2026 INSC 1135
Sharma Enterprises (Ms.) v. National Building Construction Corporation
Full text
[2026] 10 S.C.R. 450 : 2026 INSC 1135
MS Sharma Enterprises
v.
National Building Construction Corporation
(Civil Appeal No. 13782 of 2026)
15 October 2026
[Aravind Kumar and Vipul M. Pancholi,* JJ.]
Issue for Consideration
Whether Clause 26 of the Special Conditions of the Contract
operated as a contractual bar within the meaning of s.31(7)(a)
of the Arbitration and Conciliation Act, 1996 barring the Arbitral
Tribunal from awarding pre-reference and pendente lite interest
on the substantive claims allowed in favour of the appellant.
Headnotes†
Arbitration and Conciliation Act, 1996 – ss.31(7)(a), 34 –
Division Bench dismissed the appeal preferred by the
appellant u/s.37, upholding the judgment of the Single Judge
by the petition filed by the respondent u/s.34 was partly
allowed by setting aside the arbitral award to the extent it
awarded pre-reference and pendente lite interest in favour of
the appellant – Whether Clause 26 of the Special Conditions
of the Contract (SCC) operated as a contractual bar within
the meaning of s.31(7)(a) barring the Arbitral Tribunal from
awarding pre-reference and pendente lite interest on the
substantive claims allowed in favour of the appellant –
Challenge to:
Held: No error in the impugned judgment – Contention on
behalf of the appellant that the concluding phrase “or otherwise”
of Clause 26 of the SCC must be interpreted applying the
principles of ejusdem generis and noscitur a sociis to take colour
from the preceding expressions concerning delay in releasing
monthly or final payments and the expression “or otherwise” is
restricted to withholding interest on delayed interim bills and
cannot operate as an absolute bar against the grant of interest
on substantive claims allowed by the Arbitral Tribunal, rejected
– Doctrine of ejusdem generis becomes applicable only where
* Author
[2026] 10 S.C.R. 451
MS Sharma Enterprises v.
National Building Construction Corporation
the preceding terms of the general phrase follow a specific class
forming a genus, thereby imparting the specific character to the
subsequent general phrase – Where the provisions in a contract
are disjunctively joined by the word “or”, every such phrase has
to be examined independently due to its wide amplitude – In
Clause 26 of the SCC, the preceding terms of the phrase “or
otherwise” do not constitute a single, narrow genus restricted to
delayed running payments and also include balance payments,
withheld deposits and amounts withheld due to disputes –
Consequently, the expression “or otherwise” is residuary in nature
and has been consciously incorporated with wide amplitude to
encompass every other conceivable circumstance under which
a claim for interest might be asserted against the Corporation –
The words “or otherwise” cannot be restricted by reference to
the preceding expressions and are words of extension and not
limitation – Thus, restricting the scope of the expression “or
otherwise” to only delays in monthly or final payments would
render the term redundant and would amount to rewriting
the contract entered into between the parties – Furthermore,
s.31(7)(a) is expressly subject to the contract between the parties
whereas, s.31(7)(b) provides for grant of post-award interest
unless the arbitral tribunal orders otherwise – Therefore, High
Court rightly recognized this statutory distinction and restricted
its interference to setting aside the pre-reference and pendente
lite interest, while maintaining the award of post-award interest
in favour of the appellant – Thus, the Arbitrator, being a creature
of the contract, acted beyond his jurisdiction in granting pre-
reference and pendente lite interest in contravention of Clause
26 of the SCC, which attracts s.31(7)(a) of the 1996 Act – High
Court rightly acted u/ss.34 and 37 in setting aside the arbitral
award to that limited extent, while maintaining the substantive
claims of the appellant and post-award interest in favour of the
appellant. [Paras 11-14, 17, 18]
Case Law Cited
Oil and Natural Gas Corporation Ltd. v. G&T Beckfield Drilling
Services Pvt. Ltd. [2025] 9 SCR 507 : 2025 SCC OnLine SC
1888 – held not applicable.
Sayeed Ahmed and Company v. State of Uttar Pradesh &
Ors. [2009] 10 SCR 841 : (2009) 12 SCC 26; Ferro Concrete
452 [2026] 10 S.C.R.
