learned
Senior Counsel submitted that the two contractual situations
could not be treated as economically identical merely because
both concerned the Shahdol group.

41. He drew our attention to the position relating to statutory
permissions under the earlier agreement. The tendered group
comprised 34 mines and 17,60,000 cubic metres, whereas the
Corporation’s own pleadings recorded environmental

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 19 of 56

clearances for 23 mines corresponding to approximately
14,86,630 cubic metres. It was submitted that Sahakar had bid
for the notified opportunity, whereas in practice the entire
tendered group had not become available for lawful mining.

42. Learned Senior Counsel further submitted that this was not a
grievance raised after the surrender. Sahakar had approached
the High Court in Writ Petition No.15714 of 2025 and had
obtained the interim order dated 09.05.2025 relating payment
to actual extraction from the available quantity for which
environmental clearance had been received. The surrender
dated 11.07.2025 followed thereafter. According to him, the
earlier bid could not therefore be treated as an unquestioned
indication of the commercial value subsequently available
under the fresh tender.

43. It was next submitted that Sahakar had exercised a right which
the law then expressly recognised. Rule 16 permitted surrender
and required re-tendering. There was no provision at the
relevant time disqualifying the surrendering MDO from
participating again. Sahakar had not been blacklisted or
debarred, and the Corporation itself found it technically
eligible under the fresh NIT.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 20 of 56

44. Learned Senior Counsel laid particular emphasis on the Board
decision dated 18.09.2025. He submitted that the Board was
already conscious that amendments to the surrender regime
were under consideration, yet consciously decided to proceed
with selection under the Rules then prevailing. Having done so,
the Corporation could not, after completion of the auction, treat
the appellant as though a restriction subsequently introduced in
January 2026 were already part of the September 2025 regime.

45. He thereafter took us through the actual bidding record. Seven
bidders had qualified for Shahdol. Sahakar’s initial offer was
₹46.80 crore and the electronic auction thereafter witnessed
successive bids before Sahakar emerged H1 at ₹48,20,40,000.
The final figure exceeded the reserve price by ₹4,20,40,000.
There was no allegation of collusion, cartelisation or
manipulation of the auction. In such circumstances, it was
submitted, the conclusion that the result was “non-
competitive” merely because Sahakar had earlier quoted more
could not be sustained.

46. Learned Senior Counsel also referred to the legal opinion dated
11.11.2025, which recorded that the successful bidders were
neither debarred nor blacklisted and that no adverse material

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 21 of 56

had been furnished to the law officer. He fairly accepted that
the opinion did not bind the Board, but submitted that it
demonstrated the factual position immediately preceding the
impugned decision.

47. The subsequent amendment dated 30.01.2026 was also relied
upon. Learned Senior Counsel submitted that the rule-making
authority then expressly introduced the very restriction which
had not existed earlier, namely ineligibility of the surrendering
MDO and its connected persons for the same group for the
prescribed period, coupled with a mechanism for recovery of
loss. The amendment being prospective, it could not furnish a
disqualification for an auction already conducted under the
earlier regime.

48. Reliance was placed upon Food Corporation of India v. M/s.
Kamdhenu Cattle Feed Industries 2, Tata Cellular v. Union of
India 3 , M.P. Power Management Company Limited,
Jabalpur v. Sky Power Southeast Solar India Private Limited
and Others 4 , Subodh Kumar Singh Rathour v. Chief

2
(1993) 1 SCC 71
3
(1994) 6 SCC 651
4
(2023) 2 SCC 703

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 22 of 56

Executive Officer and Others 5 and Golden Food Products
India v. State of Uttar Pradesh (supra). Learned Senior
Counsel clarified that the appellant was not asserting an
absolute right merely because it was H1. The submission was
that, once a public authority conducted a valid competitive
process and received an above-reserve H1 offer, rejection of
that result had to rest upon material rationally demonstrating
why the offer was unacceptable. A bidder’s own historical
offer, without an assessment of comparability and current
value, could not by itself supply that basis.

49. Lastly, learned Senior Counsel submitted that the subsequent
Shahdol process could not retrospectively validate the earlier
cancellation. The later process arose under an amended regime,
at an enhanced reserve price and at a later point of time. In any
event, no final competitive allotment had arisen from that
process owing to the interim order of this court.

ON BEHALF OF DHANLAXMI MERCHANDISE PRIVATE
LIMITED

50. Mr. Balbir Singh, learned Senior Counsel appearing for
Dhanlaxmi Merchandise Private Limited, adopted the

5
(2024) 15 SCC 461

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 23 of 56

submissions concerning the scope of judicial review, the old
Rule 16 and the prospective amendment, but submitted that
Katni stood on its own factual footing. He did not seek to place
Dhanlaxmi upon the particular environmental-clearance
dispute which existed in Shahdol.

