2026 INSC 737

Mahabanoo v. Kalikund Developers (M/s)

Neutral Citation
2026 INSC 737
Date
23.07.2026
Year
2026
Source in the index
sci.gov.in neutral-citation

Full text

2026 INSC 737
Non-Reportable

IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION

Civil Appeal No.9342 of 2026
(@ Special Leave Petition (C) No.4498 of 2026)

Mrs. Mahabanoo Contractor and Anr.
….Appellants
Versus

M/s. Kalikund Developers and Ors.
….Respondents
JUDGMENT

K. VINOD CHANDRAN, J.

Leave granted.

2. The appellants assert their status as ‘occupant’ and seek

enforcement of the Permanent Alternate Accommodation

Agreement (PAAA) dated 17.10.2019 produced as Annexure P4.

3. The respondent is the owner-developer of the building who

obtained consent and possession from various occupants of the

building; tenants continued for long in the cessed building, found

unfit for human habitation by the local authority for the purpose of

demolition and reconstruction/redevelopment on the assurance
Signature Not Verified

Digitally signed by

that all the occupants will be provided alternate premises for
VISHAL ANAND
Date: 2026.07.23
16:34:44 IST
Reason:

occupation in the reconstructed building. The 1st respondent had

Page 1 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

proceeded for such redevelopment under the Maharashtra

Housing and Area Development Act, 1976 (MHAD Act) on the basis

of a No Objection Certificate (NOC) issued by the Maharashtra

Housing and Area Development Authority (MHADA). The MHADA

has overall supervision and is the regulatory authority under the

MHAD Act and Development Control Regulations for Greater

Bombay, 1991 (DC Regulations) inter alia ensuring

reconstruction/redevelopment of cessed buildings and also

securing alternate accommodation to the occupants of the old

building; who vacated the premises and gave consent for such

redevelopment, as per the agreements entered into.

4. The 1st appellant was an occupant with another, Ms. Gool

Peshotan Unwalla, who died leaving the appellants together, as

sole legal heirs entitled to succeed to her estate; the estate being

the occupancy status in Room No.5 of the Third Floor of the old

building. The MHADA after completion of the redevelopment

issued two orders dated 28.05.2025 & 27.06.2025 and a Show Cause

Notice (SCN) dated 10.07.2025; which were challenged in a writ

petition before the High Court of Bombay. The first two impugned

orders directed the 1st respondent to execute the PAAA in favour

of the appellants as per the certificate of probate dated 30.01.2024

Page 2 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

and register it as specified in PAAA and handover possession of

the promised premises to the appellants. The SCN was against non-

compliance of the earlier orders, threatening action under Section

91A of the MHAD Act.

5. A Division Bench of the High Court in the writ petition filed by

the developer found that there was complete non-application of

mind by the MHADA since the original proposal was to build 34

floors now confined to 30 floors. The developer’s contention was

that since the height was confined to 30 floors, the fungible Floor

Space Index (FSI) was not utilized and hence the area available for

reallotment would be lesser than that agreed to be accorded as a

benefit to the different tenants who were in occupation earlier. It

was noticed that the developer offered two flats with carpet area of

2108 sq. ft. (1054 sq. ft. each) comparable to the area occupied

prior to redevelopment, which according to the appellants fell

short of the agreed upon area in the PAAA. It was found that the

PAAA was a private arrangement, not amenable to writ

jurisdiction; an appropriate remedy being available only before

the civil court. The concession made by the 1st respondent that two

flats would be kept encumbrance free till appropriate orders are

passed in a civil suit, the writ petition stood disposed of. The

Page 3 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

Division Bench finding non-application of mind injuncted the

MHADA from taking any further coercive steps as per the

impugned orders and the SCN. The directions left the parties in

limbo since though the undertaking of the developer that no

encumbrance will be created on two flats till the civil court decides

the matter was recorded, there was in fact no civil case pending

between the parties.