Supreme Court Reports
Construction (India) Pvt. Ltd. v. State of Rajasthan [2025] 4
SCR 529 : 2025 SCC OnLine SC 708; Jaiprakash Associates
Limited (JAL) Through its Director v. Tehri Hydro Development
Corporation (India) Limited (THDC) Through its Director [2019] 2
SCR 41 : (2019) 17 SCC 786; Union of India v. Larsen & Toubro
Limited, 2026 INSC 203; Union of India v. Manraj Enterprises
[2021] 7 SCR 413 : (2022) 2 SCC 331; Union of India v. Bright
Power Projects (India) Private Limited [2015] 6 SCR 488 : (2015)
9 SCC 695; Sree Kamatchi Amman Constructions v. Divisional
Railway Manager (Works) [2010] 10 SCR 487 : (2010) 8 SCC
767; Lilavati Bai v. State of Bombay [1957] 1 SCR 721 : (1957)
1 SCC 411 – referred to.
List of Acts
Punjab Police Rules, 1934.
List of Keywords
Section 37 of the Arbitration and Conciliation Act, 1996;
Section 31(7)(a) of the Arbitration and Conciliation Act, 1996;
Section 31(7)(b) of the Arbitration and Conciliation Act, 1996;
Section 34 of the Arbitration and Conciliation Act, 1996; Pre-
reference interest; Pendente lite interest; Special Conditions of
the Contract (SCC); “or otherwise”; Principles of ejusdem generis;
Noscitur a sociis; Contractual prohibitions on interest; Contract
prohibited granting pendente lite interest; Contractual bar.
Case Arising From
CIVIL APPELLATE JURISDICTION: Civil Appeal No. 13782
of 2026
From the Judgment and Order dated 20.03.2026 of the High
Court at Delhi at New Delhi in FAO (OS) (COMM) No. 18 of 2026
Appearances for Parties
Advs. for the Appellant(s):
Siddhartha Dave, Sr. Adv., Ms. Anusurya Salwan, Deepak Goel,
Nishant Kumar, Shailesh Sharma.
Advs. for the Respondent(s):
Ms. Shilpi Chowdhary, Amarkant Patel, Akhilanad Tripathi.
[2026] 10 S.C.R. 453
MS Sharma Enterprises v.
National Building Construction Corporation
Judgment / Order of the Supreme Court
Judgment
Vipul M. Pancholi, J.
1. Leave granted.
2. The present appeal challenges the final judgment and order dated
20.03.2026 passed by the Division Bench of the High Court of Delhi
in FAO(OS) (COMM) No. 18 of 2026. By the impugned judgment,
the Division Bench dismissed the appeal preferred by the appellant
under Section 37 of the Arbitration and Conciliation Act, 1996
(hereinafter referred to as “the 1996 Act”), upholding the judgment
of the learned Single Judge dated 19.11.2025 in O.M.P. (COMM)
No. 215 of 2022. The learned Single Judge had partly allowed the
petition filed by the respondent under Section 34 of the 1996 Act
by setting aside the arbitral award dated 28.07.2016 to the extent
it awarded pre-reference and pendente lite interest in favour of the
appellant.
3. The dispute between the parties has a long history spanning over
three decades. As per the pleadings of the parties, the factual matrix
of the present case is as under:
3.1. The respondent, National Building Construction Corporation
Limited (hereinafter referred to as “NBCC”) was awarded
works by the Indian Railway Construction Company Limited
(hereinafter referred to as “IRCON”). On 11.01.1991, the
respondent awarded a sub-contract to the appellant, M/s
Sharma Enterprises, for executing flooring and cladding
works at Vashi Railway Station-cum-Commercial Complex,
New Bombay (now Navi Mumbai), for an agreed contractual
sum of Rs.9,50,73,603.20. The works were to be completed
within a period of two years, with the stipulated completion
date being 10.01.1993.
3.2. The execution of the sub-contracted flooring and cladding
works was intrinsically dependent upon the completion of
civil works by M/s Mohinder Singh & Co., which is the civil
contractor engaged by the respondent. On account of delays
and non-completion of civil works, the appellant could execute
only limited areas. The appellant completed the priority platform
454 [2026] 10 S.C.R.