51. Learned Senior Counsel submitted that Dhanlaxmi had
obtained Katni at the earlier annual bid of ₹64,77,66,000 and
thereafter surrendered the group on 01.08.2025 under the
provision then in force. No breach of eligibility attached to the
surrender. The Corporation itself thereafter placed Katni for
fresh auction and accepted Dhanlaxmi as technically qualified.

52. Five bidders were qualified in Katni and the e-auction
generated successive bids. Sahakar itself participated in the
auction and entered a higher bid during the process. Dhanlaxmi
ultimately emerged H1 at ₹54,07,41,111, exceeding the reserve
price of ₹50 crore by ₹4,07,41,111. Learned Senior Counsel
submitted that there was no factual basis upon which such a
process could be described as devoid of competition.

53. It was urged that the mere fact that Dhanlaxmi had previously
offered ₹64.77 crore could not turn that amount into a
permanent minimum price for Katni. An earlier bidder which

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 24 of 56

had misjudged the commercial potential of a contract remained
liable for its earlier obligations until surrender took effect in
accordance with law, but its earlier commercial judgment could
not bind every future auction.

54. Learned Senior Counsel referred to the appellant’s pleaded
experience relating to demand, transportation costs,
operational expenses and actual quantities sold under the
earlier contract. He clarified, however, that the appellant’s case
did not depend upon establishing fault on the part of the
Corporation. Rule 16 did not require an MDO to prove breach
by the Corporation before exercising the surrender facility.

55. Attention was also drawn to the material concerning Mandla,
Anuppur and Balaghat, where subsequent tender values were
said to have been materially lower than the corresponding
earlier amounts. It was not submitted that the economics of
every district were identical. The material was relied upon to
demonstrate that a lower price following surrender had not,
under the earlier regime, invariably been treated as proof that
the later auction was unacceptable.

56. According to learned Senior Counsel, the ₹10,70,24,889
difference between Dhanlaxmi’s earlier and later bids was

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 25 of 56

merely the numerical difference between two tender rounds.
Before it could be characterised as a loss to the State, there had
to be some basis for treating the earlier annual return as one
which remained reasonably realisable in October 2025. No
contemporaneous valuation or market material of that nature
was referred to in the Board resolution.

57. It was therefore submitted that the High Court had approached
the matter from an incorrect premise. The proposition that H1
had no vested right was not disputed. What required
examination was whether the reason for rejecting the H1 result
was a lawful and sufficient reason. Clauses 6.6.3 and 26
preserved the power of rejection but did not place the exercise
of that power beyond Article 14.

ON BEHALF OF THE STATE AND THE CORPORATION

58. Shri Tushar Mehta, learned Solicitor General and Shri
Maninder Singh, learned Senior Counsel appearing on behalf
of Respondents, supported the judgment of the High Court.
They submitted that neither appellant had acquired any
enforceable right merely by emerging as H1. No Letter of
Intent had been issued and no agreement had been executed
pursuant to the September 2025 process. The tender conditions

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 26 of 56

specifically reserved to the Corporation the power not to accept
even the highest offer and to cancel the process.

59. Reliance was placed upon State of Uttar Pradesh and Others
v. Vijay Bahadur Singh and Others 6 , Haryana Urban
Development Authority and Others v. Orchid Infrastructure
Developers Private Limited 7 and the settled line of authority
emphasising the commercial latitude available to the State. It
was submitted that a court exercising judicial review could not
substitute its own view of the appropriate price for that of the
authority charged with administration of public mineral
resources.

60. Learned counsel further submitted that the present case was not
one of a speculative desire to obtain a higher price in the future.
The Board was faced with a specific pattern: the same
operators which had undertaken to pay substantially higher
annual amounts had surrendered their contracts and had
returned to the same district groups at materially reduced
prices. The reduction was approximately 29.98 per cent in
Shahdol and 16.52 per cent in Katni. The Corporation could

6
(1982) 2 SCC 365
7
(2017) 4 SCC 243

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 27 of 56

not reasonably be expected to ignore differences of this
magnitude when public revenue was involved.

61. It was submitted that the earlier and later opportunities were
not as dissimilar as the appellants suggested. The mine counts
and annual tendered quantities remained unchanged. Shahdol
continued to comprise 34 mines and 17,60,000 cubic metres;
Katni continued to comprise 49 mines and 20,00,000 cubic
metres. The Board was therefore entitled to regard the earlier
bid for the same group as highly relevant material.