6. A civil suit bearing CS No.4579 of 2026 was filed only on

06.02.2026, after the impugned judgment before the High Court of

Bombay, by the developer. The plaint produced in the counter

affidavit as Annexure – 1 indicates that the prayers made are

against the very claim of the appellants, who are defendants 4 & 5

therein, for allotment in the reconstructed building, either as an

occupant or as the legal heir of the deceased occupant, of the

entire 3336.92 sq. feet area; quite contrary to and in violation of the

undertaking made before the High Court. The PAAA is also

challenged in its entirety as invalid, nonest and unenforceable.

7. Mr. Shyam Divan, learned Senior Counsel appearing for the

appellants would emphasize on the definition of the term

‘occupant’ as available in the MHAD Act and Rule 33(7) of the DC

Regulations which is the reigning consideration in identification of

Page 4 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

persons entitled to allotment in a project for

reconstruction/redevelopment of cessed buildings. Mr. Divan, in

addition to the PAAA pointed out various documents in which the

1st appellant, who along with the 2nd appellant is the legal heir and

the joint occupant of one Ms. Gool Peshotan Unwalla. Various

proceedings before the MHADA are also referred to, in which the

only dispute raised in reallotment was that the appellants had no

right to such allotment under the redeveloped project since the

original occupant had died. The first appellant has the status of an

‘occupant’ and the appellants are the only legal heirs of the other

occupant, which is evidenced from the probate proceedings

issued by the competent court.

8. The High Court misconstrued the PAAA as a private

arrangement, especially since it was entered into under a statutory

scheme as provided under the MHAD Act and the DC Regulations

which facilitated redevelopment/reconstruction of cessed

buildings so that the landlord could avail the benefit of having

additional space while ensuring that the tenants who were

continuing in the old building is not thrown out to the streets. The

PAAA is regulated by the statute and the regulations, the

enforcement of which is an authority conferred on the MHADA

Page 5 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

under whose NOC the project itself is commenced. The space as

delineated in the PAAA by the developer has to be necessarily

handed over to the appellants is the contention.

9. Mr. Vinay Navare, learned Senior Counsel, on the other hand

submits that the PAAA is a concocted document. It was entered into

by a person who was expelled from the 1st respondent for

misdemeanours carried out without proper authorisation, one of

which was the instant PAAA. It is further pointed out from the

affidavit in reply filed by the 1st appellant before the High Court, as

produced at Annexure P11, that the probate proceedings are

noticed as Testamentary Petition No.1607 of 2022 initiated on

27.02.2022 based on the Will of 27.05.2009. While the PAAA dated

17.10.2019 speaks of an application for grant of probate of the last

Will and testament of Ms.Gool Peshotan Unwalla is pending. It is

asserted that Ms. Unwalla was the original tenant and the only

tenant of Room No.5 situated on the third floor of the building, and

the recital including the 1st appellant as ‘occupant’ along with the

original tenant was only by mistake. It is further argued that in the

certified list approved by MHADA the 1st appellant appears only in

the column of ‘occupants’ and not as a ‘tenant’ and she has no right

to get allotment on redevelopment, especially when the rent

Page 6 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

receipts, the contemporaneous electricity and telephone bills and

the notarized irrevocable consent for redevelopment are in the

sole name of the original tenant.

10. It is argued that the original tenant passed away on

21.03.2012 and she was the sole occupant of the whole premises.

The appellants as legal heirs have no right to succeed to the

tenancy which stood extinguished on the death of the original

tenant. It is also argued that as per the certified list, the total carpet

area of the original tenement was 185.09 sq. mtrs. against which

the total built up area as per the PAAA comes to 219.81 sq. mtrs.;

far in excess. It is urged, without prejudice, that if at all, the

appellants are only entitled to two flats each having an area of 1054

sq. ft. (Flat No.1403 and 1702) comparable to the area occupied in

the original tenement, which was offered to the appellant even

before the High Court, which offer was declined. It is urged that

even now the 1st respondent is ready to concede the said two flats

to the possession of the appellants while the appellant has

absolutely no right over the third premises, which is far in excess

of the space occupied in the original tenement. The suit now filed

before the High Court too is also urged to restrain us from

interfering with the impugned order which had left the parties to

Page 7 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

agitate their cause before the civil court which is the remedy as

available to the parties to the dispute.