Supreme Court Reports
areas in time for inauguration on 09.05.1992. However, on
22.09.1992, the respondent issued notices and formally
terminated the contract, subsequently encashing the bank
guarantees of the appellant.
3.3. The appellant invoked the arbitration clause being Clause 10
of Special Conditions of the Contract (hereinafter referred to as
“the SCC”) and sought the appointment of an arbitrator, however,
the respondent did not appoint an arbitrator. Thereafter, the
appellant approached the High Court under Section 20 of the
Arbitration Act, 1940 (hereinafter referred to as “the 1940 Act”)
for appointment of an arbitrator. Following several rounds of
litigation, this Court, by order dated 03.08.2011 in Civil Appeal
No. 6341 of 2011, appointed the learned Arbitrator to adjudicate
all claims and counter-claims of the parties.
3.4. On 28.07.2016, the learned Arbitrator rendered an award
holding that the respondent had wrongfully terminated the
contract and had failed to provide the requisite work fronts.
Consequently, the learned Arbitrator:
● Allowed Claim No. 1(a) for executed work to the extent
of Rs.45,653.15,
● Allowed Claim No. 1(b) towards extra items (differing
varieties/shades of granite and specialised cladding) to
the tune of Rs.26,03,465/-,
● Allowed Claim No. 2 towards bank guarantee extension
charges to the extent of Rs.2,77,500/-,
● Allowed Claim No. 3 directing refund of the encashed
bank guarantee towards security deposit amounting to
Rs.19,01,480/-,
● Awarded costs of litigation quantified at Rs.5,00,000/-
under Claim No. 6,
● Rejected all counter-claims preferred by the respondent,
and
● Awarded interest under Claim No. 7 at the rate of 10%
per annum on the awarded sums (except costs) with
effect from 22.09.1992 until actual payment, i.e., pre-
reference, pendente lite and post-award periods.
[2026] 10 S.C.R. 455
MS Sharma Enterprises v.
National Building Construction Corporation
3.5. In M/s Sharma Enterprises v. N.B.C.C. (India) Ltd. (Civil Appeal
Nos. 7701-7702 of 2021, decided on 15.12.2021), this Court
resolved the issue of the applicable statutory framework to the
proceedings and held that the arbitration proceedings were
governed by the 1996 Act and not the 1940 Act.
3.6. Thereafter, the respondent challenged the arbitral award dated
28.07.2016 under Section 34 of the 1996 Act before the High
Court in O.M.P. (COMM) No. 215 of 2022. By judgment dated
19.11.2025, the learned Single Judge upheld the arbitral
award on all substantive claims, holding that the findings of
the learned Arbitrator were findings of fact based on appraisal
of evidence, requiring no interference under Section 34 of
the 1996 Act. However, the learned Single Judge set aside
the award of pre-reference and pendente lite interest on the
ground that Clause 26 of the SCC operated as an absolute
bar against the grant of interest, relying upon the decision of
this Court in Sayeed Ahmed and Company v. State of Uttar
Pradesh & Ors.1
3.7. The appellant challenged the judgment dated 19.11.2025
passed by the learned Single Judge under Section 37 of
the 1996 Act before the Division Bench of the High Court in
FAO(OS) (COMM) No. 18 of 2026. Vide the impugned judgment
dated 20.03.2026, the Division Bench dismissed the appeal and
held that the inclusion of the phrase “or otherwise” in Clause 26
of the SCC was analogous to the phrase “or any other respect
whatsoever” interpreted in Sayeed Ahmed (supra), thereby
constituting a comprehensive bar on pendente lite interest.
3.8. Aggrieved thereby, the appellant has filed the present appeal.
4. Mr. Siddhartha Dave, learned senior counsel appearing on behalf
of the appellant, submitted that the present appeal challenges the
impugned judgment, affirming the judgment of the learned Single
Judge, in so far as it sets aside the arbitral award with respect to
payments of interest under Claim No. 7 of the arbitral award by
holding that Clause 26 of the SCC barred payment of interest.
Learned counsel made the following submissions:
1 (2009) 12 SCC 26.
456 [2026] 10 S.C.R.
Supreme Court Reports
4.1. It is submitted that the arbitral tribunal held that the termination
of contract by the respondent was illegal and arbitrary, directed
the return of the bank guarantee amounts and further awarded
claim towards cost of extra items executed by the appellant.