62. Answering Sahakar in particular, learned counsel submitted
that the appellant had entered the earlier agreement with full
knowledge of the clearance position. The tender required
bidders to inspect the mines and satisfy themselves regarding
the prevailing circumstances. The Board agenda expressly
referred to the clearance litigation and to the Corporation’s
stand concerning permissions. It was therefore incorrect to
suggest that the comparison was made without noticing
Sahakar’s grievance.

63. The interim order dated 09.05.2025 was, in any event, said to
be only an interim arrangement and not a final declaration that
the Corporation had breached the agreement or that Sahakar

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 28 of 56

was entitled to rewrite its earlier financial commitment. The
appellant could not use an unresolved contractual dispute to
deprive its earlier bid of all relevance.

64. As regards Katni, learned counsel submitted that no
comparable deficiency in statutory permissions existed.
Dhanlaxmi had surrendered because its commercial
expectations had not materialised. While it was entitled to
invoke Rule 16, the Corporation was equally entitled to take
that conduct into account when the same contractor sought
reacquisition at a lower rate.

65. The reserve price, according to the respondents, was only a
threshold and not a promise of acceptance. A public authority
was free to reject an offer above reserve if the competent
authority considered that the public resource would otherwise
be disposed of at an inadequate return.

66. The respondents also disputed the relevance attributed to the
other district transactions. Sand groups differed in local
demand, transport conditions, permissions, timing, bidder
participation and commercial potential. No principle of
equality required every surrendered group to be treated
identically.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 29 of 56

67. Turning to the amendment of 30.01.2026, learned counsel
accepted that the new Rule was prospective but submitted that
the amendment merely supplied a stricter regulatory response
to a concern which already existed. The Board did not need the
amended Rule as the source of its power to cancel. That power
already existed under the tender, and the Board could
legitimately act to prevent a recurring surrender-and-
reacquisition pattern from depressing public revenue.

68. Golden Food Products (supra) was sought to be distinguished
on the ground that the authority there had compared materially
different properties and had cancelled substantially in the hope
of securing a higher future price. In the present case, the Board
compared successive bids for the same notified groups by the
same operators and on the same notified quantities. The
revenue concern was therefore said to be concrete rather than
speculative.

69. Learned counsel accordingly submitted that the High Court
was correct in refusing to interfere. The Board had before it the
earlier bids, the surrender history, the fresh auction results, the
Shahdol clearance dispute and the proposed regulatory
changes. On that material it took a commercial decision within

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 30 of 56

the powers reserved by the tender. A different view of the same
circumstances would not justify judicial substitution.

SUBSEQUENT BIDDERS

70. Learned counsel appearing for the applicants in the subsequent
Shahdol process submitted that developments after the
cancellation were also relevant to the form of relief. Following
the amendment, Shahdol was again tendered with an enhanced
reserve price and initial offers in the vicinity of ₹57 crore were
received. The applicants relied upon the substantial securities
deposited by them and submitted that the later process
demonstrated the possibility of materially higher revenue.

71. It was urged that, even if some infirmity were found in the
earlier decision, the Court ought not to restore the 2025 result
in disregard of the subsequent competition. The proper course,
according to the applicants, would be to allow the later process
to reach its conclusion.

72. Learned Senior Counsel for the appellants answered that the
subsequent participants entered the process during pendency of
the present challenge and subject to the order dated 25.03.2026
restraining finalisation without leave of this Court. No

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 31 of 56

concluded allotment had arisen in their favour. Their
participation, it was submitted, could not validate the earlier
cancellation if that cancellation were otherwise found
unsustainable.

73. We have considered the rival submissions.

QUESTIONS FOR CONSIDERATION

74. On the pleadings, the material placed before us and the
submissions advanced at the Bar, the controversy may be
confined to two questions. The first is whether the Madhya
Pradesh State Mining Corporation Limited was justified in
rejecting the highest bids received for the Shahdol and Katni
groups and cancelling the e-tender-cum-auction dated
18.09.2025, principally because the appellants, after
surrendering their earlier contracts for the same groups, had
returned to the fresh auction at substantially lower rates? The
second, which would arise if the cancellation is found
unsustainable, is the consequential relief to which the
appellants would be entitled, having regard also to the
subsequent tender process initiated during the pendency of the
proceedings?

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 32 of 56

ANALYSIS AND CONSIDERATION:

75. Before examining the decision of the Board dated 19.11.2025,
it would be useful to notice the settled principles governing
State action in the award of public contracts. The law in this
field has never proceeded on the footing that every highest
bidder acquires a right to the contract. Equally, it has never
accepted that the State, merely because it is acting in a
commercial field, is at liberty to exercise its discretion as a
private individual might. A public authority is undoubtedly
entitled to protect its commercial interests, to secure a fair
return for public property and, where the circumstances so
require, to reject even the highest offer. That power, however,
remains public power and must be exercised consistently with
Article 14 of the Constitution.