11. Mr. Chirag M. Shroff, learned counsel appearing for the

MHADA emphasized that it is the statutory authority which issues

an NOC for redevelopment under Regulation 33(7) of the DC

Regulations read with Appendix III thereof for old, cessed

buildings. There is a statutory procedure involving the preparation

of a certified list of eligible occupants which certified Ms. Unwalla

and the 1st appellant as eligible tenant/occupant. The orders

passed by MHADA is only to facilitate due occupation by the

eligible tenants/occupants who have vacated the land for the

purpose of redevelopment/reconstruction on the basis of the NOC

issued by MHADA. Only if the PAAA is executed, registered and

the possession handed over to all the original certified occupants

the developer gets a right to seek ‘Occupation Certificate’. It is

asserted that MHADA had exercised its statutory powers

judiciously and in the best interest of the tenant/occupants based

on the records which were submitted by the 1st respondent itself

for the purpose of NOC.

12. The MHAD Act defines only ‘occupier’ under Section 2 (25)

which includes (i) any person who is liable to pay to the owner the

Page 8 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

rent or any portion of it; (ii) the owner in occupation or otherwise

using his land or building; (iii) a rent-free tenant; (iv) a licensee in

occupation; or (v) any person who is liable to pay damages for the

use and occupation; of land and building. An occupancy, hence is

not a statutory tenancy which continues at the will of the owner or

on the strength of an agreement. A person in occupation without

any rent, or liable to pay the owner damages, brings in even a rank

trespasser who can have a valid claim of occupancy based only on

her possession enabling reallotment of space, when there is

attempted a redevelopment/reconstruction. Rule 33(7) under

which the proceedings of redevelopment/reconstruction clearly

provides for the application of MHAD Act and specifies landlords

and/or ‘occupiers’ of a cessed building.

13. Annexure P1 is the public notice issued by the respondent

initiating the process for obtaining the NOC of MHADA for the

building known as “18/20, 20C, 20D, 20A, 20F, WIMBRIDGE

COMPOUND” situated at N.B. Marg, Grand Road (W), free from all

encumbrances but subject to monthly tenancies clearly shown in

the statement as appended to the public notice. At Item No.24 of

the first column having the heading ‘Name of the tenants’ appears

Mrs. Gool Peshotan Unwalla, while in the next column for

Page 9 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

‘Occupants’ along with the original tenant, the 1st appellant’s name

is also shown. The public notice specifically called upon any

person having claim or interest against the same property to

proffer their claim, in writing, to the developer/owner within 15

days of the publication. Relevant is the fact that the public notice

issued by the developer/owner as early as in 2010, when the

original tenant was alive showed the 1st appellant to be in joint

occupation of the premises in the old building. There is also no

allegation that any other person had made a claim to the specified

premises shown to have been occupied by the original tenant and

the 1st appellant any time after the public notice dated 21.04.2010.

14. The NOC issued by the MHADA is produced as Exhibit 15 in

I.A. No.42662 of 2026 which is dated 21.09.2010; which is obviously

after the public notice and presumably since no claims were raised

or those raised were settled amicably. The NOC stipulates that all

occupants of the old building shall be accommodated in the

redeveloped building and given equal carpet area as occupied by

her for residential purposes, subject to a minimum and maximum

as provided in the MHAD Act. Clause (2) specifies that the

tenements in the reconstructed building shall be allotted by the

landlord to the occupiers as per the list certified by the Mumbai

Page 10 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

Repairs and Reconstruction Board (MBRR Board). Clause (15)

brings in a rigor in so far as the full and final occupation certificate

for any free sale building/component would be given only after all

the occupants as certified by the Executive Engineer of the MBRR

Board, including those staying in the pre-transit camps are housed

in the newly constructed buildings. This ensures that the

owner/developer would be entitled to its share of the additional

space in the new building only after complete rehabilitation of the

‘occupants’ of the old building. The list of certified tenants

appended to the NOC as certified by the Executive Engineer of the

MBRR Board also shows Ms. Unwalla as the tenant and herself and

the 1st appellant as the occupants, as was shown in the public notice

of the owner/developer. The revised NOC as available in the same

I.A. produced as Exhibit E dated 21.08.2012 reiterates the above

mandate.