It is stated that there was no specific bar to award pendente
lite interest on the said claims. It is further contended that the
respondent did not rely upon Clause 26 of the SCC before the
Arbitral Tribunal to dispute the award of interest.
4.2. It is submitted that Clause 26 of the SCC can neither be read
in isolation nor can be given an artificially expansive meaning.
It is stated that the settled principles of ejusdem generis and
noscitur a sociis are applicable in the present case. The
concluding words of Clause 26 of the SCC “or otherwise”
follow and qualify the preceding expressions relating to the
holding up of balance payments or deposits and delay in
making monthly or final payments. It is contended that “or
otherwise” cannot be construed as an absolute prohibition
against pendente lite interest, as such an interpretation would
convert a clause dealing with delayed contractual payments
into a blanket prohibition against pendente lite interest on
every claim arising under the contract.
4.3. It is further submitted that the courts below wrongly interpreted
Clause 26 of the SCC as prohibiting interest, because had the
parties intended to impose such an absolute prohibition, the
parties would have employed clear and unequivocal language
to that effect.
4.4. Reliance is placed upon Oil and Natural Gas Corporation
Ltd. v. G&T Beckfield Drilling Services Pvt. Ltd. 2 and
Ferro Concrete Construction (India) Pvt. Ltd. v. State of
Rajasthan,3 to urge that there is a distinction between a clause
barring interest on delayed payments and a clause expressly
prohibiting pendente lite interest.
4.5. It is submitted that the High Court wrongly equated Clause 26
of the SCC with the provisions in Sayeed Ahmed (supra)
2 2025 SCC OnLine SC 1888.
3 2025 SCC OnLine SC 708.
[2026] 10 S.C.R. 457
MS Sharma Enterprises v.
National Building Construction Corporation
and Jaiprakash Associates Limited (JAL) through its
Director v. Tehri Hydro Development Corporation (India)
Limited (THDC) through its Director,4 wherein the clause
expressly prohibited interest and extended “in any other
respect whatsoever”.
4.6. Further reliance is placed upon the decision of this Court
in Union of India v. Larsen & Toubro Limited,5 wherein
interest was explicitly barred on all sums and for pre-award
periods, however Clause 26 of the SCC does not provide
such a restriction.
4.7. It is further submitted that pendente lite interest is awarded
in exercise of statutory power under Section 31(7)(a) of the
1996 Act and such power can be excluded only by clear and
express contractual language, whereas Clause 26 of the
SCC neither expressly bars interest in arbitration proceedings
nor excludes the jurisdiction of the Arbitral Tribunal to award
pendente lite interest.
4.8. Learned counsel for the appellant lastly submitted that the
disputes relate to the year 1992 and the parties have gone
through several rounds of litigation, therefore the learned
arbitrator rightly awarded interest in favour of the appellant
and thus, the impugned judgment is to be set aside.
5. Ms. Shilpi Chowdhary, learned counsel appearing on behalf of the
respondent, opposed the present appeal and made the following
submissions:
5.1. Section 31(7)(a) of the 1996 Act provides for pre-award interest
subject to “unless otherwise agreed by the parties” and thus,
where parties agree to exclude interest, the contract stipulation
binds the Arbitral Tribunal and pre-reference and pendente
lite interest cannot be awarded contrary to the agreement.
Reliance is placed upon Oil and Natural Gas Corporation
Ltd. (supra).
5.2. It is further submitted that Clause 26 of the SCC is not confined
to delayed monthly or final payments. The expression “or
4 (2019) 17 SCC 786.
5 2026 INSC 203.
458 [2026] 10 S.C.R.
Supreme Court Reports
otherwise” is residuary in nature and covers situations not
specifically contemplated in the preceding expressions and it
cannot be confined to the immediately preceding contingency, as
that would add a restriction to which the parties never agreed.
5.3. Reliance is placed upon the decision of Union of India v.
Manraj Enterprises,6 wherein this Court held that where
expressions are separated by ‘or’ and are independent, the
latter expression cannot be restricted by applying ejusdem
generis. Further reliance is placed upon the three-judge
bench decision in Jaiprakash Associates Limited (supra),
wherein this Court held that ejusdem generis can apply only
where the preceding expressions constitute a distinct genus
or category. It is submitted that in Clause 26 of the SCC, the
expressions preceding “or otherwise” do not constitute such
a distinct genus, and thus, the principles of ejusdem generis
and noscitur a sociis are not applicable in the present case.