76. The principle may be traced to Ramana Dayaram Shetty v.
International Airport Authority of India and Others8, where
this Court held that the Government and its instrumentalities
cannot distribute State largesse by standards which are
arbitrary or departed from at will. M/s. Star Enterprises and
Others v. City and Industrial Development Corporation of

8
(1979) 3 SCC 489

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 33 of 56

Maharashtra Ltd. and Others.9, carried the principle into the
field of rejection of highest offers and recognised that,
notwithstanding a contractual reservation permitting rejection,
the action of a public authority must remain capable of being
supported by reasons germane to the decision. In Food
Corporation of India v. Kamdhenu Cattle Feed Industries
(supra), it was again emphasised that the highest tenderer has
no absolute right to acceptance, but that legitimate expectation
arising from the manner in which a public authority conducts a
tender is one facet of the requirement that State action be fair
and non-arbitrary.

77. The corresponding restraint to be exercised by courts was
explained in Tata Cellular v. Union of India (supra). Judicial
review is concerned with the legality of the decision-making
process and not with substitution of the Court’s own
commercial judgment for that of the competent authority.
Government must be afforded freedom of contract and a
reasonable degree of fair play in the joints. The same approach
runs through Jagdish Mandal v. State of Orissa and Others10,
Michigan Rubber (India) Limited v. State of Karnataka and

9
(1990) 3 SCC 280
10
(2007) 14 SCC 517

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 34 of 56

Others11, Silppi Constructions Contractors v. Union of India
and Another 12, and N.G. Projects Limited v. Vinod Kumar
Jain and Others13. These decisions counsel restraint where the
challenge is merely to the wisdom of a commercial choice.
They do not exclude interference where the decision proceeds
upon a consideration which does not reasonably sustain the
conclusion reached.

78. The High Court has relied upon Haryana Urban Development
Authority v. Orchid Infrastructure Developers Private
Limited (supra). There can be no quarrel with the proposition
that an H1 bidder does not acquire a vested right merely by
submitting the highest offer and that, until acceptance by the
competent authority, no concluded contract may arise. What is
equally instructive in Orchid Infrastructure (supra), however,
is that the rejection there was supported by material concerning
auction trends, comparable sites and prevailing prices. The
decision therefore illustrates both sides of the principle: the
absence of an enforceable right merely from H1 status and the

11
(2012) 8 SCC 216
12
(2020) 16 SCC 489
13
(2022) 6 SCC 127

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 35 of 56

necessity of relevant material when the public authority
concludes that the highest bid is inadequate.

79. More recently, in M.P. Power Management Company Ltd. v.
Sky Power Southeast Solar India Pvt. Ltd. (supra), this Court
reiterated that the State does not cease to be subject to Article
14 merely because the controversy has entered the contractual
field. In Subodh Kumar Singh Rathour v. Chief Executive
Officer (supra), the Court also cautioned against treating the
possibility of greater monetary return as exhaustive of public
interest. Public revenue is undoubtedly an important
consideration, but so too are fairness in State action, certainty
in public dealings and the integrity of processes by which the
State invites private parties to compete for public
opportunities.

80. The decision having the closest bearing upon the present
controversy is Golden Food Products India v. State of Uttar
Pradesh (supra). There, an auction which had produced an
offer above the reserve price was cancelled by reference to
prices realised for other properties and upon an expectation that
a greater amount might be secured. This Court held that an
auction conducted in accordance with law carries a sanctity
which cannot be disregarded merely because the authority

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 36 of 56

thereafter considers that a higher figure might have been
desirable. The highest bid may certainly be rejected, but the
reason for rejection must bear a rational relation or nexus to the
subject matter and circumstances of the auction actually
conducted.

81. These decisions, read together, yield a principle which is by
now well settled. An H1 bidder has no indefeasible right to
insist upon award. The tendering authority may reject the
highest offer and may, in an appropriate case, cancel the
process altogether. A reserve price is a threshold and not a
promise of allotment. At the same time, the reservation of such
power in the tender conditions does not place its exercise
beyond judicial review. Where the decision is challenged, the
Court is entitled to examine whether the consideration which
moved the public authority was relevant; whether the material
before it reasonably supported the conclusion; and, whether the
power was exercised consistently with the constitutional
requirement of non-arbitrariness.

82. The answer must begin with the legal regime under which the
fresh process was undertaken. Rule 16, as it stood during 2025,
expressly contemplated surrender by an MDO on three months’
notice, subject to the requirements prescribed therein. Upon

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 37 of 56

receipt of the surrender application, the Corporation was
required to initiate re-tendering. The Rule did not then provide
that the surrendering MDO was disqualified from participating
in the fresh tender for the same group. Nor did it prescribe that,
if the former MDO did participate, its bid could not be lower
than the amount quoted under the earlier agreement. The
consequences attaching to surrender were therefore those
which the law and the contract then provided and no further
disability could be presumed merely because the earlier
arrangement had ended in surrender.