15. The PAAA, Annexure P4 executed on 17.10.2019 concedes to

the 1st appellant 219.81 sq. mtrs. + 35% fungible area i.e. in all,

309.98 sq. mtrs. and thus one flat of 1227.42 sq. ft and two flats of

1054.75 sq. feet each. Clause (v) of the said agreement stipulating

the above area measurements also speaks of the said area being

inclusive of fungible area as permissible under DC Regulations; to

Page 11 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

be constructed in the new building with three covered parking

space in the Podium; which are referred to as the Permanent

Alternate Accommodation. On the very same day, the possession

is handed over to the 1st respondent as per Annexure P25

produced in I.A. No.187553 of 2026. Pertinently, the possession

was handed over by the 1st appellant, the original tenant having

died in the year 2012. Annexure P25 specifically indicates the

possession having been accepted by the developer/owner, which

document is not at all disputed.

16. The approved plan was amended on 30.06.2021 by the 1st

respondent which is produced as Annexure P16 in I.A. No.42662 of

2026. As per Annexure P16 the amended plan, Ms. Unwalla was in

occupation of carpet area excluding balcony of 294.95 sq. mtrs.

(Column 9) and the built-up area as per the plan of rehabilitation is

shown as 324.45 (Column 19) while the total area of the three flats

would come to 309.98 sq. mtrs. (3336.50 sq. feet). The approved

plan, as amended and the measurement shown therein more or

less align with the measurement of the premises which was agreed

to be conceded to the 1st appellant, as per the PAAA.

17. Despite the further communication of MHADA to the

developer as per Annexure P26 dated 22.11.2022 to comply with

Page 12 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

the extended time limit i.e., up to 21.09.2023 the flats in the

reconstructed building were not handed over. The 1st appellant

approached the MBRR Board as per Annexure P27 dated

10.06.2024 seeking MHADA’s intervention to register the PAAA

and handover vacant and peaceful possession of the premises in

the new building. The continued refusal of the developer to

handover the premises to the appellants resulted in the orders

which were impugned before the High Court.

18. The writ petition filed is produced as Annexure P9 in which

the appellant has produced a consent affidavit of 26.02.2009,

showing the appellant as an occupant, which is alleged to have

been stated wrongly. The other documents, including the certified

list of tenants were also alleged to have shown the name wrongly;

all of which are documents which are even prior to the date of the

public notice in the year 2010. It is alleged that the person who

executed the PAAA on behalf of the developer, though was

authorised to represent the developer, serious disputes arose

between the present managing partners and the said person and

his associates, resulting in criminal/arbitration proceedings

having been initiated against them. It is also stated that it was in

March-April 2024 that the present partners came into the

Page 13 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

management of the company. It is pertinent that after the present

management came into office, there was neither communication

addressed to the MHADA against the PAAA or the validity of the

claim of the 1st appellant as an occupant nor was any denial of such

claim addressed to the 1st appellant herein whose name admittedly

was available in all the contemporaneous documents as an

occupant from 2009 when the consent affidavit was obtained.

19. The anomaly pointed out by the learned Senior Counsel; the

PAAA in its recital having noticed the pendency of a probate

application, which admittedly was initiated much later does not

vitiate the agreement as such. Even without a probate, the 1st

appellant was entitled to the premises as an occupant as per the

documents of MHADA and the developer. Further the consent

obtained for redevelopment and the possession handed over was

specifically from and by the 1st appellant. The developer cannot

casually after all these years having obtained a consent, leading to

vacation of premises and possession being handed over for the

purpose of redevelopment, on the promise of allotment of

premises as specified in the PAAA, turn around and challenge the

very claim raised by the 1st appellant as an occupant. The probate

Page 14 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

if at all is by way of abundant caution since the developer had

defaulted to handover the premises even after its completion.