5.4. Further reliance is placed upon the decision in the case
of Larsen & Toubro Limited (supra), wherein this Court
reaffirmed the principles in Manraj Enterprises (supra) and
Union of India v. Bright Power Projects (India) Private
Limited,7 and held that Section 31(7)(a) of the 1996 Act gives
paramount importance to the contract and restricts the power
of an arbitrator to award pre-award or pendente lite interest
contrary to the agreement.
5.5. It is further urged that while the clause in Oil and Natural Gas
Corporation Ltd. (supra) merely addressed “delayed payment
or disputed claim”, the clauses in Sayeed Ahmed (supra) and
Jaiprakash Associates Limited (supra) contained a wider
prohibition. However, Clause 26 of the SCC is materially wider
and by expressly concluding with the words “or otherwise”
operates as an all-inclusive bar on interest.
5.6. It is submitted that the reliance placed by the appellant upon
Ferro Concrete Construction (supra) is misplaced as it
is based on the 1940 Act and there was no residual clause
unlike the present case.
6 (2022) 2 SCC 331.
7 (2015) 9 SCC 695.
[2026] 10 S.C.R. 459
MS Sharma Enterprises v.
National Building Construction Corporation
5.7. Learned counsel for the respondent lastly submitted that
neither equity can enlarge a contractual entitlement, nor
prolonged litigation can convert an expressly excluded right
into an enforceable one and therefore, the present appeal is
to be dismissed.
6. We have heard learned counsel appearing on behalf of the parties
and perused the record. The question that falls for our determination
is whether Clause 26 of the SCC operates as a contractual bar
within the meaning of Section 31(7)(a) of the 1996 Act barring
the Arbitral Tribunal from awarding pre-reference and pendente
lite interest on the substantive claims allowed in favour of the
appellant.
7. For convenience, it is apposite to examine Clause 26 of the SCC,
which reads as follows:
“26. The sub-contractor shall be paid monthly running
bill for the quantity already executed upto the end of
previous month subject to the approval of quantity
measured unless otherwise specified. The amount so
payable in the estimated value of works shall be paid
upto date, less the amount already paid. If the monthly
interim payment which become payable is not paid due
to any reason, then 75% of the works executed and
measured shall be paid to the sub-contractor as advance
on written request. The payment to the sub-contractor
will be released within seven days of NBCC receiving
its payment from the clients i.e. CIDCO/IRCON.
No claim for interest will be entertained by the corporation
in respect of any balance payments or any deposit which
may be held up with the corporation due to any dispute
between the Corporation and sub-contractor or in respect
of any delay on the part of the corporation in making
monthly or final payments or otherwise.”
Emphasis supplied.
8. Section 31(7) of the 1996 Act provides for the statutory mechanism
governing the award of interest in arbitral proceedings, which is
reproduced hereunder:
460 [2026] 10 S.C.R.
Supreme Court Reports
“31. Form and contents of arbitral award.—
… (7) (a) Unless otherwise agreed by the parties, where
and in so far as an arbitral award is for the payment
of money, the arbitral tribunal may include in the sum
for which the award is made interest, at such rate as
it deems reasonable, on the whole or any part of the
money, for the whole or any part of the period between
the date on which the cause of action arose and the
date on which the award is made.
(b) A sum directed to be paid by an arbitral award shall,
unless the award otherwise directs, carry interest at
the rate of two per cent. higher than the current rate of
interest prevalent on the date of award, from the date
of award to the date of payment.
Explanation.—The expression ‘current rate of interest’
shall have the same meaning as assigned to it under
clause (b) of section 2 of the Interest Act, 1978 (14 of
1978).”
9. Upon perusal of Section 31(7)(a) of the 1996 Act, it is clear that
the power of an Arbitral Tribunal to award interest for the pre-award
period, i.e., from the date on which the cause of action arose up to
the date on which the award is made (including both pre-reference
and pendente lite periods), is expressly subject to the opening
words – “Unless otherwise agreed by the parties”. Section 31(7) of
the 1996 Act has to be construed harmoniously with Section 28(3)
of the 1996 Act, which provides for the Arbitral Tribunal to decide
in accordance with the contractual terms governing the parties.