83. This assumes greater significance because the Corporation did
not discover either the surrender or the identity of the
appellants after completion of the auction. Proposals for
strengthening the surrender regime were already under
consideration before 18.09.2025. The Board was aware of that
position when, at its 281st meeting held on that date, it
nevertheless decided that selection of MDOs for Shahdol,
Katni and the other identified groups should proceed under the
Rules then prevailing so as to maintain continuity in the supply
of sand. The fresh tender was issued in pursuance of that
decision. Sahakar and Dhanlaxmi participated openly, their

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 38 of 56

technical eligibility was scrutinised and accepted and they were
permitted to compete in the auction.

84. The auctions which followed generated actual competition.
Seven bidders were technically qualified for Shahdol and five
for Katni. Sahakar’s initial offer of ₹46.80 crore in Shahdol was
followed by successive bids until its final offer of
₹48,20,40,000 remained H1. In Katni, the bidding similarly
progressed beyond the initial offers and Dhanlaxmi ultimately
emerged H1 at ₹54,07,41,111. The Board did not record any
finding of cartelisation, collusion, suppression of competition,
manipulation of the electronic platform or defect in the
prescribed procedure. Nor was either appellant found
technically ineligible. The process which the Corporation had
itself chosen for price discovery had therefore proceeded in
accordance with its terms.

85. This did not oblige the Corporation to accept the result. It did,
however, require some material to explain why the result of
that competition was commercially unacceptable. An earlier
bid may well be relevant to such an enquiry. It may indicate
that the same asset had previously attracted a higher
commitment and may warrant a closer examination of whether
the later competition was satisfactory. But a previous bid is not,

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 39 of 56

by itself, a continuing adjudication of market value. It records
what a bidder undertook to pay in an earlier contractual setting.
The liabilities arising from that bargain remain enforceable
according to its terms, but the amount once quoted does not
thereby become an immutable minimum for every subsequent
auction of the same district group.

86. The distinction becomes clearer when the nature of the fresh
tender is kept in view. The September 2025 process did not
merely transfer the unexpired residue of the earlier agreements.
It contemplated a fresh contractual tenure under Rule 9. The
earlier and later figures were therefore annual bids made in
separate tender rounds. Before the difference between them
could be characterised as the loss which acceptance of the fresh
bids would occasion, there had to be some basis for concluding
that the earlier return remained reasonably obtainable from the
fresh opportunity or that the new auction had otherwise failed
to produce an acceptable present value. The Board resolution
does not disclose that intermediate assessment.

87. No contemporaneous valuation demonstrating that ₹48.20
crore for Shahdol or ₹54.07 crore for Katni was below the
value reasonably obtainable in October 2025 is referred to. Nor
is there reliance upon current comparable auctions showing

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 40 of 56

that either group should have yielded an amount approximating
the earlier bid. The resolution compares the historical and
current figures, notes the percentage reduction and proceeds to
the conclusion that the fresh rates are non-competitive. The
numerical difference is beyond dispute; what is absent is the
material which would convert that difference into proof of the
current inadequacy of the bids.

88. The Shahdol facts illustrate the difficulty with particular
clarity. Sahakar’s earlier agreement itself had become the
subject of litigation concerning the extent of the mining
opportunity available with the requisite statutory permissions.
The tendered group comprised 34 mines and an annual quantity
of 17,60,000 cubic metres, while the Corporation’s pleadings
recorded environmental clearances for 23 mines corresponding
to approximately 14,86,630 cubic metres. Sahakar had
approached the High Court in Writ Petition No.15714 of 2025
and, by the interim order dated 09.05.2025, its payment
obligation had, for the time being, been related to actual
extraction from the available quantity for which environmental
clearance had been obtained. That dispute preceded the
surrender dated 11.07.2025 and formed part of the history of
the earlier agreement.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 41 of 56

89. It is neither necessary nor appropriate in these appeals to
pronounce upon whether the Corporation was in breach of that
agreement or whether Sahakar’s financial obligations under the
earlier contract stood reduced. The Corporation has maintained
that Sahakar was aware of the status of the clearances and the
Board material itself noticed that contention. The relevance of
the earlier litigation is narrower. It demonstrates that the annual
bid of ₹68.84 crore arose in an operational setting which had
already become the subject of a genuine dispute concerning the
extent to which the tendered opportunity was available in
practice. In those circumstances, the earlier figure could not,
merely by reason of its existence, be treated as establishing the
amount which the State could reasonably expect from a fresh
Shahdol tender in October 2025.