20. The writ petition in its averments also speaks of the inter se

dispute between the partners of the developer, having been

settled by mutual understanding, having been reduced into

writing as per the Consent Terms dated 09.03.2024. It is the

contention of the developer that as per the Consent Terms, any

writing, document or agreement executed by the earlier partners

with the original tenant or her heirs or Respondent No. 4 herein

shall not be binding on the first respondent firm in any manner. We

are surprised to see such a contention having been raised in a writ

petition, especially since there is no averment as to the

beneficiaries of the agreements executed by the erstwhile

authorised partner, having been made a party to the Consent

Terms. The settlement of inter se disputes between the partners

without the junction of the beneficiary of the PAAA, who has the

right to seek a validly executed conveyance and handover of the

premises, cannot absolve the developer from his obligations as

per the validly executed agreement based on which vacant

possession of the premises was obtained, the old premises

demolished and the new building constructed wherein the earlier

Page 15 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

occupants had a clear claim for allotment of alternate premises

with excess fungible area.

21. The mere fact that fungible area was not fully utilised cannot

be a ground to allow the developer to resile from its agreement to

redevelop and allot alternate premises to the occupants of the old

building as agreed upon. Significant is also the fact that despite the

Consent Terms having been brought into effect in the year 2024

and the 1st appellant having raised a claim before MHADA in which

the developer also participated the order dated 28.05.2025

indicates that the Advocate who appeared on behalf of the

developer raised only a contention that the 1st appellant did not

produce any document showing her relationship with Ms. Unwalla

who was again pointed out as certified along with the 1st appellant

as the occupant of Room No.5 in the third floor of the captioned

property. The MHADA by the said order after looking at the

documents directed execution of the PAAA with the 1st appellant as

per the probate dated 30.01.2024.

22. As we already observed, even without the probate, the 1st

appellant was entitled to the premises in the new building as per

the PAAA executed with her; validating her status as an occupant

which cannot be merely brushed aside as having been wrongly

Page 16 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

executed which contention falls in the wake of the various

contemporaneous documents in which she was clearly shown as

the occupant. The orders dated 28.05.2025 and 27.06.2025 passed

by the MHADA which are produced as Annexures P6 and P7 are

perfectly sustainable under the statutory scheme of

reconstruction/redevelopment of cessed buildings. The failure of

the developer to comply with the orders led to initiation of SCN

dated 10.07.2025 which is produced as Annexure P8. The final

order of MHADA passed on 30.10.2025 was passed immediately

after the impugned order of the High Court; obviously without

being made aware of the restrain issued in the impugned order.

23. We are satisfied that the impugned judgment erred in

restraining MHADA from taking further proceedings as per the

orders issued against the developer with respect to the execution

of the PAAA, handing over of possession of premises to the 1st

appellant herein and the show cause notice issued. We set aside

the impugned judgment of the High Court and in that circumstance

Annexure P10 order is revived which we find to be perfectly valid

and sustainable in the facts and circumstances of the case.

24. In this context, we have to also notice the suit filed by the

developer after the undertaking before the High Court that the two

Page 17 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

flats were conceded by the developer as the 1st appellant’s

entitlement. Reliefs were sought challenging the PAAA in its

entirety and also seeking interference to the very claim raised by

the 1st appellant as a joint occupant of the premises in the old

building. We are of the opinion that the Civil Suit itself is

misconceived and mala fide in the context of the undertaking given

before the High Court which is sought to be resiled from, which

more than reflects the conduct of the developer/landlord.

25. We direct the 1st and 2nd respondents to execute the PAAA

and handover possession of the three apartments in the new

building within a period of two months from today, failing which

the appellants would be entitled to the damages at the monthly

rental value for the three flats in that location, which they would be

entitled to recover from the 1st and 2nd respondents. We also make

it clear that the appellants would be entitled to sue for damages for

the delay caused in delivering the property, computed on the

value as hereinabove mentioned. In the interest of justice, we are

also of the opinion that the High Court be directed not to proceed

with Civil Suit No.4579 of 2026.

26. With the above directions, the appeal stands allowed with

costs of Rs.50,000/- (Rupees Fifty Thousand) each before the High

Page 18 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026

Court and this Court, payable by the 1st and 2nd respondents to the

appellants herein.

27. Pending application(s), if any, shall also stand disposed of.

……………………………… J.
(J. B. PARDIWALA)

..………….…………………. J.
(K. VINOD CHANDRAN)
NEW DELHI;
JULY 23, 2026.

Page 19 of 19
Civil Appeal @ SLP (C) No. 4498 of 2026