10. The principles governing contractual prohibitions on interest under
Section 31(7)(a) of the 1996 Act have been recently considered
by this Court in Larsen & Toubro Limited (supra), wherein this
Court examined Clause 16(3) read with Clause 64(5) of the General
Conditions of Contract. Clause 16(3) expressly prohibited interest
on “earnest money and security deposits or amounts payable to the
Contractor under the Contract”, reinforced by Clause 64(5) which
provided that “where the arbitral award is for the payment of money,
no interest shall be payable on whole or any part of the money for
any period till the date on which the award is made”. Reaffirming the
law laid down in Sayeed Ahmed (supra), Sree Kamatchi Amman
[2026] 10 S.C.R. 461
MS Sharma Enterprises v.
National Building Construction Corporation
Constructions v. Divisional Railway Manager (Works),8 Bright
Power Projects (supra) and Manraj Enterprises (supra), this
Court in Larsen & Toubro Limited (supra) held that:
“35. On perusal of Section 28(3) and Section 31(7)(a)
of the Act, it is clear that the statutory scheme itself
subordinates the discretion of the arbitrator to the
contractual provisions governing interest.
…
43. Now, at this stage, it is pertinent to observe that
this Court, thereafter, in the case of Manraj Enterprises
(supra) had an occasion to consider similar issues
involved in the present matter and had considered all
the aforementioned decisions, including the decisions
rendered in the cases of Bright Power Projects (India)
(P) Ltd. (supra), Raveechee and Company (supra)
and Ambica Construction vs. Union of India, (2017) 14
SCC 323 (a three-judge bench judgment of this Court).
After considering the aforesaid decisions as well as
several other decisions referred on the issue, this Court
has observed in para 8 and 11 as under: …
“11. In the said decision in Bright Power Projects
[Union of India v. Bright Power Projects (India)
(P) Ltd., (2015) 9 SCC 695 : (2015) 4 SCC (Civ)
702] , this Court also considered Section 31(7) (a)
of the 1996 Act. It is specifically observed and held
that Section 31(7) of the 1996 Act, by using the
words “unless otherwise agreed by the parties”
categorically specifies that the arbitrator is bound
by the terms of the contract insofar as award of
interest from the date of cause of action to date
of the award is concerned. It is further observed
and held that where the parties had agreed that no
interest shall be payable, the Arbitral Tribunal cannot
award interest. Thus, the aforesaid decision of a
three-Judge Bench of this Court is the answer to
the submission made on behalf of the respondent
8 (2010) 8 SCC 767.
462 [2026] 10 S.C.R.
Supreme Court Reports
that despite the bar under Clause 16(2) which is
applicable to the parties, the Arbitral Tribunal is
not bound by the same. Therefore, the contention
raised on behalf of the respondent that dehors
the bar under Clause 16(2), the Arbitral Tribunal
independently and on equitable ground and/or to
do justice can award interest pendente lite or future
interest has no substance and cannot be accepted.
Once the contractor agrees that he shall not be
entitled to interest on the amounts payable under
the contract, including the interest upon the earnest
money and the security deposit as mentioned in
Clause 16(2) of the agreement/contract between
the parties herein, the arbitrator in the arbitration
proceedings being the creature of the contract has
no power to award interest, contrary to the terms
of the agreement/contract between the parties and
contrary to Clause 16(2) of the agreement/contract
in question in this case.”
…
45. The provisions of the Act of 1996, including provisions
contained in Section 31(7)(a) give paramount importance
to the contract entered into between the parties and
categorically restrict the power of an arbitrator to award
pre-award/pendente lite interest when the parties have
themselves agreed to the contrary. Thus, the AT cannot
award pre-award/pendente lite interest, even in the form
of compensation, in view of specific Clause 16(3) of GCC
read with Clause 64(5) of GCC.”
Emphasis supplied.