90. The Katni case does not carry the same factual feature. The
Corporation has specifically maintained that the requisite
permissions were available and Dhanlaxmi’s later explanation
for surrender refers instead to commercial non-viability,
demand, transportation costs and the actual experience of
operating the contract. We do not propose to determine
whether the earlier Katni venture was in fact commercially
unviable or whether Dhanlaxmi had misjudged the economics

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 42 of 56

when it submitted its earlier bid. What is relevant is that Rule
16 did not make proof of default by the Corporation a condition
for surrender. Once Katni was lawfully re-tendered and
Dhanlaxmi was permitted to participate in an auction which
generated competition, the earlier annual bid of ₹64.77 crore
could not, without some further material, be regarded as the
continuing measure of the value which the fresh process ought
to have realised.

91. The reserve prices form another part of the same factual setting.
Shahdol was placed to auction at a reserve price of ₹44 crore
and Katni at ₹50 crore. The eventual H1 bids exceeded those
figures by ₹4,20,40,000 and ₹4,07,41,111 respectively. We
agree with the respondents that a reserve price does not oblige
the authority to accept every bid above it. There may be sound
reasons for rejecting an above-reserve offer. What is significant
here is that the Corporation consciously invited competition
above those notified thresholds, allowed the bidding process to
reach its conclusion and thereafter treated the appellants’ own
earlier offers, which did not form part of the conditions of the
fresh auction, as the decisive measure against which the new
bids were found wanting.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 43 of 56

92. The subsequent amendment dated 30.01.2026 must also be
understood in this chronology. The amended Rule 16 expressly
introduced a restriction preventing the surrendering MDO and
its proprietor, director or partner from participating in the same
group for the prescribed three-year period. It also created a
mechanism for adjustment and recovery of loss arising upon
re-tendering, while the upset-price arrangement applicable to
surrendered groups was altered. The policy behind the
amendment is readily understandable and nothing in the
present judgment questions either its wisdom or validity. Its
importance for these appeals lies in the fact that the very
disability thereafter expressly enacted did not form part of the
regime under which the September 2025 tender was issued and
conducted.

93. The respondents fairly accept that the amended Rule operates
prospectively. It may therefore regulate tenders to which it
lawfully applies, but it cannot retrospectively render the
appellants ineligible for a process in which they were eligible
when their bids were invited and evaluated. Nor can the
subsequent mechanism for recovery of loss convert every
difference between an earlier and later bid into a loss already
established under the earlier regime. Any liability arising from

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 44 of 56

the surrendered contracts must be determined in accordance
with the Rules, agreements and proceedings applicable to those
contracts.

94. We are equally unable to accept that the invocation of public
revenue concludes the matter. Sand is a public mineral resource
and the Corporation is under an obligation to protect the
financial interests of the State. A reliable valuation
demonstrating material undervaluation, evidence of collusion
or artificially depressed bidding, absence of effective
competition, or a genuine supervening policy decision may
furnish ample justification for rejection of even an above-
reserve H1 offer. Public interest, however, must emerge from
the material on which the decision is taken. In the present case,
the Board established that the appellants’ current bids were
materially lower than their earlier bids. It did not establish that
the current bids were materially lower than the value which the
State could reasonably expect to obtain from the market in
October 2025. Those are not the same conclusions.

95. The material relating to Mandla, Anuppur, Balaghat and other
districts does not require detailed adjudication. Sand groups
situated in different districts may vary considerably in quantity,
permissions, demand, transport conditions and commercial

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 45 of 56

potential. We would therefore not rest the result upon an
assumption that all district groups must be treated alike. The
other district material has a more limited relevance: it
demonstrates that surrender followed by a lower subsequent
offer was a phenomenon with which the administration had
already dealt under the earlier regime. The validity of the
cancellation before us must nevertheless be tested upon the
reasons pertaining to Shahdol and Katni themselves.

96. The later process initiated after amendment of the Rules also
cannot determine the legality of the decision taken on
19.11.2025. It is true that the subsequent Shahdol process
attracted initial offers in the vicinity of ₹57 crore, materially
higher than Sahakar’s 2025 final bid. That circumstance
supports the respondents’ submission that a later process was
capable of producing a higher figure. It arose, however, under
an altered reserve price, an amended regulatory regime and at
a later point of time; moreover, the competitive auction had not
culminated in a final allotment. Equally, the absence of bids for
Katni at the later enhanced reserve price does not by itself
establish that the earlier cancellation was unlawful. Subsequent
events may appropriately be taken into account while moulding
relief, but legality of the impugned decision must primarily

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 46 of 56

depend upon the reasons and material which existed when it
was made.

97. Viewed in this manner, the error in the approach of the High
Court becomes apparent. The High Court was correct in
holding that the appellants acquired no vested right merely
because they had emerged H1 and that Clauses 6.6.3 and 26
reserved a wide discretion in favour of the Corporation. The
question, however, did not end with the existence of that
discretion. The Court was required to examine whether the
reason for its exercise was sufficient in the circumstances of
the fresh auction. By treating the difference between the earlier
and later bids as the corresponding loss to the exchequer, the
High Court proceeded upon the same assumption as the Board,
namely that the earlier annual bids remained the appropriate
measure of what ought to have been realised under the
September 2025 process. The material placed before it did not
establish that premise.

98. The reliance placed by the appellants upon Golden Food
Products (supra) must be understood in that setting. The facts
there were not identical and, unlike the present case, the
comparison was between properties of materially different
sizes. The principle, however, remains apposite. A numerical

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 47 of 56

comparator does not become sufficient merely because it
exists; the comparison must bear a rational nexus with the
subject and circumstances of the auction whose result is sought
to be discarded. Here, the earlier offers were relevant and the
reductions were substantial, but they were treated as
determinative without the further assessment necessary to
show why the fresh competitive outcome was unacceptable.

99. We are therefore satisfied that the decision of the Board dated
19.11.2025 cannot be sustained insofar as it rejects the Shahdol
and Katni bids. The conclusion does not proceed on the footing
that an H1 bidder possesses an absolute right to allotment or
that a bid exceeding reserve must invariably be accepted. It
follows from the particular course disclosed by the record:
surrender was expressly contemplated by the law then in force;
re-participation was not prohibited; the Board knowingly
decided to re-tender under the existing regime notwithstanding
the proposed amendments; several bidders actually competed;
no infirmity in the competition was identified; and the eventual
bids were rejected principally because they were lower than the
appellants’ own earlier bids, without the further material
necessary to establish that the earlier amounts continued to

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 48 of 56

represent the revenue reasonably obtainable in the fresh
auction.

100. The first question is accordingly answered in favour of the
appellants. The Board decision dated 19.11.2025 and the
cancellation communicated on 05.12.2025, insofar as they
concern the Shahdol and Katni groups, are liable to be set aside.
The common judgment dated 18.03.2026 affirming that action
cannot consequently be sustained.

RELIEF

101. We may now consider the appropriate consequential order.
The respondents urged that, even if the cancellation were found
unsustainable, the matter should be remitted to the Corporation
for reconsideration. Ordinarily, where interference is
occasioned because some relevant material has not been
considered or because a fresh technical or commercial
evaluation remains necessary, remand may be the proper
course. The present case, however, does not stand at such an
intermediate stage. The Corporation invited the bids,
scrutinised technical eligibility, conducted the financial

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 49 of 56

auction, determined H1 in both groups and thereafter took a
conscious decision to reject those results. The material and
reasons which led to the rejection have been placed before the
High Court and before us. No further evaluation of the
completed auction remains to be undertaken on any ground
which formed part of the impugned decision.

102. The reason upon which the Board acted has now been
examined and found insufficient. A remand cannot be ordered
merely to permit the authority to reconsider the very
comparison which has failed judicial scrutiny. Nor, after the
decision has been defended throughout upon identified
grounds, would it be appropriate to leave the completed
process open for the discovery of entirely new reasons for
rejecting the same bids. Such a course would render the relief
upon a successful challenge largely illusory.

103. The appellants, on their part, must stand by the bids on the
basis of which they seek restoration. Sahakar cannot seek
restoration of the 2025 process while withdrawing from its
final annual offer of ₹48,20,40,000, nor can Dhanlaxmi seek
the benefit of the judgment while resiling from its offer of
₹54,07,41,111. The passage of time during pendency of the
litigation does not entitle either appellant to a reduction in its

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 50 of 56

bid or relaxation of an essential tender condition. The
consequence of setting aside the cancellation is restoration of
the process which was interrupted, not creation of a fresh
commercial arrangement.

104. The absence of a Letter of Intent prior to cancellation does
not lead to a contrary result. We have already accepted that H1
status by itself did not constitute a concluded contract. The
relief now granted does not proceed upon specific performance
of an agreement which had already come into existence. Once
the unlawful rejection is set aside, the tender process stands
restored to the stage immediately preceding that rejection. The
remaining steps contemplated by the tender must thereafter be
completed in accordance with its terms, subject to fulfilment
by the appellants of the deposits, securities and other
requirements which remained outstanding.