11. It is contended on behalf of the appellant that the concluding phrase
“or otherwise” of Clause 26 of the SCC must be interpreted applying
the principles of ejusdem generis and noscitur a sociis to take colour
from the preceding expressions concerning delay in releasing monthly
or final payments and the expression “or otherwise” is restricted to
withholding interest on delayed interim bills and cannot operate as
an absolute bar against the grant of interest on substantive claims
allowed by the Arbitral Tribunal.
[2026] 10 S.C.R. 463
MS Sharma Enterprises v.
National Building Construction Corporation
12. However, we are unable to agree with the said contention. The
doctrine of ejusdem generis becomes applicable only where the
preceding terms of the general phrase follow a specific class forming
a genus, thereby imparting the specific character to the subsequent
general phrase. At this stage, it is relevant to note that where the
provisions in a contract are disjunctively joined by the word “or”,
every such phrase has to be examined independently due to its wide
amplitude. The same issue was considered in Manraj Enterprises
(supra) and subsequently reiterated in paragraphs 38 and 39 of
Larsen & Toubro Limited (supra):
“38. This Court in the decision rendered in the case of
Manraj Enterprises (supra) has considered a similar
submission canvassed on behalf of the party concerned
and thereafter observed and held in para 12.1 as under:
“12.1. It is required to be noted that Clause 16(1)
is with respect to earnest money/security deposit.
However, Clause 16(2) is specifically with respect
to interest payable upon the earnest money or
the security deposit or amounts payable to the
contractor under the contract. The words used in
Clause 16(2) is “or”. Therefore, the expression
“amounts payable to the contractor under the
contract” cannot be read in conjunction with
“earnest money deposit” or “security deposit” by
applying the principle of ejusdem generis. The
expression “amounts payable to the contractor
under the contract” has to be read independently
and disjunctively to earnest money deposit and
security deposit as the word used is “or” and not
“and” between “earnest money deposit”, “security
deposit” and “amounts payable to the contractor
under the contract”. Therefore, the principle of
ejusdem generis is not applicable in the present
case.”
39. Thus, it can be said that the rule of ejusdem generis
is a tool of interpretation and is applicable only where the
general words follow a specific class forming a genus.
The expression “amounts payable to the contractor
under the contract” used in Clause 16(3) is independent,
464 [2026] 10 S.C.R.
Supreme Court Reports
distinct and of wide amplitude, and cannot be read
down to defeat its plain meaning. Thus, the submission
canvassed by the learned counsel for the respondent
cannot be accepted.”
Emphasis supplied.
13. Applying these principles to Clause 26 of the SCC in the present
case, the Clause enumerates the following separate and distinct
events disjunctively joined by the conjunction “or”:
(i) any balance payments or any deposits – which may be held
up with the corporation due to any dispute arising between
the Corporation and the sub-contractor, OR
(ii) in respect of any delay on the part of the corporation in making
monthly or final payments, OR
(iii) otherwise.
14. On careful consideration, it can be inferred that the preceding terms
of the phrase “or otherwise” do not constitute a single, narrow
genus restricted to delayed running payments and also include
balance payments, withheld deposits and amounts withheld due to
disputes. Consequently, the expression “or otherwise” is residuary in
nature and has been consciously incorporated with wide amplitude
to encompass every other conceivable circumstance under which
a claim for interest might be asserted against the Corporation. In
Lilavati Bai v. State of Bombay,9 the Constitution Bench of this
Court held that the words “or otherwise” cannot be restricted by
reference to the preceding expressions and were held to be words
of extension and not limitation. Thus, restricting the scope of the
expression “or otherwise” to only delays in monthly or final payments
would render the term redundant and would amount to rewriting the
contract entered into between the parties.
15. The reliance placed by the appellant upon Oil and Natural Gas
Corporation Ltd. (supra) is also misplaced. In the said decision,
the contractual clause was narrowly worded as “no interest shall be
payable by ONGC on any delayed payment / disputed claim”, and
9 (1957) 1 SCC 411.
[2026] 10 S.C.R. 465
MS Sharma Enterprises v.
National Building Construction Corporation
did not incorporate any residuary expression and thus, this Court
observed that a stipulation merely restricting interest on delayed
payments cannot be construed as an absolute bar on pendente lite
interest. However, in the said case, this Court itself recognized that
where the contract prohibits granting pendente lite interest either
expressly or by necessary implication as in the case of Sayeed
Ahmed (supra) and Jaiprakash Associates Limited (supra), the
power of the arbitral tribunal to grant pendente lite interest stands
excluded.
16. In contrast, in the present case, Clause 26 of the SCC concludes
with the residuary phrase “or otherwise”. In Sayeed Ahmed (supra),
the clause provided “G1.09. No claim for interest or damages will
be entertained by the Government with respect to any money or
balance which may be lying with the Government or any become
due owing to any dispute, difference or misunderstanding between
the Engineer-in-Charge on the one hand and the contractor on the
other hand or with respect to any delay on the part of the Engineer-
in-Charge in making periodical or final payment or any other respect
whatsoever.” A similar clause was in question in the decision of
Jaiprakash Associates Limited (supra). Therefore, the High
Court rightly concluded that incorporating the residuary term “or
otherwise” stands on identical footing with the terminology “or any
other respect whatsoever” interpreted in Sayeed Ahmed (supra)
and Jaiprakash Associates Limited (supra), thereby operating
as a contractual prohibition against granting pre-reference as well
as pendente lite interest.
17. At this stage, it is also imperative to observe the distinction between
pre-award interest under Section 31(7)(a) and post-award interest
under Section 31(7)(b) of the 1996 Act, i.e., Section 31(7)(a) is
expressly subject to the contract between the parties whereas,
Section 31(7)(b) provides for grant of post-award interest unless the
arbitral tribunal orders otherwise. This Court in Larsen & Toubro
Limited (supra) observed as under:
“47. With regard to the post-award interest,
Section 31(7) (b) of the Act provides that unless the
award otherwise directs, the sum awarded shall carry
interest from the date of the award till payment. The
legislative intent underlying this provision is twofold:
466 [2026] 10 S.C.R.
Supreme Court Reports
first, to compensate the successful party for delayed
realization of the award, and second, to ensure prompt
compliance with the award by the judgment-debtor.
48. Recently, this Court in the case of R.P. Garg (supra),
has observed and held in para 9, 11 and 12 as under:
“… 11. So far as the entitlement of the post-
award interest is concerned, sub-Section (b) of
Section 31(7) provides that the sum directed to be
paid by the Arbitral Tribunal shall carry interest. The
rate of interest can be provided by the Arbitrator
and in default the statutory prescription will apply.
Clause (b) of Section 31(7) is therefore in contrast
with clause (a) and is not subject to party autonomy.
In other words, clause (b) does not give the parties
the right to “contract out” interest for the post-award
period. The expression ‘unless the award otherwise
directs’ in Section 31(7)(b) relates to rate of interest
and not entitlement of interest. The only distinction
made by Section 31(7)(b) is that the rate of interest
granted under the Award is to be given precedence
over the statutorily prescribed rate. The assumption
of the High Court that payment of the interest for
the post award period is subject to the contract is
a clear error. …”
Emphasis supplied.
Therefore, the High Court rightly recognized this statutory distinction
and restricted its interference to setting aside the pre-reference and
pendente lite interest, while maintaining the award of post-award
interest in favour of the appellant.
18. In light of the aforesaid analysis and discussion, the learned Arbitrator,
being a creature of the contract, acted beyond his jurisdiction in
granting pre-reference and pendente lite interest in contravention
of Clause 26 of the SCC, which attracts Section 31(7)(a) of the
1996 Act. Thus, the High Court rightly acted under Sections 34
and 37 of the 1996 Act in setting aside the arbitral award dated
28.07.2016 to that limited extent, while maintaining the substantive
claims of the appellant and post-award interest in favour of the
[2026] 10 S.C.R. 467
MS Sharma Enterprises v.
National Building Construction Corporation
appellant. Therefore, we find no error in the impugned judgment
dated 20.03.2026 passed by the Division Bench of the High Court
of Delhi in FAO(OS) (COMM) No. 18 of 2026, affirming the judgment
of the learned Single Judge dated 19.11.2025 in O.M.P. (COMM)
No. 215 of 2022.
19. Accordingly, the present appeal is dismissed.
20. Pending applications, if any, shall stand disposed of.
Result of the case: Appeal dismissed.
†
Headnotes prepared by: Divya Pandey