105. The subsequent auction does not make such restoration
impracticable. On 25.03.2026, this Court expressly directed
that the fresh auction process insofar as Shahdol and Katni
were concerned should not be finalised without leave. The
applicants in the later Shahdol process therefore participated
subject to the subsisting challenge and the order of this Court.
Their deposits and legitimate expectation of participation

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 51 of 56

deserve protection, but the later process had not culminated in
a final allotment or a concluded contractual right. Their
participation cannot render irreversible an antecedent
cancellation which has now been found unsustainable.

106. The higher initial figures said to have been received in the
later Shahdol process do not persuade us to preserve that
process in preference to the 2025 auction. As already noticed,
those figures arose in a different regulatory setting and after
enhancement of the reserve price. To permit the later process
to defeat the appellants’ relief merely because it subsequently
attracted a higher initial response would in substance allow a
later event to validate retrospectively the cancellation under
challenge. The legality of the earlier decision having been
determined on the contemporaneous record, the relief must
ordinarily follow that determination.

107. At the same time, restoration of the 2025 process cannot be
understood as enlarging the appellants’ rights beyond the tender
itself. It does not extinguish any dues or liabilities which may
independently survive under the earlier surrendered contracts,
nor does it dispense with the mining plans, environmental
clearances, consents or other statutory permissions necessary
for lawful extraction. Questions relating to accounts,

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 52 of 56

permissible recoveries or liabilities under the former
agreements remain open to be determined in accordance with
law in the proceedings competent to decide them. The relief in
these appeals is confined to the cancellation of the fresh tender
process.

ORDER

108. In the result, the Appeals are allowed. The common judgment
dated 18.03.2026 passed by the High Court of Madhya Pradesh
at Jabalpur in Writ Petition No.48901 of 2025 and Writ Petition
No.1880 of 2026 is set aside. The decision of the Board of
Directors of the Madhya Pradesh State Mining Corporation
Limited dated 19.11.2025 and the cancellation communicated
on 05.12.2025 are quashed insofar as they reject the bids of the
appellants and cancel the e-tender-cum-auction conducted
pursuant to Notice No. Sand/Tender/2025-26/406 dated
18.09.2025 in respect of the Shahdol and Katni sand groups.
No other part of the Board’s decision is disturbed.

109. The tender process dated 18.09.2025 shall stand restored in
respect of Shahdol and Katni. Within two weeks from today,

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 53 of 56

Sahakar Global Limited and Dhanlaxmi Merchandise Private
Limited shall communicate to the Corporation their
unconditional willingness to stand by their respective final bids
dated 10.10.2025, namely ₹48,20,40,000 for Shahdol and
₹54,07,41,111 for Katni, and to comply with the remaining
requirements of the tender.

110. Upon receipt of such communication, the Corporation shall,
within a further period of two weeks, intimate the respective
appellant of the deposits, bank guarantees, performance
securities and other formalities remaining to be completed
under the restored process. In the event any security furnished
earlier has expired or been released during pendency of these
proceedings, the concerned appellant shall furnish equivalent
security in the form required by the tender within the period
stipulated by the Corporation.

111. Upon due compliance, the Corporation shall complete the
consequential approval and allotment process, including
issuance of the requisite Letter of Intent or other consequential
instrument and execution of the agreement, within six weeks
thereafter. The bids shall not be rejected afresh on the ground
that the appellants surrendered their earlier contracts, that their
October 2025 offers were lower than their previous bids, or by

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 54 of 56

applying retrospectively to the completed 2025 auction the
participation restriction introduced on 30.01.2026.

112. The subsequent tender process initiated under the notice dated
10.02.2026 shall not be carried further insofar as Shahdol and
Katni are concerned. The deposits and bank guarantees
furnished by participants in that process for these two groups
shall be returned or released by the Corporation within four
weeks, subject to any liability independently arising otherwise
than from the controversy adjudicated herein. The later
process, insofar as it concerns other groups, shall remain
unaffected.

113. We clarify that nothing stated herein adjudicates the accounts,
dues, permissible recoveries or other disputes arising out of the
earlier contracts surrendered by Sahakar or Dhanlaxmi. Those
matters shall be determined in accordance with the respective
agreements, the Rules applicable thereto and any orders passed
in proceedings concerning them. Nothing in this judgment
shall also be understood as questioning the validity of the
amendments notified on 30.01.2026 or restricting their
operation in cases to which they lawfully apply.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 55 of 56

114. The applications for intervention and impleadment filed by
the subsequent bidders stand disposed of in the above terms.
All other pending applications shall also stand disposed of.
There shall be no order as to costs.

…………………………………………….J.
[ARAVIND KUMAR]

.…………………………………………….J.
[VIPUL M. PANCHOLI]

NEW DELHI;
OCTOBER 14th, 2026.

SLP (C) No.11388 of 2026 with
SLP (C) No.11160 of 2026 Page 56 of 56